• Title/Summary/Keyword: damages for delay

Search Result 55, Processing Time 0.024 seconds

Petrological Characteristics and Nondestructive Deterioration Assessments for Foundation Stones of the Sebyeonggwan Hall in Tongyeong, Korea (통영 세병관 초석의 암석학적 특성 및 비파괴 손상평가)

  • Han, Doo Roo;Kim, Sung Han;Park, Seok Tae;Lee, Chan Hee
    • Economic and Environmental Geology
    • /
    • v.54 no.2
    • /
    • pp.199-212
    • /
    • 2021
  • The Sebyeonggwan Hall (National Treasure No. 305) is located on the Naval Headquarter of Three Provinces in Tongyeong, and it has partly undergone with several rebuilding, remodeling, repairing and restorations since it's the first establishment in Joseon Dynasty (AD 1605) of ancient Korea. This study focuses on 50 foundation stones that comprise the Sebyeonggwan. These stones are made of six rock types and currently have various shapes of the surface damages. As the foundation stones, the dominant rock type was dacitic lapilli tuffs, and provenance-based interpretation was performed to supply alternative stones for conservation. Most of the provenance rocks for foundation stones showed highly homogeneity with their corresponding stones of petrography, mineralogy and magnetic susceptibility. According to surface deterioration assessments, the most serious damages of the stones were blistering and scaling. The deterioration mechanism was identified through the analysis of inorganic contaminants, and the primary reason is considered salt weathering caused by sea breeze and other combined circumstances. Based on the mechanical durability of the stones, there was no foundation stone that required the replacement of its members attributed to the degradation of the rock properties, but conservation treatment is considered necessary to delay superficial damage. The foundation stones are characterized by a combined outcome of multiple petrological factors that caused physical damage to surfaces and internal defects. Therefore, it's required to diagnosis and monitoring the Sebyeonggwan regularly for long-term preservation.

Retardation Effect on the Breach of the Earth Filled Embankment Using the Stiffener During Overtopping (흙댐 제체의 보강재 설치에 따른 월류붕괴 지연효과)

  • Joo, Yo Han;Yeo, Chang-Geon;Lee, Seung Oh
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.33 no.4
    • /
    • pp.1377-1387
    • /
    • 2013
  • Most embankment of the reservoirs (99.1 %) have been constructed in the earth filled type in Korea because the construction of this type is less expensive and simpler than others such as concrete one. However, it has to be reinforced the slope to prevent the breach due to overtopping or piping under unexpected flood conditions. This study has been analyzed the retardation effect using three types (L, T, $L^*$ shape) of stiffener in order to reinforce embankment when they are collapsed by overtopping flow. Experimental results showed that L-type stiffener is the most effective in delaying the breaching of embankment and reducing the soil erosion when compared with others. The reinforced embankment breaching showed that time delay was occurred about 1.73 to 2.29 times and the peak flowrate was reduced compared to non-stiffener embankments due to energy dissipation by collision and less soil erosion. The embankment breaching mostly leads to major damages because of the lack of repair time. Thus, since these stiffeners can resist the rapid breach, it would be possible to earn the time to emergency repair and lifesaving, as well as reduction of damages of embankment in downward region with decreasing peak flowrate. Results from this study would be used for the basis when establishing the emergency action plan for the reservoirs on the verge of hazard.

Design of a Femtosecond Ti:sapphire Laser for Generation and Temporal Optimization of 0.5-PW Laser Pulses at a 0.1-Hz Repetition Rate

  • Sung, Jae-Hee;Yu, Tae-Jun;Lee, Seong-Ku;Jeong, Tae-Moon;Choi, Il-Woo;Ko, Do-Kyeong;Lee, Jong-Min
    • Journal of the Optical Society of Korea
    • /
    • v.13 no.1
    • /
    • pp.53-59
    • /
    • 2009
  • A chirped-pulse amplification Ti:sapphire laser system has been designed using a 10-Hz 100-TW Ti:sapphire laser to generate 0.1-Hz 0.5-PW laser pulses and optimize their temporal qualities such as temporal contrast and pulse duration. A high-energy booster amplifier to be added is expected to produce an energy above 30 J through the parasitic lasing suppression and the efficient amplification. To improve the temporal contrast of the laser pulses, a high-contrast 1-kHz amplifier system is used as a front-end. A grating stretcher which makes the laser pulse have 1-ns duration is used to prevent optical damages due to high pulse energy during amplification. A grating compressor has been designed with group delay analysis to obtain the recompressed pulse duration close to the transform-limited pulse duration. The final laser pulses are expected to have energy above 20 J and duration below 40 fs.

A Study on the Precursors of Aviation Turbulence via QAR Data Analysis (QAR 데이터 분석을 통한 항공난류 조기 인지 가능성 연구)

  • Kim, In Gyu;Chang, Jo Won
    • Journal of the Korean Society for Aviation and Aeronautics
    • /
    • v.26 no.4
    • /
    • pp.36-42
    • /
    • 2018
  • Although continuous passenger injuries and physical damages are repeated due to the unexpected aviation turbulence encountered during operations, there is still exist the limitation for preventing recurrence of similar events because the lack of real-time information and delay in technological developments regarding various operating conditions and variable weather phenomena. The purpose of this study is to compare and analyze the meteorological data of the aviation turbulence occurred and actual flight data extracted from the Quick Access Recorder(QAR) to provide some precursors that the pilot can identify aviation turbulence early by referring thru the flight instrumentation indications. The case applied for this study was recent event, a scheduled flight from Incheon Airport, Korea to Narita Airport, Japan that suddenly encountered turbulence at an altitude of approximately 14,000 feet during approach. According to the Korea Meteorological Administration(KMA)'s Regional Data Assessment and Prediction System(RDAPS) data, it was observed that the strong amount of vorticity in the rear area of jet stream, which existed near Mount Fuji at that time. The QAR data analysis shows significant changes in the aircraft's parameters such as Pitch and Roll angle, Static Air Temperature(SAT), and wind speed and direction in tens of seconds to minutes before encounter the turbulence. If the accumulate reliability of the data in addition and verification of various parameters with continuous analysis of additional cases, it can be the precursors for the pilot's effective and pre-emptive action and conservative prevention measures against aviation turbulence to reduce subsequent passenger injuries in the aviation operations.

A Study on the Cost Estimation in Case of Termination in the Building Construction Contract (건축공사 계약해지에 따른 비용산정에 관한 연구)

  • Lee, Ho-Il;Choi, In-Sung
    • Journal of the Korea Institute of Building Construction
    • /
    • v.3 no.2
    • /
    • pp.95-102
    • /
    • 2003
  • Financial difficulties and claims frequently stop construction works and cause subsequent contract cancellations. However, as the criteria to assess costs have not been established, many cases of legal disputes over the assessment of cancellation costs are taking place and the concerned parties are suffering the loss of time and money. Therefore, the present research aimed at developing a rational and systematic model of cancellation cost assessment following the cancellation of contracts. The research was carried out in the following methods and scopes. 1 ) The research was focused on the assessment of fair cancellation costs from constructors' side for contracts cancelled by any causes for which the owners have liability. 2) To obtain basic materials about cancellation cost assessment methods, contracts, claims, contract cancellations and construction-related laws at home and abroad were examined. 3) A cost assessment model was developed for systematization and efficient operation of cancellation cost assessment, and the reliability and efficiency of the proposed model was verified through a case study. The conclusions drawn from the research are as follows. The importance of the cancellation cost assessment model was confirmed as, using the cancellation cost assessment model, direct cancellation cost and indirect cancellation cost could be assessed systematically, the number of disputable items could be reduced because reasonable evidences of actual spending were presented, and the loss of constructors could be minimized because systematic and rational cost assessment became possible for many disputable cases of indirect cancellation cost, which the constructors had been unable to prove so far though having spent.

A Consequence Analysis of the Mitigation Impact on Emergency Shut-off Valves for Accidents of Underground Pipelines (사고영향평가를 이용한 지하 매설 배관 사고 시 긴급차단밸브에 의한 피해 범위 감소에 관한 연구)

  • Park, Sang Bae;Lee, Chang Jun
    • Journal of the Korean Institute of Gas
    • /
    • v.23 no.2
    • /
    • pp.28-34
    • /
    • 2019
  • A large number of underground pipelines in the Ulsan National Industrial Complex has been constructed to improve the productivity of chemical products and tackle transportation problems. Now, the total of 1,293km of underground pipelines around 62 companies has been installed and operated. Many of underground pipelines have been installed outside of factories. For a past three years, five gas leakage accidents have occurred and the emergency response took up to 8 hours or more. Due to these delay in accidents, second serious accidents might occur and lead to occur damages to adjacent residents. In this study, it is assumed that emergency valve systems are installed under a ground and the efficacy of these is verified. Consequence analysis program was employed to evaluate the mitigation impact of emergency valve systems. The results show that these valve systems are economical and their performances for a mitigation are excellent. The results indicate that the installation of emergency valve systems for underground pipelines should be urgently legislated and performed.

A Study on the International Carriage of Cargo by Air under the Montreal Convention-With respect to the Air Waybill and the Liability of Air Carrier (몬트리올 협약상 국제항공화물운송에 관한 연구 - 항공화물운송장과 항공운송인의 책임을 중심으로 -)

  • Lee, Kang-Bin
    • THE INTERNATIONAL COMMERCE & LAW REVIEW
    • /
    • v.49
    • /
    • pp.283-324
    • /
    • 2011
  • The purpose of this paper is to research the air waybill and the carrier's liability in respect of the carriage of cargo by air under the Montreal Convention of 1999. The Warsaw Convention for the unification of certain rules for international carriage by air was adopted in 1929 and modified successively in 1955, 1961, 1971, 1975 and 1999. The Montreal Convention of 1999 modernized and consolidated the Warsaw Convention and related instruments. Under the Montreal Convention, in respect of the carriage of cargo, the air waybill shall be made out by the consignor. If, at the request of the consignor, the carrier makes it out, the carrier shall be deemed to have done so on behalf of the consignor. The air waybill shall be made out in three orignal parts. Under the Montreal Convention, the consignor shall indemnify the carrier against all damages suffered by the carrier or any other person to whom the carrier is liable, by reason of the irregularity, incorrectness or incompleteness of the particulars and statement furnished by the consignor or on its behalf. The air waybill is not a document of title or negotiable instrument. Under the Montreal Convention, the air waybill is prima facie evidence of the conclusion of the contract, of the acceptance of the cargo and of the conditions of carriage. If the carrier carries out the instructions of the consignor for the disposition of the cargo without requiring the production of the part of the air waybill, the carrier will be liable, for any damage which may be accused thereby to any person who is lawfully in possession of the part of the air waybill. Under the Montreal Convention, the carrier is liable by application of principle of strict liability for the damage sustained during the carriage of cargo by air. The carrier is liable for the destruction or loss of, or damage to cargo and delay during the carriage by air. The period of the carriage by air does not extend to any carriage by land, by sea or by inland waterway performed outside an airport. Under the Montreal Convention, the carrier's liability is limited to a sum of 17 Special Drawing Rights per kilogramme. Any provision tending to relieve the carrier of liability or to fix a lower limit than that which is laid down in this Convention shall be and void. Under the Montreal Convention, if the carrier proves that the damage was caused by the negligence or other wrongful act or omission of the person claiming compensation, or the person from whom he derives his rights, the carrier shall be wholly or partly exonerated from ist liability to the claimant to the extent that such negligence or wrongful act or omission caused the damage. Under the Montreal Convention, any action for damages, however founded, whether under this Convention or in contract or in tort or otherwise, can only be brought subject to the conditions and such limits of liability as are set out in this Convention. Under the Montreal Convention, in the case of damage the person entitled to delivery must complain to the carrier forthwith after the discovery of the damage, and at the latest, within fourteen days from the date of receipt of cargo. In the case of delay, the complaint must be made at the latest within twenty-one days from the date on which the cargo has been placed at his disposal. if no complaint is made within the times aforesaid, no action shall lie against the carrier, save in the case of fraud on its part. Under the Montreal Convention, the right to damage shall be extinguished if an action is not brought within a period of two years, reckoned from the date of arrival at the destination, or from the date on which the aircraft ought to have arrived, or from the date on which the carriage stopped. In conclusion, the Montreal Convention has main outstanding issues with respect to the carrier's liability in respect of the carriage of cargo by air as follows : The amounts of limits of the carrier's liability, the duration of the carrier's liability, and the aviation liability insurance. Therefore, the conditions and limits of the carrier's liability under the Montreal Convention should be readjusted and regulated in detail.

  • PDF

The introduction of Traffic Inducement Security System in Korea - Centering on Curriculums - (한국의 교통유도경비 도입방안 -교과과정을 중심으로-)

  • Lee, Sang-Won;Lee,, Seung-Chal
    • Korean Security Journal
    • /
    • no.25
    • /
    • pp.147-164
    • /
    • 2010
  • A variety of work zone including road single-sharing construction add surrounding disorder and increase inconvenience of vehicles and pedestrians and furthermore danger of traffic accidents, which sometimes result in human life damages. Traffic delay due to vehicles and users generating in the course of using large-scale multiplex facilities bring about a great economic loss. Now, a lot of regulations and laws related to traffic safety system on construction sites etc. are established, but can not display efficacy desirably. It brings about continuous economic loss due to human life accidents and delay. For the purpose of solving the problems, it is necessary to import systems such as traffic inducement Security (Japan) and traffic controller (CANADA, USA) This article suggest how improve civil safety and reduce Social cost. therefore This thesis aims at analyzing advanced cases of foreign countries, looking into Korean status, and presenting importing ways of traffic inducement Security appropriate to Korea. It is reasonable to grant grade1, grade2, and technical experts to traffic inducement Security who pass regulated educations and examinations. In addition, by reversing regulations and laws, it is necessary only those who have the licenses of traffic induction guarder etc. can establish construction sites and disordered places on roads. Theory educations for education time must include basic educations and expert educations. Basic educations must include understanding regulations and laws and understanding affairs. Expert educations must include traffic control, safety educations, understanding of traffic accidents, operation of traffic control facilities, and traffic accident settlements. Traffic affairs educations must include traffic induction affairs in sites (hand signals, safety material establishment, traffic accident settlements, and urgent treatments).

  • PDF

Effect of Tetramethylpyrazine on Neuronal Apoptosis in Spinal Cord Compression Injury of Rats (Tetramethylpyrazine이 흰쥐 척수압박손상의 신경세포 자연사에 미치는 영향)

  • Jo, Jong-Jin;Kim, Seung-Hwan;Lee, Joon-Seok;Shin, Jung-Won;Kim, Seong-Joon;Sohn, Nak-Won
    • Journal of Korean Medicine Rehabilitation
    • /
    • v.23 no.1
    • /
    • pp.1-13
    • /
    • 2013
  • Objectives : The pathophysiology of acute spinal cord injury(SCI) may be divided into primary and secondary mechanisms of injury. The secondary mechanism involves free radical formation, excitotoxicity, inflammation and apoptotic cell death, and sets in minutes after injury and lasts for weeks or months. During this phase the spinal tissue damages are aggravated. Therefore, secondary mechanisms of injury serve as a target for the development of neuroprotective drug against SCI. The present study investigated the effect of tetramethylpyrazine(TMP), an active ingredient purified from the rhizome of Ligusticum wallichii(川芎, chuanxiong), on neuronal apoptosis in spinal cord compression injury in rats. Methods : SCI was subjected to rats by a static compression method(35 g weight, 5 mins) and TMP was treated 3 times(30 mg/kg, i.p.) during 48 hours after the SCI. Results : TMP ameliorated the tissue damage in peri-lesion of SCI and reduced TUNEL-labeled cells both in gray matter and in white matter significantly. TMP also attenuated Bax-expressed motor neurons in the ventral horn and preserved Bcl-2-expressed motor neurons. Conclusions : These results indicate that TMP plays a protective role in apoptotic cell death of neurons and oligodendrocytes in spinal cord injury. Moreover, it is suggested that TMP and TMP-containing chuanxiong may potentially delay or protect the secondary spinal injury.

Study on introduction of 'Pre-Agreement system for Additional Incidental Cost' related to construction time extension (공사기간 연장에 따른 추가간접비 사전합의 제도 도입 방안 연구)

  • Jeong, Ki-Chang;Lee, Jae-Seob;Park, Yang-Ho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.6
    • /
    • pp.33-44
    • /
    • 2012
  • This study is as to payment improvement method of additional incidental cost to be occurred upon extension of public construction time. According to the result of analysis about the cause of non-payment of additional incidental cost of construction time extension through site examples, it was found that difficulties exist in disputes & proofing over the scope of actual cost recognition, and in this regard the result of experts opinion indicated that a construction extension pre-agreement system can be executed which agrees the scope of recognition of additional incidental cost of construction time extension once the statistical standard is clear and accurate. Accordingly, in this study, by totalling multiple sites data, calculations were implemented in terms of type of construction projects, amount of constructions, period of constructions. According to the result of calculation, the element of type of construction project and construction period appears to have none direct effect to the occurrence of additional cost of construction time extension, but direct relationship was indicated related to the contract amount element. In view of above, in this study a standard additional incidental cost of construction time extension was proposed, and presented a system improvement plan to implement the construction extension pre-agreement system.