• Title/Summary/Keyword: delay factors

Search Result 687, Processing Time 0.026 seconds

Design Method of Test Road Profile for Vehicle Accelerated Durability Test (차량의 가속내구시험을 위한 TEST ROAD PROFILE 설계방법)

  • Min, B.H.;Jung, W.W.
    • Transactions of the Korean Society of Automotive Engineers
    • /
    • v.2 no.1
    • /
    • pp.128-141
    • /
    • 1994
  • This roport explain the basic theory of desinging the accelerating durability test road and the role of each factors contributing to test road surface profile. Also this road is designed by considering the charactors of vehicle suspension system and condition of driving. In test road, the factors affecting to the vehicle Structural durability are correlation among surface shape of road profile, frequency of vehicle suspension system, distribution of axletwist angle and vibration profile height Road PSD magnitude and frequency delay is used to control these factors relation.

  • PDF

Autonomic Period Determination for Variable Rate Limiter of Virus Throttling (바이러스 감속기의 가변 비율 제한기를 위한 자율적 주기 결정)

  • Shim, Jae-Hong;Sohn, Jang-Wan
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.32 no.1C
    • /
    • pp.67-77
    • /
    • 2007
  • Virus throttling technique, one of many early worm detection techniques, detects Internet worm propagation by limiting connect requests within a certain ratio. The typical virus throttling controls the period of rate limiter autonomically by utilizing weighted average delay queue length to reduce connection delay time without hanving a large effect on worm detection time. In the existing virus throttling research, a minimum period of variable rate limiter is fired and a turning point which is a point that the period of rate limiter has been being decreased and starts to be increased is also fixed. However, these two performance factors have different effects on worm detection time and connection delay. In this paper, we analyze the effect of minimum period and turning point of variable rate limiter, and then propose an algorithm which determines values of performance factors by referencing current traffic pattern. Through deep experiments, it is verified that the proposed technique is more efficient in respect of reducing worm detection time and connection delay than the existing virus throttling which fixed the performance factors.

A Study on the improvement of reverberation characteristics using tapped and nested-allpass delay line (Tapped and nested-allpass delay line을 이용한 잔향특성 개선에 관한 연구)

  • Yoon, Jae-Yeun;Park, Jun-Sun;Jin, Yong-Ok
    • Journal of Broadcast Engineering
    • /
    • v.12 no.1 s.34
    • /
    • pp.28-40
    • /
    • 2007
  • In this paper, we proposes an idea for improved sound characteristic which decreasing a problem in previous reverberation algorism structure. To later reflection sound, proposed new reverberation structure, using a lopped and nested all-pass delay line, and it is designed to improve an natural concert hall sound. In addition, In order to have best imaginary sound effect, we extracted the factors by controlling each delay line's delay time, and we realized a proposed new algorithm by using general-purpose DSP. Through several experimental cases, we observed better effect on improvement of linear flatten and reverberation density and decreasing about colorlessness and non-linear sound at previous proposed model about impulse input.

Analysis of Delay Distribution and Rate Control over Burst-Error Wireless Channels

  • Lee, Joon-Goo;Lee, Hyung-Keuk;Lee, Sang-Hoon
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.34 no.5A
    • /
    • pp.355-362
    • /
    • 2009
  • In real-time communication services, delay constraints are among the most important QoS (Quality of Service) factors. In particular, it is difficult to guarantee the delay requirement over wireless channels, since they exhibit dynamic time-varying behavior and even severe burst-errors during periods of deep fading. Channel throughput may be increased, but at the cost of the additional delays when ARQ (Automatic Repeat Request) schemes are used. For real-time communication services, it is very essential to predict data deliverability. This paper derives the delay distribution and the successful delivery probability within a given delay budget using a priori channel model and a posteriori information from the perspective of queueing theory. The Gilbert-Elliot burst-noise channel is employed as an a Priori channel model, where a two-state Markov-modulated Bernoulli process $(MMBP_2)$ is used. for a posteriori information, the channel parameters, the queue-length and the initial channel state are assumed to be given. The numerical derivation is verified and analyzed via Monte Carlo simulations. This numerical derivation is then applied to a rate control scheme for real-time video transmission, where an optimal encoding rate is determined based on the future channel capacity and the distortion of the reconstructed pictures.

Development of a variable resistance-capacitance model with time delay for urea-SCR system

  • Feng, Tan;Lu, Lin
    • Environmental Engineering Research
    • /
    • v.20 no.2
    • /
    • pp.155-161
    • /
    • 2015
  • Experimental research shows that the nitric oxides ($NO_X$) concentration track at the outlet of selective catalytic reduction (SCR) catalyst with a transient variation of Adblue dosage has a time delay and it features a characteristic of resistance-capacitance (RC). The phenomenon brings obstacles to get the simultaneously $NO_X$ expected to be reduced and equi-molar ammonia available to SCR reaction, which finally inhibits $NO_X$ conversion efficiency. Generally, engine loads change frequently, which triggers a rapid changing of Adblue dosage, and it aggravates the air quality that are caused by $NO_X$ emission and ammonia slip. In order to increase the conversion efficiency of $NO_X$ and avoid secondary pollution, the paper gives a comprehensive analysis of the SCR system and tells readers the key factors that affect time delay and RC characteristics. Accordingly, a map of time delay is established and a solution method for time constant and proportional constant is carried out. Finally, the paper accurately describes the input-output state relation of SCR system by using "variable RC model with time delay". The model can be used for a real-time correction of Adblue dosage, which can increase the conversion efficiency of $NO_X$ in SCR system and avoid secondary pollution forming. Obviously, the results of the work discover an avenue for the SCR control strategy.

A study of the enhanced ATM cell transmission in satellite communication system using variable-size block interleaving (위성망에서 가변블록 인터리빙 기법을 이용한 ATM 셀 전송 성능향상에 관한 연구)

  • 김은경;김낙명
    • Journal of the Korean Institute of Telematics and Electronics S
    • /
    • v.35S no.5
    • /
    • pp.1-10
    • /
    • 1998
  • Satellite communication is getting more important in the coming 21st century because of its wide areas sevice capability, ease of access, and fast channel establishment. As such, satellite communication networks will be the basis of the global communication system in cooperation with the ground ATM networks. In this paper, we consider an efficient transmission methodology of ATM cells over the satellite communication channel. We first analyze possible bottlenecks and performance deterioration factors in the case, and then propose an enhanced cell trasmission mechanism. In order to use satellite channel for ATM cell transmission, the application of complicated channel coding is inevitable. However, the forwared error control such as convolutional encoding brings forth burst errors, which calls for the application of some kind of interleaving mechanism to randomize the burst errors at the receiver. Another aspect which should b econsidered in satellite communication system is the inherent transmission delay, which can be very considered in satellite communication system is te inherent transmission delay, which can be very critical to the delay-sensitive ATM traffic. Therefore, we propose that the processing delay at the block interleaving stage should be controlled propose a variable-size block interleaving mechanism which utilizes the predicted transmission delay for each traffic in the queues of the transmitter. According to the computer simulation, the proposed mechanism could improve the overall performance by drastically reducing the ATM cell drop rate owing to the excessive transmission delay.

  • PDF

Preliminary Report of Validity for the Infant Comprehensive Evaluation for Neurodevelopmental Delay, a Newly Developed Inventory for Children Aged 12 to 71 Months

  • Hong, Minha;Lee, Kyung-Sook;Park, Jin-Ah;Kang, Ji-Yeon;Shin, Yong Woo;Cho, Young Il;Moon, Duk-Soo;Cho, Seongwoo;Hwangbo, Ram;Lee, Seung Yup;Bahn, Geon Ho
    • Journal of the Korean Academy of Child and Adolescent Psychiatry
    • /
    • v.33 no.1
    • /
    • pp.16-23
    • /
    • 2022
  • Objectives: Early detection of developmental issues in infants and necessary intervention are important. To identify the comorbid conditions, a comprehensive evaluation is required. The study's objectives were to 1) generate scale items by identifying and eliciting concepts relevant to young children (12-71 months) with developmental delays, 2) develop a comprehensive screening tool for developmental delay and comorbid conditions, and 3) assess the tool's validity and cut-off. Methods: Multidisciplinary experts devised the "Infant Comprehensive Evaluation for Neurodevelopmental Delay (ICEND)," an assessment method that comes in two versions depending on the age of the child: 12-36 months and 37-71 months, through monthly seminars and focused group interviews. The ICEND is composed of three parts: risk factors, resilience factors, and clinical scales. In parts 1 and 2, there were 41 caretakers responded to the questionnaires. Part 3 involved clinicians evaluating ten subscales using 98 and 114 questionnaires for younger and older versions, respectively. The Child Behavior Checklist, Strengths and Difficulties Questionnaire, Infant-Toddler Social Emotional Assessment, and Korean Developmental Screening Test for Infants and Children were employed to analyze concurrent validity with the ICEND. The analyses were performed on both typical and high-risk infants to identify concurrent validity, reliability, and cut-off scores. Results: A total of 296 people participated in the study, with 57 of them being high-risk (19.2%). The Cronbach's alpha was positive (0.533-0.928). In the majority of domains, the ICEND demonstrated a fair discriminatory ability, with a sensitivity of 0.5-0.7 and specificity 0.7-0.9. Conclusion: The ICEND is reliable and valid, indicating its potential as an auxiliary tool for assessing neurodevelopmental delay and comorbid conditions in children aged 12-36 months and 37-71 months.

THE ROOT CAUSE ANALYSIS PROCESS FOR SCHEDULE DELAY IN CONSTRUCTION (건설공사의 작업지연 원인분석 프로세스)

  • Ji, Kun-Chang;Kim, Chang-Duk;Yu, Jung-Ho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.5
    • /
    • pp.138-148
    • /
    • 2006
  • In constructing projects, there exist various kinds of work interferences, which cause a delay of the outset and completion of planned schedule because of some attributions, such as variability, uncertainty and complexity, and so schedule delay has been treated as a natural phenomenon. To reduce or prevent the schedule delay, a constant confirmation of schedule delay and a preparation of counter plans for finding out the cause structure of schedule delay should have been done. However, all this time the research has been mostly done on the calculation method or claim cases of schedule delay, and the range of analysis method of the cause structure of schedule delay has been multifarious from industrial views to views of specific work. Moreover, the classifying system and analysis method did not consider the trait, which cause the schedule delay, in constructing projects. For this reason, it is difficult to compare the cause of delay factors of the projects and to understand the effect of schedule delay by each factor. This paper restricts the range of the cause analysis of schedule delay to the field of site management in the projects and divides the cause structure of schedule delay into the cause objects and cause attributes of schedule delay according to the input elements. The system of classifying causes of schedule delay is examined by interviews with experts and questionnaire. Additionally, this paper analyzes the attributes of cause attributes and cause subjects and presents the analysis method and procedure of schedule delay with the application of VSM.

Hospital Arrival Rate within Golden Time and Factors Influencing Prehospital Delays among Patients with Acute Myocardial Infarction (급성심근경색 환자의 증상 발현 후 골든타임내 응급의료센터 도착율 및 지연에 관련된 요인)

  • Ahn, Hye Mi;Kim, Hyeongsu;Lee, Kun Sei;Lee, Jung Hyun;Jeong, Hyo Seon;Chang, Soung Hoon;Lee, Kyeong Ryong;Kim, Sung Hea;Shin, Eun Young
    • Journal of Korean Academy of Nursing
    • /
    • v.46 no.6
    • /
    • pp.804-812
    • /
    • 2016
  • Purpose: This research was done to identify the hospital arrival rate and factors related to prehospital delay in arriving at an emergency medical center within the golden time after symptom onset in patients with acute myocardial infarction (AMI). Methods: Data used in the research was from the National Emergency Department Information System of the National Emergency Medical Center which reported that in 2014, 9,611 patients went to emergency medical centers for acute myocardial infarction. Prehospital time is the time from onset to arrival at an emergency medical center and is analyzed by subdividing arrival and delay based on golden time of 2 hour. Results: After onset of acute myocardial infarction, arrival rate to emergency medical centers within the golden time was 44.0%(4,233), and factors related to prehospital delay were gender, age, region of residence, symptoms, path to hospital visit, and method of transportation. Conclusion: Results of this study show that in 2014 more than half of AMI patients arrive at emergency medical centers after the golden time for proper treatment of AMI. In order to reduce prehospital delay, new policy that reflects factors influencing prehospital delay should be developed. Especially, public campaigns and education to provide information on AMI initial symptoms and to enhance utilizing EMS to get to the emergency medical center directly should be implemented for patients and/or caregivers.

Predicting Factors of Developmental Delay in Infant and Early Children (일 지역 보건소 내원 영유아의 발달지연의심 예측요인)

  • Ju, Hyeon-Ok;Park, Yu-Kyung;Kim, Dong-Won
    • Child Health Nursing Research
    • /
    • v.19 no.1
    • /
    • pp.12-20
    • /
    • 2013
  • Purpose: The purpose of this study was to investigate factors associated with suspicious developmental delay in infants and early childhood. Methods: Participants were 133 infants, aged from birth to 6 years old and their mothers, who were being seen at 16 Public health centers in B city. Korean Denver II was used to test infant development. ${\chi}^2$-test, Fisher's exact test and multiple logistic regression were used with SPSS 19.0 to analyze data. Results: Of participant infants, 7.5% were below the 3rd percentile for the weight percentile, 8.4% is a weight curve that crosses more than 2 percentile lines on the growth charts after previous achievement, and 9.8% had suspicious developmental delay according to Korean Denver II. Further the predictive factors related to suspicious development delay in the children were decrease of weight percentile (Odds Ratio [OR]=6.69, Confidence Interval [CI])=1.22-36.45), low economic state (OR=6.26, CI=1.50-26.00), and development delay perceived by their mothers (OR=4.99, CI=1.24-20.06). Conclusion: It is necessary to build a government level system to follow management of development of infants and children from the time of birth. Especially, it is necessary to develop a program for children in low income families.