• Title/Summary/Keyword: delivery-facility

Search Result 135, Processing Time 0.036 seconds

Bottleneck Detection Framework Using Simulation in a Wafer FAB (시뮬레이션을 이용한 웨이퍼 FAB 공정에서의 병목 공정 탐지 프레임워크)

  • Yang, Karam;Chung, Yongho;Kim, Daewhan;Park, Sang Chul
    • Korean Journal of Computational Design and Engineering
    • /
    • v.19 no.3
    • /
    • pp.214-223
    • /
    • 2014
  • This paper presents a bottleneck detection framework using simulation approach in a wafer FAB (Fabrication). In a semiconductor manufacturing industry, wafer FAB facility contains various equipment and dozens kinds of wafer products. The wafer FAB has many characteristics, such as re-entrant processing flow, batch tools. The performance of a complex manufacturing system (i.e. semiconductor wafer FAB) is mainly decided by a bottleneck. This paper defines the problem of a bottleneck process and propose a simulation based framework for bottleneck detection. The bottleneck is not the viewpoint of a machine, but the viewpoint of a step with the highest WIP in its upstream buffer and severe fluctuation. In this paper, focus on the classification of bottleneck steps and then verify the steps are not in a starvation state in last, regardless of dispatching rules. By the proposed framework of this paper, the performance of a wafer FAB is improved in on-time delivery and the mean of minimum of cycle time.

Process Improvements for Elevating Pre-outfitting Rate of FPSO (FPSO의 선행의장률 향상을 위한 생산관리 및 공법개선 사례연구)

  • Shin, Sung-Chul;Cho, Jong-Burm;Shin, Ki-Young;Kim, Soo-Young
    • Journal of the Society of Naval Architects of Korea
    • /
    • v.46 no.3
    • /
    • pp.325-334
    • /
    • 2009
  • Generally, functional design of FPSO has been done by the engineering firm designated by ship owner. Main equipment such as topside facility is imported from abroad. But sometimes, OFE (Owner Furnished Equipment) does not satisfy the PND (Product Need Date) of each production stage because the delivery date of OFE is not scheduled to satisfy the PND. And sometimes many loose items and equipment are complex from engineering which does not consider pre-outfitting. Main objective of this study is process improvements by maximizing pre-outfitting rate in the stage of equipping STP (Submerged Turret Production), one of main equipment on FPSO. In this study, we analyzed the factors which obstructed pre-equipping STP using the past records of FPSO projects.

A Study on the Types and Supply of Elderly Housing in Japan (일본 노인주거시설의 종류와 공급특성에 관한 연구)

  • Kwon, Soonjung
    • Journal of The Korea Institute of Healthcare Architecture
    • /
    • v.16 no.3
    • /
    • pp.49-56
    • /
    • 2010
  • In Japan, a lot of elderly housing types have been developed in order to meet various needs of the older person and the change of social situations. Elderly housings can be divided into three categories elderly housings for healthy older persons, elderly care homes for the healthy and elderly care facilities for the unhealthy. Elderly housings include public and private rental housings. Sometimes they can be designated only for the elderly. Elderly care homes for the healthy elderly include full fee charging elderly housing, elderly homes, low fee charging elderly homes and care houses. Elderly care facilities for the unhealthy elderly consist of full fee charging elderly care homes, group homes for the dementia, elderly health facilities, nursing homes, elderly hospitals, and so on. However "elderly care facilities" have been proved not to be efficient for the delivery of elderly welfare services nor satisfactory to the frail older person. Therefore, based on the concept of the "Normalization", daily services have been provided for the elderly in order that they can live at their own home in the community for themselves. As a result, Japan aims not only to reduce elderly welfare expenses but also to increase elderly users' satisfaction. Emphasis on non-institutionalization and in-home services, regional characterization, harmony between Hard and Soft, user oriented services, substantiality, universal design and so on are sought for the sake of those goals.

Quantifying Risk Factors on Cost Performance By Characterizing Capital Facility Projects

  • Jang, Myung-Hoon;Cha, Hee-Sung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.4 s.32
    • /
    • pp.177-183
    • /
    • 2006
  • Risk-based estimation has been successfully introduced into the construction industry. By incorporating historical data associated with probability analysis, risk-based estimate is an effective decision support aid in considering whether to launch a particular project. The industry challenges, however, especially related with management issues, such as labor shortage, wage growth, and supply chain complexity, have often resulted in poor cost performance. The insufficient assessing the project characteristics (i.e., resource availability, project complexity, and project delivery method) can be the main reasons in the poor cost performance. Because the accuracy level of cost performance prediction can be enhanced by extensive evaluation of the subject project characteristics, a new approach for predicting cost performance in an earlier stage of a project can improve the Industry substantiality, in other words, value maximization. The purpose of this paper is to develop a new methodology in developing a risk-based estimate tool by incorporating extensive project characteristics. To do this, an extensive industry survey was conducted from both private and public sectors in building industry in Korea. In addition, significant project characteristics were identified in terms of cost performance indicator. Although the data collection is limited to Korean industry the suggested approach provides the industry with a straightforward methodology in risk management. As many researchers maintained that front-end planning efforts are crucial in achieving the successful outcome in building projects, the new method for risk-based estimation can Improve the cost performance as well as enhance the fulfillment in terms of business sustainability.

A Noise Control of a Floating, Production, Storage and Offloading (FPSO) (부유식 석유생산/저장/하역 선박(FPSO)의 소음예측 및 저감)

  • Kim, Dong-Hae;Ko, Kyung-Eun
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 2004.11a
    • /
    • pp.550-553
    • /
    • 2004
  • Recently, the demand for the Floating, Production, Storage, and Offloading facility (FPSO) which has some economic and technical advantages, has increased in offshore oil production areas. The 36,8000 DWT class FPSO was built in Hyundai Heavy Industries and will be installed in Offshore Angola. She dose not have self-propulsion system, but has additional facilities for oil production and positioning system. Main noise sources are contributing to the cabin noise of the accommodation are classified into three classes such as the machinery in the engine room and the deckhouse, HVAC system, and the topside equipments. In general, the noise regulation for the offshore structure is severer than that of the cargo ship and acceptable noise limit of cabin is specified as 45 dB(A). This paper describes the procedure of noise analysis, the countermeasures of noise control, and the measurement results of the quay trial. In order to minimize the noise levels, careful attention have to be paid by the special committee of experts from the initial design stage to the delivery. Proper countermeasures, considering the characteristics of sources and receiver spaces, were applied from the noise prediction and various experiment results. Finally, this ship was successfully delivered with excellent noise properties. The technology to minimize the noise levels for FPSO has been established throughout the construction of this ship.

  • PDF

Factor Analysis for Implementation of Traditional Retail Market's Customer Relationship Management System (재래시장의 CRM시스템 구축을 위한 주요요인 분석)

  • Kim, Lark-Sang
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.10 no.9
    • /
    • pp.2435-2439
    • /
    • 2009
  • In this research we propose the need of implementing CRM systems to reactivate traditional retail markets, and analyze the primary factors for successful implementation of CRM systems. We derived 4 primary factors such as business management, customer management, service management, and facility management among 22 measurement factors. The characteristics of each primary factor are ; product planning and certification management activities are needed for business management factor. Privileged treatment policies for primary customers are regarded as needed. And the needs for total service in service management factor including from order to delivery and return are raised. Finally, improvements of convenient facilities for using traditional retail markets are needed.

Interpregnancy Interval and Adverse Birth Outcome in Term Premature Rupture of Membrane, 2017

  • Workineh, Yinager;Ayalew, Emiru;Debalkie, Megbaru
    • The Korean Journal of Food & Health Convergence
    • /
    • v.5 no.2
    • /
    • pp.1-11
    • /
    • 2019
  • The objective of this study is to assess the effect of interpregnancy interval on fetal outcome among women with term premature rupture of membrane in public hospitals, Ethiopia, 2017. Facility based follow up study was conducted in Southern Ethiopia public hospitals from February 30, 2017 to August 20, 2017. Among 150 observed mothers with interpregnancy interval of less two years, 46.67 % (95% CI: (7.170, 29.93) of them experienced adverse birth outcome, but among 173 women with interpregnancy interval of two and above years, 5.78% (95% CI: (7.170, 29.93) of them experienced adverse birth outcome. The odds of adverse birth outcome were more among women with interpregnancy interval of less than two years (AOR=17.899, 95%CI: [6.425, 49.859]. The effect of interbirth interval of less than two years on adverse birth outcome of newborn was increased by length labor of >=24 hours, induction of labour and cesarean section delivery. Interpregnancy interval of less than two years, in collaboration with other risk factors, is the main predictor of adverse birth outcome. Therefore especial attention should be given to mothers with birth spacing by using family planning methods to reduce adverse birth outcome.

A Case Study on Using Robot at the Library: Focusing on the case of National Library of Korea (도서관에서 로봇 활용에 대한 사례 연구: 국립중앙도서관을 중심으로)

  • Kim, Kyung Cheol
    • Journal of the Korean Society for information Management
    • /
    • v.37 no.4
    • /
    • pp.61-80
    • /
    • 2020
  • This study attempted to propose various application and function improvement plans by analyzing robots operated in the libraries. Thus, the types and functions of robots operated by 16 domestic and foreign libraries were examined. Most of them were used for Librarian Assistance (Book Inventory, Book Delivery, Etc.) and User Service (Facility Guide, Search Aids, Etc.). Besides, the introduction of robots in the National Library of Korea (NLK) and their functional limitations were analyzed. As a result, this study presented the need to develop additional functions for the robot, develop quarantine and security robots, the need for a national-level policy for robot diffusion, and build a robot ecosystem.

Risk Perceptions of Noncommunicable Diseases among Cambodian Adults: A Cross-Sectional Study

  • Bae, Sung-Heui;Hwang, Oknam;Jeong, Jieun;Yang, Youngran
    • Research in Community and Public Health Nursing
    • /
    • v.33 no.2
    • /
    • pp.259-268
    • /
    • 2022
  • Purpose: In Cambodia, noncommunicable diseases (NCDs) account for 64% of all deaths. A lack of risk perception of NCDs leads to poor measures of their prevention and management. This study aimed to investigate Cambodians' risk perceptions of NCDs based on the health belief model. Methods: A cross-sectional design was used, and using convenience sampling, participants included 200 Cambodians aged 40 years or older. A face-to-face administered structured questionnaire was used to assess demographic characteristics, health behaviors, and risk perceptions of NCDs. Results: Of the constructs of NCD risk perception, perceived severity (88.2%) and benefits (86.3%) were high, but relative to these, perceived cues to action (64.1%), barriers (63.5%), and self-efficacy (58.1%) were low. Conclusion: It is important to improve perceived self-efficacy in government health promotion, outreach, and improvement programs and to reduce perceived barriers through medical tests either by facility-based delivery or via outreach health services in Cambodia.

CASE STUDY OF THE NATIONAL STADIUM: RISKS AND OPPORTUNITIES IN CHINA'S PPP IMPLEMENTATIONS IN MAJOR SPORTS FACILITIES

  • Xinyi Song;Wei Liang;Carlos A. Arboleda;Shouqing Wang;Feniosky Pena-Mora
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.474-479
    • /
    • 2011
  • With Beijing's success in bidding for the 2008 Olympic Games, the increasing demand for infrastructure development and reduced public sector funding capacity has created a significant funding gap which calls for alternative project delivery methods such as Public-Private Partnership (PPP). Although the exploration of infrastructure projects using PPP model have been practiced since the late 80s, the $560 million National Stadium which served as the main venue for the Olympic Games is the first stadium project in China to be delivered under PPP operation. The project is generally considered successful despite the concession transfer in 2009 with concern of better serving the public interest. Compared to other infrastructure projects such as transportation, waste management and water management, the development of major sports facilities for mega-sports events with PPP has its own unique features and is subject to different major risks. This research identifies and analyzes critical risks in the implementation of PPP in major sports facility development through case study of the National Stadium project. A questionnaire survey and several interviews are conducted to solicit expert opinions from experienced practitioners. The purpose is to provide additional insights in risk management strategies and opportunities in China's PPP implementations in major sports facilities for policy makers and private sectors involved with investment decisions in future similar infrastructure development.

  • PDF