• Title/Summary/Keyword: design-build project

Search Result 221, Processing Time 0.025 seconds

Strategy Considerations in Genome Cohort Construction in Korea (한국 유전체 코호트 구축의 전략적 고려사항)

  • Sung, Joo-Hon;Cho, Sung-Il
    • Journal of Preventive Medicine and Public Health
    • /
    • v.40 no.2
    • /
    • pp.95-101
    • /
    • 2007
  • Focusing on complex diseases of public health significance, strategic issues regarding the on-going Korean Genome Cohort were reviewed: target size and diseases, measurements, study design issues, and follow-up strategy of the cohort. Considering the epidemiologic characteristics of Korean population as well as strengths and drawbacks of current research environment, we tried to tailor the experience of other existing cohorts into proposals for this Korean study. Currently 100,000 individuals have been participating the new Genome Cohort in Korea. Target size of de novo collection is recommended to be set as between 300,000 to 500,000. This target size would allow acceptable power to detect genetic and environmental factors of moderate effect size and possible interactions between them. Family units and/or special subgroups are recommended to parallel main body of adult individuals to increase the overall efficiency of the study. Given that response rate to the conventional re-contact method may not be satisfactory, successful follow-up is the main key to the achievement of the Korean Genome Cohort. Access to the central database such as National Health Insurance data can provide enormous potential for near-complete case detection. Efforts to build consensus amongst scientists from broad fields and stakeholders are crucial to unleash the centralized database as well as to refine the commitment of this national project.

Development of Construction Schedule Management System based on BIM (BIM데이터를 활용한 건설공사 일정관리 시스템 개발 연구)

  • Park, So-Hyun;Song, Jeong-Hwa;Oh, Kun-Soo
    • Journal of the Architectural Institute of Korea Structure & Construction
    • /
    • v.34 no.3
    • /
    • pp.61-68
    • /
    • 2018
  • As construction projects become larger, higher and more complex, efficient use of information is increasingly more important. As a result, there is a growing demand to apply BIM data obtained in the design stage to the construction stage. In this study, we propose a BIM-based construction schedule management system in order to promote introduction and application of BIM in the construction stage. Specifically, we provided how to build BIM database to be used for construction schedule management, and proposed how to obtain progress information and enter information based on analysis of progress schedule. We also provided a system of classifying construction works for more systematic use of BIM database, a process of using BIM database in construction projects, and a step-by-step guideline on how to establish the system. The proposed construction schedule management system provides information on particular construction schedule, as well as information and progress chart on delayed parts of the work so that a change in schedule can be managed. Additionally, by linking system database with the BIM model, construction progress can be checked in 3D simulation and a delay in construction schedule can be managed. As a result, using BIM at construction sites contributes to improving project productivity.

A Proposal Research of Assessment Standards for Ordering BIM-based Projects in Railway Infrastructure - Case Study on Application of Existing Projects - (철도인프라 BIM기반 공사 발주를 위한 평가기준 제안 연구 - 기존 발주사업 적용 사례를 통해 -)

  • Son, Seo-Yeon;Lee, Geun-Il;Jung, Ji-Hyun;Moon, Woo-Hyoung
    • Journal of KIBIM
    • /
    • v.11 no.4
    • /
    • pp.10-19
    • /
    • 2021
  • In the evaluation for ordering BIM-based projects (Design Build) of Korean National Railway, criteria of BIM-based smart construction technology are assessed. Unlike the existing assessment criteria, performance resources and detailed assessment guidelines have been added by this research. The purpose of this study is to propose qualification assessment standards according to specific guidelines when evaluating on the phase of bidding for BIM-based projects. In the study, an improved evaluation standard (draft) was arranged based on two consultation meetings and surveys of related companies, applied to existing projects with the companies that won the bid, and validated. As more specific and added criteria compared to the existing standards, it could reduce the difficulty of evaluation for BIM capability and lay the foundation for railway BIM-based project management.

Comparison of measured values and numerical analysis values for estimating smart tunnel based groundwater levels around vertical shaft excavation (수직구 굴착시 스마트 터널기반 지하수위 현장계측과 수치해석 비교 연구)

  • Donghyuk Lee;Sangho Jung
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.26 no.2
    • /
    • pp.153-167
    • /
    • 2024
  • Recently the ground settlement has been increasing in urban area according to development. And, this may attribute a groundwater level drawdown. This study presents an analysis of groundwater level drawdown for circular vertical shaft excavation of 「◯◯◯◯ double track railway build transfer operate project」. And, in-situ monitoring data and numerical analysis were compared. So, if we examine the groundwater level drawdown in design, ground conditions should be applied so that the site situation can be reflected. And, groundwater level should be considered a seasonal measurement in order to apply the appropriate groundwater level. It was confirmed a similar predicted value to groundwater level drawdown of in-situ monitoring data.

A Study on Development of Prototype Test Train Design in G7 Project for High Speed Railway Technology (G7 고속전철기술개발사업에서의 시제차량 통합 디자인 개발)

  • 정경렬;이병종;윤세균
    • Archives of design research
    • /
    • v.16 no.4
    • /
    • pp.185-196
    • /
    • 2003
  • The demand for an environment-friendly transportation system, equipped with low energy consumption, and low-or zero-pollution has been on the increase since the beginning of the World Trade Organization era. Simultaneously, the consistent growth of high-speed tram technology, combined with market share, has sparked a fierce competition among technologically-advanced countries like France, Germany, and Japan in an effort to keep the lead in high-speed train technology via extensive Research and development(R&D) expenses. These countries are leaders in the race to implement the next-generation transportation system, build intercontinental rail way networks and export the high-speed train as a major industry commodity. The need to develop our own(Korean) 'high-speed train' technology and its core system technology layouts including original technology serves a few objectives: They boost the national competitive edge; they develop an environmental friendly rail road system that can cope with globalization and minimize the social and economic losses created by the growing traffic-congested delivery costs, environment pollution, and public discomforts. In turn, the 'G7 Project-Development of High Speed Railway Technology' held between 1996 and 2002 for a six-year period was focused on designing a domestic train capable of traveling at a speed of 350km/h combined and led to the actual implementation of engineering and producing the '2000 high-speed train:' This paper summarizes and introduces one of the G7 Projects-specifically, the design segment achievement within the development of train system engineering technology. It is true that the design aspect of the Korean domestic railway system program as a whole was lacking when compared with the advanced railroad countries whose early phase of train design emphasized the design aspect. However, having allowed the active participation of expert designers in the early phase of train design in the current project has led to a new era of domestic train development and the implementation of a way to meet demand flexibly with newly designed trains. The idea of a high-speed train in Korea and its design concept is well-conceived: a faster, more pleasant, and silent based Korean high-speed train that facilitates a new travel culture. A Korean-type of high-speed train is acknowledged by passengers who travel in such trains. The Korean high-speed prototype train has been born, combining aerodynamic air-cushioned design, which is the embodiment of Korean original design of forehead of power car minimized aerodynamic resistance using a curved car body profile, and the improvement of the interior design with ergonomics and the accommodation of the vestibule area through the study of passenger behavior and social culture that is based on the general passenger car.

  • PDF

Characteristic Analysis of Major Issues in Negotiating Concession Agreement for BTO Projects Using AHP (AHP 기법을 이용한 BTO 민간투자사업 협상의 주요쟁점 특성분석)

  • Roh, Tae-Ho
    • The Journal of the Korea Contents Association
    • /
    • v.7 no.8
    • /
    • pp.234-244
    • /
    • 2007
  • Both competent authorities and private entrepreneurs face plenty of risks when negotiating BTO(Build Transfer Operation) methods of PPI(Private Participations in Infrastructures) projects. Also, success and failure of projects largely depend on the concession agreement contract. In this study, for more efficient negotiation, major issues are examined, and quantitatively analyzed to find out not only the relationship but also the characteristics of which these issues share. Questionnaire research was conducted through both research and by experts who were divided into an ordering agency, design company and constructor. Characteristics of major issues were quantitatively analyzed using the Likert index method, ANOVA(ANalysis of VAriance) and AHP(Analytic Hierarchy Process) analysis. Case studies were examined in order to estimate construction cost, rates of return, government finance support, level of operation-revenues guarantees, estimating operational costs and usage fees. With these 6 items, relative priority, relative impression which is sensible to risk and extent of difficulty in presenting data which is objective were quantitatively analyzed by the ordering agency, design company and constructor groups. From the analysis, there were some similarities between the design company and constructor groups while there was less of similarities between the ordering agency and design company or constructor. The government is diversifying the methods of project promotion, and PPI project from infrastructure-centered to public culture facilities are being expand. The current study will provide not only supporting efficient negotiation but also revitalizing PPI projects.

A Study on Characteristic Analysis of Major Issues in Negotiating Concession Agreement for BTO Projects Using AHP (계층화분석법에 의한 BTO 민간투자사업 협상의 주요쟁점 특성분석에 관한 고찰)

  • Roh, Tae-Ho;Kim, Jong-Won;Lim, Chang-Sik;Lee, Jong-Chool
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.6
    • /
    • pp.137-146
    • /
    • 2008
  • Both competent authorities and private entrepreneurs face plenty of risks when negotiating BTO(Build Transfer Operation) methods of PPI(Private Participations in Infrastructures) projects. Also, success and failure of projects largely depend on the concession agreement contract. In this study, for more efficient negotiation, major issues are examined, and quantitatively analyzed to find out not only the relationship but also the characteristics of which these issues share. Questionnaire research was conducted through both research and by experts who were divided into an ordering agency, design company and constructor. Characteristics of major issues were quantitatively analyzed using the Likert index method, ANOVA(ANalysis of VAriance) and AHP(Analytic Hierarchy Process) analysis. Case studies were examined in order to estimate construction cost, rates of return, government finance support, level of operation-revenues guarantees, estimating operational costs and usage fees. With these 6 items, relative priority, relative impression which is sensible to risk and extent of difficulty in presenting data which is objective were quantitatively analyzed by the ordering agency, design company and constructor groups. From the analysis, there were some similarities between the design company and constructor groups while there was less of similarities between the ordering agency and design company or constructor. The government is diversifying the methods of project promotion, and PPI project from infrastructure-centered to public culture facilities are being expand. The current study will provide not only supporting efficient negotiation but also revitalizing PPI projects.

An Analysis on Expanding Construction Insurance and Estimating Necessary Budget (건설공사보험 확대 당위성 및 예산소요 분석 연구)

  • Kim, Myeongsoo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.5
    • /
    • pp.94-102
    • /
    • 2014
  • This study analyzes necessity of expanding construction insurance and estimates required budget. Construction insurance is obliged by National Contract Law and Local Contract Law to protect projet owners and contractors from any unexpected construction risk such as financial losses in construction process. Currently the contracts of design-build and alternate-bid projects as well as PQ project, which are greater than 20 billion won, require the contractors to provide construction insurances in Korea. Insurance premiums are borne by the public project owner. Those contractors whose contract volume is less than 20 billion won burden all risks of projects at their cost. This causes equity problem. Because small-and-medium contractors are discriminated against large contractors since insurance-obliged projects are performed by large contractors and insurance premiums are borne by the public project owner. On the other hands, in all engineering projects, regardless of volume, insurance premiums are borne by the project owner. Therefore current regulation has to be improved, by expanding to all public projects. The average ratio of unobliged projects is 46%, in recent 3 years, prime cost of insurance companies is estimated 0.2%. Moreover considering risks of each construction type, prime cost of unobliged works is estimated as 0.13%. Hence additional necessary budget is estimated to be 2.09 billion won if total volume of public work is 3.5 trillion won. And 2.39 billion won is derived if total volume of public projects is 4 trillion won.

A Knowledge-based Approach to Plant Construction Process Planning (지식 기반 플랜트 건설 공정 계획 시스템의 개발)

  • 김우주
    • Journal of Intelligence and Information Systems
    • /
    • v.7 no.1
    • /
    • pp.81-95
    • /
    • 2001
  • Plant construction projects usually take much higher uncertainty and risks than the projects from other domains. This implies the importance of plant construction project management should be more emphasized than the other domain. Especially, the overall successes of the projects often depend on the performance of process planning and scheduling performed at the initial stage of the project. However, most plant construction projects suffer great difficulties in establishing proper process planning and scheduling timely because of unstructureness and dynamicity of environment of the project itself In this paper, we propose a knowledge-based process planning and scheduling approach in a plant construction domain to cope this problem. First, we modulize process planning knowledge and present the knowledge representation scheme. Second, we propose an inferencing mechanism to build a process planning for plant construction based on the represented process planning knowledge. Since our approach automate the initial process planning, which was usually done by manual way, it can improve the correctness and also completeness of the process plan and schedule by reducing the time to plan and allowing simulations on the various situation. We also design and implement this our approach as a real working system, and it is successfully applied to real plant construction cases from a leading construction company in Korea. Based on this success, we expect our approach can be easily applied to the projects of other areas, while contributing to enhancement in productivity and quality of project management.

  • PDF

Social Capital Formation Model in the Resident Participation Greening Projects - For the Greening Project of the Living Area in Seoul - (주민참여형 마을녹화사업의 사회적 자본 형성 모형 - 서울시 생활권녹화사업을 대상으로 -)

  • Lee, Ai-Ran;Cho, Se-Hwan
    • Ecology and Resilient Infrastructure
    • /
    • v.5 no.1
    • /
    • pp.35-44
    • /
    • 2018
  • Social, economic and environmental problems caused by rapid urbanization have been recently overcome by various civic participation projects. Local governance and resident - led partnership through field - based cooperative operating systems from urban regeneration to village projects are considered success factors. Among these, the village greening project which directly affects the residents and requires spontaneity requires the role and cooperation of the various participating actors due to the sharing of public space and private space. Social capital plays a key role in the sustainability and participation of the above - mentioned business as a relational capital centered on trust and participation, network and norms. Therefore, empirical research is needed. In this study, basic research was carried out to build a formation model of social capital in participation - type greening project expanding urban green space system to living area. We analyzed the elements of participation, the components of business progress, and the factors of social capital formation through literature review and in - depth interviews with participating experts. The purpose of this study is to provide basic data of social capital formation model for analyzing sustainability and activation strategies in the future.