• 제목/요약/키워드: design-build project

검색결과 221건 처리시간 0.038초

USE OF OUTPUT SPECIFICATIONS IN PFI HOUSING PROJECTS

  • Patrick T.I. Lam ;Albert P. C. Chan ; Akintola Akintoye ;Arshad Ali Javed
    • 국제학술발표논문집
    • /
    • The 4th International Conference on Construction Engineering and Project Management Organized by the University of New South Wales
    • /
    • pp.389-394
    • /
    • 2011
  • In many parts of the world, low cost housing used to be built and maintained by the governments, based on designs and detail specifications prepared by the public sector with construction carried out by contractors. Results vary due to differences in design standards, workmanship and property management, depending also on the neighbourhood's care of the estates and their pattern of usage. In the UK, where Private Finance Initiative (PFI) has been used for infrastructure projects, there have been successful cases of city estate being transformed by PFI. These PFI housing schemes involve new-build, refurbishment as well as facility management. Unlike traditional construction, which is based on prescriptive specifications, PFI housing is based on output specifications. A study has been undertaken to compare the two specification approaches as they are applied to housing estate. Results are enlightening and serve as good reference to cities such as Hong Kong SAR and Singapore, where public housing provisions have been a major concern of their citizens as the building stock gets older.

  • PDF

Analysis of Form and Space Changes in Design Process of Free-form Architecture of Culture-Related Facilities in South Korea

  • Ha, Jihee;Jung, Sungwon;Baek, Hyemi;Lee, Hyunjee;Nguyen, Khoa Tan
    • Architectural research
    • /
    • 제16권4호
    • /
    • pp.157-166
    • /
    • 2014
  • This research investigates the design process of free-form architecture to understand the design strategy and changing factors during the development phase and the cause for them. It is aimed to foresee the changing factors from the design process and to reduce design changes. It analyzes the design changes of free-form architecture based on projects with finalized documentation or under construction in South Korea. Many free-form shapes of the free-form architectures have to be adjusted to rigid-form in order to satisfy function and be economical to build. The research finds three patterns in design changes. First, from the factors for design changes: function, constructability, design, program add/subtract, efficiency, circulation; Function and Constructability are the higher factors compared with the rest. The two are the design changes suitable for actual usage and cost savings. Second, each project has different predominant factors for design changes as the degree of free-form is different. Contrary to initial expectation, the greater the degrees of free-form of the competition scheme, the higher the rate of Function among the factors for design changes. Constructability is higher when the degree of the free-form is less than others. It means that the lower the degree of the free-form, the more properly planned the space of the building is. Last, Constructability of free-form architecture is considered during the earlier design phase than definite-form, one by which the design changes by comparing 'Before fixed Space Program' (BSP) and 'After fixed Space Program' (ASP) design changes. The research would be helpful as a reference for setting up competition guidelines to reduce trial and error during the design process.

초·중등학교 민간투자사업(BTL)의 건축공사비의 공종별 비율 분석 (Architectural Work Cost Rate Analysis of Elementary, Middle, and High School Delivered by BTL)

  • 류한국;김형은
    • 교육녹색환경연구
    • /
    • 제14권1호
    • /
    • pp.1-9
    • /
    • 2015
  • 정확한 공사비 추정은 성공적인 프로젝트의 개발에 필수적이다. BTL 사업과 같이 민간투자사업에 있어서 정확한 공사비 산정은 효과적인 예산확보와 파이낸싱에 필수적인 기본 정보가 된다. 공사비 견적의 정확도에 따라 입찰과 제안서의 정확도가 반영되므로 프로젝트를 통한 수익성 여부와 사업타당성을 확보할 수 있다. 본 연구는 정확한 공사비 분석과 활용을 위한 기초적인 연구로써 10년 정도 경과한 초 중등학교 민간투자사업(BTL)의 건축공사비를 분석하여 여러 참여주체들별로 공사를 할 수 있는 건축공사의 공종별 분포비율을 학교급별로 파악한다. 즉, 초 중등학교의 건축 공종별 구성비율을 전체 평균비율, 초등학교, 중학교, 고등학교별로 살펴보고 향후 유사한 공사를 수행하는 경우에 참여주체별로 활용할 수 있도록 하고자 한다.

의료솔루션 사용과 관련된 효율적인 인증서 관리 시스템 설계 및 구현 (Efficient certificate management system design and implementation on the use of medical solutions)

  • 이효승;오재철
    • 스마트미디어저널
    • /
    • 제5권1호
    • /
    • pp.114-121
    • /
    • 2016
  • 현재 각 의료기관들은 의료정보화 사업을 꾸준히 진행 하고 있다. 의료기관에서 운영하고 있는 대표적인 시스템으로는 전자의무기록, 처방전달시스템 등이 있으며, 의료법에서 전자서명을 허용함으로써 의료정보를 관리함에 있어 비용절감 및 진료정보의 공유가 가능하게 되었고, 공인인증서를 활용한 의료솔루션 사용이 확산되어 가고 있다. 이러한 현실에서 인증서의 역할은 어느 무엇보다 중요하다고 할 수 있지만, 대부분 개인 인증서 관리에는 매우 적극적인 반면, 의료솔루션 등 업무와 관련된 인증서 관리에 대해서는 소홀한 것이 사실일 것이다. 업무용 인증서의 경우 업무PC에 보관하는 경우가 다수이며 이는 보안에 취약할 수밖에 없다. 이에 대한 해결책으로 인증서 서버가 존재하나 별도서버의 구축이 필요하여 중소병원의 경우 비용에 대한 부담이 적지 않을 것으로 판단된다. 본 논문에서는 추가비용을 최소화하여 별도의 인증서 서버를 구축하지 않고 인증서 파일을 BLOB로 저장하여 현재의 자원을 활용한 인증서 관리 및 보안에 효과적인 시스템을 설계 및 구현 하고자 한다.

하수종말처리시설 민간투자사업을 위한 계획 인구 및 계획 하수량 추정 (Estimation of Design Population and Design Wastewater Flow Rate for the BTO Project of Wastewater Treatment Facilities)

  • 손영규;이소영;김이형;김지형
    • 한국방재학회 논문집
    • /
    • 제8권1호
    • /
    • pp.145-151
    • /
    • 2008
  • 농어촌지역의 하수종말처리시설 민간투자사업에 대한 계획인구 및 계획하수량 산정 방법을 검토하였다. 기존의 추정 방법에서는 인구 감소 추세임에도 불구하고, 인구가 정체될 것으로 가정하여 계획인구를 추정하고 있으며, 수도보급률이 매우 낮은 지역에서의 계획하수량을 정수장 급수보급량을 이용하여 산정하고 있다. 결과적으로 계획 인구 및 계획하수량의 과다 산정은 필요이상의 하수종말처리시설이 만들어지게 되는 결과를 가져오게 된다. 그러므로 본 연구에서는 계획 인구는 통계청의 장래인구 추계결과를 따르는 것으로 하고, 수도가 보급된 지역에서는 급수사용량을, 수도가 보급되지 않은 지역에서는 지하수 사용량을 이용하여 계획하수량을 산정하는 방안을 제시하였다.

단지공사의 토공구획 계획 모델 (An Earthwork Districting Model for Large Construction Projects)

  • 백현기;강상혁;서종원
    • 대한토목학회논문집
    • /
    • 제35권3호
    • /
    • pp.715-723
    • /
    • 2015
  • 단지 조성을 위한 토공사는 대상 부지의 지형고를 계획고와 맞추기 위한 대규모 토량이동으로 이루어지는 공사로 전체 공사비에 20~30%를 차지하는 중요한 공정이다. 한편 토공사는 주로 적재-운반-하차-복귀의 단순 작업사이클로 구성되어 있어 계획의 품질은 공기와 비용에 매우 큰 영향을 끼친다. 본 연구에서는 대규모 단지 조성 공사에서 토공 운반거리를 최소화할 수 있는 토량구획 모델을 제시하였다. 본 모델은 구획 알고리즘과 simulated Annealing 알고리즘에 기반하고 있으며, 이러한 알고리즘은 국부해에 빠질 수 있는 현행 토공구획 방법을 개선하기 위하여 도입되었다. 제시된 모델의 적용성을 평가하기 위하여 실제 단지공사 토량이동도를 대상으로 시뮬레이션을 실시한 결과 약 14%의 개선효과를 확인하였다.

턴키.대안입찰 설계심의 및 평가제도의 개선방안 (Improvement of Procedures on Design Deliberation System for Turnkey and Alternative-Design Contracts)

  • 박홍태;이양규
    • 한국철도학회논문집
    • /
    • 제14권1호
    • /
    • pp.31-38
    • /
    • 2011
  • 2004년 1월부터 2009년 12월까지 국내 턴키 대안입찰의 적격자 선정방식은 통합설계심의방식에서 기술위원회와 평가위원회를 이원화한 공개토론방식을 도입 운영하여 왔으나, 제도 운영상에서 나타난 문제점을 개선하기 위하여 정부는 2010년 현재 설계심의분과위원회를 크게 중앙, 지방, 특별 설계자문위원회의 분과위원으로 구성하여 운영하고 있다. 그러나 평가과정의 객관성 및 적정성 확보, 대형건설업체의 수주편중현상 그리고 과다경쟁 등이 여전히 문제점으로 제시되고 있다. 이에 이 연구는 일괄 대안입찰공사 설계심의 및 평가에 대한 투명성과 공정성을 제고하고 업무담당자의 심의 평가업무를 효율적으로 운영할 수 있도록 하였다. 또한 기존 공개토론방식의 턴키 대안입찰제도가 건설산업에 미치는 영향, 심의 운영제도, 설계심의 개선사항 및 운영상의 문제점을 분석하여 개선 보완하여 제시하였다.

ODA 지원 베트남 중부 꽝남성 종합병원의 거주후 평가 (Post Occupancy Evaluation of the Central Hospital in Quang Nam Province of Vietnam Funded by Korean ODA)

  • 권순정;유여경;김지현;방설아
    • 의료ㆍ복지 건축 : 한국의료복지건축학회 논문집
    • /
    • 제22권1호
    • /
    • pp.39-49
    • /
    • 2016
  • Purpose: This is the ex-post evaluation on "the Central General Hospital in Quang Nam Province in Vietnam" funded by Korean ODA. Through this evaluation, this study tries to explore useful ways to improve the effectiveness of Korean ODA projects related to hospital establishment. Methods: Field survey and analysis of questionaire to the staffs and patients of Quang Nam Province General Hospital were conducted twice in 2012 and 2014 after the completion of the Hospital. Two sets of surveys and questionaire outcomes have been comparatively analysed by statistics in order to seek the trend of satisfaction level of hospital users and find out the improvement way in hospital design and construction. Results: The satisfaction level on the hospital was relatively high and that of 2014 is higher than that of 2012. The satisfaction level of the users was recorded in Likert 5 scales. Continuous facility complement and maintenance is considered as the main contributor in increasing the satisfaction level of users. As far as the satisfaction level of outpatient is concerned, that of 2012 was recorded as 3.65 and that of 2014 was 4.05. In case of inpatient, the satisfaction level on the hospital in 2012 was 3.76, and 4.06 in 2014. Implications: In overseas hospital projects, proper hospital project management system including medical service plan, strategic plan, brief, design & construction and maintenance have to be put together effectively and efficiently for the success of the hospital project. At the same time local climate, culture, building material and local code have to be considered in order to build sustainable hospital.

근거이론을 활용한 담양 삼다리마을 지역주민의 파트너십 갈등 연구 - 국가중요농업유산 제 4호, 담양 대나무밭을 중심으로 - (A Study on the Partnership Conflict of Damyang Samdari Village Using the Grounded Theory - For Damyang Samdari Village, No.4 National Important Agriculture Heritage -)

  • 김영랑;김은솔;이태겸
    • 농촌계획
    • /
    • 제26권4호
    • /
    • pp.41-52
    • /
    • 2020
  • The purpose of this study is to identify the conflict between residents and governments in partnership arising from the designation of National Important Agricultural Heritage for Damyang Samdari village and to suggest directions for improvement. To this end, residents of Samdari Village in Damyang, designated as an important national agricultural heritage, were interviewed. Interviews were analyzed through grounded theory, categorized into open coding, axial coding, and selective coding, and a paradigm model was constructed. Through this, the central phenomena of resident participation patterns currently appearing in the village were identified, and causal, contextual, and intervening conditions were analyzed. Causal conditions were analyzed as one-sided administrative treatment, assortment matching project, one-time plan, excessive dependence of residents and economic damages of residents at the beginning of the designation of national important agricultural heritage. As a result, conflict between residents and local governments occurred as a central phenomenon, and contextual conditions such as decline in the competitive of bamboo resources and frequent change in managers were also affecting the central phenomenon. As intervening conditions to alleviate the central phenomenon, there are local government's purchase of bamboo fields and fragmentary business effects. The action taken by the residents and officials in response to a fixed conflict is called an action-interaction strategy. Residents refused to change and settled in reality, and local governments avoided conflict. From the beginning of the designation to the present, the villagers gradually lost interest in the National Important Agricultural Heritage due to problems and conflicts that occurred in the process of forming a partnership in the National Important Agricultural Heritage project. Based on the analyzed model, a plan to build the partnership standards on Damyang bamboo field to secure the sustainability of the field and increase the practicality of resident participation, that is partnership, was suggested.

제품자료 객체를 이용한 설계자 네트워크 분석 (Analysis of Networks among Design Engineers Using Product Data Objects)

  • 차춘남;도남철
    • 산업경영시스템학회지
    • /
    • 제39권3호
    • /
    • pp.139-146
    • /
    • 2016
  • This study proposes a methodology to analyse social networks among participating design engineers during product development projects. The proposed methodology enables product development managers or the participating design engineers to make a proper decision on product development considering the performance of participating design engineers. It considers a product development environment where an integrated product data management (PDM) system manages the product development data and associated product development processes consistently in its database, and all the design engineers share the product development data in the PDM database for their activities in the product development project. It provides a novel approach to build social networks among design engineers from an operational product development data in the PDM database without surveys or monitoring participating engineers. It automatically generates social networks among the design engineers from the product data and relationships specified by the participants during the design activities. It allows analysts to gather operational data for their analysis without additional efforts for understanding complex and unstructured product development processes. This study also provides a set of measures to evaluate the social networks. It will show the role and efficiency of each design engineers in the social network. To show the feasibility of the approach, it suggests an architecture of social network analysis (SNA) system and implemented it with a research-purpose PDM system and R, a statistical software system. A product configuration management process with synthetical example data is applied to the SNA system and it shows that the approach enables analysts to evaluate current position of design engineers in their social networks.