• Title/Summary/Keyword: decommissioning and decontamination

Search Result 85, Processing Time 0.033 seconds

A study of the NF3 plasma etching reaction with cobalt oxide films grown on an inorganic compounds

  • Jae-Yong Lee;Kyung-Min Kim;Min-Seung Ko;Yong-Soo Kim
    • Nuclear Engineering and Technology
    • /
    • v.54 no.12
    • /
    • pp.4449-4459
    • /
    • 2022
  • In this study, an NF3 plasma etching reaction with a cobalt oxide (Co3O4) films grown on the surface of inorganic compounds using granite was investigated. Experimental results showed that the etching rate can be up to 1.604 mm/min at 380 ℃ under 150 W of RF power. EDS and XPS analysis showed that main reaction product is CoF2, which is generated by fluorination in NF3 plasma. The etching rate of cobalt oxide films grown on inorganic compounds in this study was affected by surface roughness and etch selectivity. This study demonstrates that the plasma surface decontamination can effectively and efficiently remove contaminated nuclides such as cobalt attached to aggregate in concrete generated when decommissioning of nuclear power plants.

Options Manageing for Radioactive Metallic Waste From the Decommissioning of Kori Unit 1 (고리1호기 해체시 발생할 방사성금속폐기물 관리 옵션 연구)

  • Kessel, David S.;Kim, Chang-Lak
    • Journal of Nuclear Fuel Cycle and Waste Technology(JNFCWT)
    • /
    • v.15 no.2
    • /
    • pp.181-189
    • /
    • 2017
  • The purpose of this paper is to evaluate several leading options for the management of radioactive metallic waste against a set of general criteria including safety, cost effectiveness, radiological dose to workers and volume reduction. Several options for managing metallic waste generated from decommissioning are evaluated in this paper. These options include free release, controlled reuse, and direct disposal of radioactive metallic waste. Each of these options may involve treatment of the metal waste for volume reduction by physical cutting or melting. A multi-criteria decision analysis was performed using the Analytic Hierarchy Process (AHP) to rank the options. Melting radioactive metallic waste to produce metal ingots with controlled reuse or free release is found to be the most effective option.

A study on pressurizer cutting scenario for radiation dose reduction for workers using VISIPLAN

  • Lee, Hak Yun;Kim, Sun Il;Song, Jong Soon
    • Nuclear Engineering and Technology
    • /
    • v.54 no.7
    • /
    • pp.2736-2747
    • /
    • 2022
  • The operations in the design lifecycle of a nuclear power plant targeted to be decommissioned lead to neutron activation. Operations in the decommissioning process include cutting, decontamination, disposal, and processing. Among these, cutting is done close to the target material, and thus workers are exposed to radiation. As there are only a few studies on pressurizers, there arises the need for further research to assess the radiation exposure dose. This study obtained the specifications of the AP1000 pressurizer of Westinghouse and the distribution of radionuclide inventory of a pressurizer in a pressurised water reactor for evaluation based on literature studies. A cutting scenario was created to develop an optimal method so that the cut pieces fill a radioactive solid waste drum with dimensions 0.571 m × 0.834 m. The estimated exposure dose, estimated using the tool VISIPLAN SW, in terms of the decontamination factor (DF) ranged from DF-0 to DF-100, indicating that DF-90 and DF-100 meet the ICRP recommendation on exposure dose 0.0057 mSv/h. At the end of the study, although flame cutting was considered the most efficient method in terms of cutting speed, laser cutting was the most reasonable one in terms of the financial aspects and secondary waste.

Evaluation of decontamination factor of radioactive methyl iodide on activated carbons at high humid conditions

  • Choi, Byung-Seon;Kim, Seon-Byeong;Moon, Jeikwon;Seo, Bum-Kyung
    • Nuclear Engineering and Technology
    • /
    • v.53 no.5
    • /
    • pp.1519-1523
    • /
    • 2021
  • Radioactive iodine (131I) released from nuclear power plants has been a critical environmental concern for workers. The effective trapping of radioactive iodine isotopes from the off-gas stream generated from nuclear facilities is an important issue in radioactive waste treatment systems evaluation. Numerous studies on retaining methyl iodide (CH3I131) by impregnated activated carbons under the high content of moisture have been extensively studied so far. But there have been no good results on how to remove methyl iodide at high humid conditions up to now. A new challenge is to introduce other promising impregnating chemical agents that are able to uptake enough radioactive methyl iodide under high humid conditions. In order to develop a good removal efficiency to control radioiodine gas generated from a high humid process, activated carbons (ACs) impregnated with triethylene diamine (TEDA) and qinuclidine (QUID) were prepared. In addition, the removal efficiencies of the activated carbons (ACs) under humid conditions up to 95% RH were evaluated by applying the standard method specified in ASTM-D3808. Quinuclidine impregnated activated carbon showed a much higher decontamination factor above 1,000, which is enough to meet the regulation index for the iodine filters in nuclear power plants (NPPs).

Evaluation of Residual Radiation and Radioactivity Level of TRIGA Mark-II, III Research Reactor Facilities for Safe Decommissioning (TRIGA Mark-II, III 연구로 시절의 폐로를 위한 시설의 잔류 방사선/능 평가)

  • Lee, B.J.;Chang, S.Y.;Park, S.K.;Jung, W.S.;Jung, K.J.
    • Journal of Radiation Protection and Research
    • /
    • v.24 no.2
    • /
    • pp.109-120
    • /
    • 1999
  • Residual radiation and radioactivity level in TRIGA Mark-II, III research reactors and facilities at the KAERI Seoul site, which are to be decommissioned, have been measured, analyzed and evaluated to know the current status of radiation and radioactivity level and to establish and to provide the technical requirements for the safe decommissioning of the facilities which shall be applied in minimizing the radiation exposure for workers and in preventing the release of the radioactive materials to the environment. Radiation dose rate and surface radioactivity contamination level on the experimental equipments, floors, walls of the facilities, and the surface of the activated materials within the reactor pool structure were measured and evaluated. Radioactivity and radionuclides in the pool and cooling water were also analyzed. In case of the activated reactor pool structures which are very difficult to measure the radiation and radioactivity level, a computer code Fispin was additionally used for estimation of the residual radioactivity and radionuclides. The radiation and radioactivity data obtained in this study were effectively used as basic data for decontamination and dismantling plan for safe decommissioning of TRIGA Mark-II, III facilities.

  • PDF

Flow Characteristics Evaluation in Reactor Coolant System for Full System Decontamination of Kori-1 Nuclear Power Plant (고리1호기 계통제염을 위한 원자로냉각재내 유동 특성 평가)

  • Kim, Hak Soo;Kim, Cho-Rong
    • Journal of Nuclear Fuel Cycle and Waste Technology(JNFCWT)
    • /
    • v.16 no.3
    • /
    • pp.389-396
    • /
    • 2018
  • The Kori-1 Nuclear Power Plant (NPP), WH 2-Loop Pressurized Water Reactor (PWR) operated for approximately 40 years in Korea, was permanently ceased on June 18, 2017. To reduce worker exposure to radiation by reducing the dose rate in the system before starting main decommissioning activities, the permanently ceased Kori-1 NPP will be subjected to full system decontamination. Generally, the range of system decontamination includes Reactor Pressure Vessels (RPV), Pressurizer (PZR), Steam Generators (SG), Chemical & Volume Control System (CVCS), Residual Heat Removal System (RHRS), and Reactor Coolant System (RCS) piping. In order to decontaminate these systems and equipment in an effective manner, it is necessary to evaluate the influence of the flow characteristics in the RCS during the decontamination period. There are various methods of providing circulating flow rate to the system decontamination. In this paper, the flow characteristics in Kori-1 NPP reactor coolant according to RHR pump operation were evaluated. The evaluation results showed that system decontamination using an RHR pump was not effective at decontamination due first to impurities deposited in piping and equipment, and second to the extreme flow unbalance in the RCS caused deposition of impurities.

Trends in Technology Development for the Treatment of Radioactive Concrete Waste (방사성 콘크리트 폐기물의 국내외 처리기술 개발 동향)

  • Lee, Keun-Young;Oh, Maengkyo;Kim, Jimin;Lee, Eil-Hee;Kim, Ik-Soo;Kim, Kwang-Wook;Chung, Dong-Yong;Seo, Bum-Kyoung
    • Journal of Nuclear Fuel Cycle and Waste Technology(JNFCWT)
    • /
    • v.16 no.1
    • /
    • pp.93-105
    • /
    • 2018
  • In Korea, a huge amount of radioactive concrete waste will be generated through decommissioning of nuclear facilities in the near future; therefore, optimum technology for the treatment of concrete waste should be reviewed thoroughly and the future direction of technology development should be discussed. In this paper, many domestic and foreign examples of generation of radioactive concrete waste were pieced together and the characteristics of radioactive concrete waste were examined. Moreover, we reviewed trends in technology development by analyzing the examples of various studies and practical applications of treatment technologies, such as mechanical decontamination, chemical decontamination, volume reduction, recycling and solidification, and also tried to understand the limitations of existing technologies and determine a direction for technical improvement.

Equilibrium calculations for HyBRID decontamination of magnetite: Effect of raw amount of CuSO4 on Cu2O formation

  • Lee, Byung-Chul;Kim, Seon-Byeong;Moon, Jei-Kwon
    • Nuclear Engineering and Technology
    • /
    • v.52 no.11
    • /
    • pp.2543-2551
    • /
    • 2020
  • Calculations of chemical equilibrium for multicomponent aqueous systems of the HyBRID dissolution of magnetite were performed by using the HSC Chemistry. They were done by using a Pitzer-based aqueous solution model with the recipe of raw materials in experiments conducted at KAERI. The change in the amounts of species and ions and the pH values of the solution at equilibrium was observed as functions of temperature and raw amount of CuSO4. Precipitation of Cu2O occurred at a large amount of CuSO4 added to the solution, while no precipitation of Cu(OH)2 was found at any amounts of CuSO4. The E-pH diagrams for Cu were constructed at various Cu concentrations to provide the effect of the Cu concentration on the pH values at boundaries where the coexistence of Cu+ ion and Cu2O solid occurred. To prevent Cu+ ions from being precipitated to Cu2O, the raw amount of CuSO4 should be adjusted so that the pH value of the solution from the equilibrium calculation is less than that from the E-pH diagram. We provided guidelines for the raw amount of CuSO4 and the pH value of the solution, which prevent the formation of Cu2O precipitates in the HyBRID dissolution experiments for magnetite.

WASHING-ELECTROKINETIC DECONTAMINATION FOR CONCRETE CONTAMINATED WITH COBALT AND CESIUM

  • Kim, Gye-Nam;Yang, Byeong-Il;Choi, Wang-Kyu;Lee, Kune-Woo;Hyeon, Jay-Hyeok
    • Nuclear Engineering and Technology
    • /
    • v.41 no.8
    • /
    • pp.1079-1086
    • /
    • 2009
  • A great volume of radioactive concrete is generated during the operation and the decommissioning of nuclear facilities. The washing-electrokinetic technology in this study, which combined an electrokinetic method and a washing method, was developed to decontaminate the concrete generated in nuclear facilities. The results of only an electrokinetic decontamination for the concrete showed that cobalt was removed to below 1% from the concrete due to its high pH. Therefore, the washing-electrokinetic technology was applied to lower the pH of the concrete. Namely, when the concrete was washed with 3 M of hydrochloric acid for 4 hours (0.17 day), the $CaCO_3$ in the concrete was decomposed into $CO_2$ and the pH of the concrete was reduced to 3.7, and the cobalt and cesium in the concrete were removed by up to 85.0% and 76.3% respectively. Next, when the washed concrete was decontaminated by the electrokinetic method with 0.01M of acetic acid in the 1L electrokinetic equipment for 14.83 days, the cobalt and the cesium in the concrete were both removed by up to 99.7% and 99.6% respectively. The removal efficiencies of the cobalt and cesium by 0.01M of acetic acid were increased more than those by 0.05M of acetic acid due to the increase of the concrete zeta potential. The total effluent volume generated from the washing-electrokinetic decontamination was 11.55L (7.2ml/g).

A Radionuclides Suite Selection for Site Characterization and Final Status Survey in the U.S. NPPs (미국의 원전 해체관련 부지특성 및 최종상태 조사를 위한 방사성 오염 핵종 결정 방법에 대한 분석)

  • Zhao, Pengfei;Jeon, Yeo Ryeong;Kim, Yongmin;Lee, Jong Seh;Ahn, Seokyoung
    • Journal of Nuclear Fuel Cycle and Waste Technology(JNFCWT)
    • /
    • v.14 no.3
    • /
    • pp.267-277
    • /
    • 2016
  • For the decommissioning of a nuclear power plant, a site characterization and final status survey require a site-specific suite of radionuclides that could potentially still be present in the site during or after the decontamination processes. The United States Nuclear Regulatory Commission (U.S. NRC) requires a Decommissioning Technical Base Document (DTBD) along with a Site Characterization and Historical Site Assessment (HSA) from the utility for decommissioning to proceed. Both the DTBD and HSA are preliminary components of the Radiological Site Survey investigation process and should be included in the final License Termination Plan (LTP) for site release and reuse consideration from the U.S. NRC and the utility company. This study reviews the United States Nuclear Power Plants (U.S. NPPs) decommissioning cases and is especially focused on the methodologies used for determining a site-specific suite of radionuclides before and during the site characterization and final status surveys. In 2017, Kori-1 will be ready for decommissioning and related preparations are ongoing, this review will help Korea to prepare regulatory guidelines and give technical background for the safe and successful decommissioning of NPPs.