• Title/Summary/Keyword: daily -report system

Search Result 91, Processing Time 0.032 seconds

Information Constitution of Daily Job-Site Report for Specialty Contractors (전문건설업체 작업일보의 정보구성에 관한 연구)

  • Lee, Kang-Min;Shin, Won-Sang;Lee, Dong-Eun;Kim, Dae-Young;Son, Chang-Baek
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.11a
    • /
    • pp.279-280
    • /
    • 2012
  • The Construction Standard Production Unit(CSPU) has been used for the standard cost estimate in public and private construction projects. However, It is questionable if the reliability and/or authenticity of the system is acceptable due to the lack of consistent enactment and/or revision procedures. This study identifies informational conditions and issues relative to using daily work report as a data collection method for enacting and/or revising CSPU system, and establishes the measures for improving the daily work report. This study aims on the information constitution of daily job-site report, daily manpower report, wages register for specialty contractors. According to the research results, most of necessary data were included in a daily job-site report. In conclusion, it is investigated that data of daily manpower report and wage register need to be included in a daily job-site report for understanding the current state of worker in the future.

  • PDF

Daily Reporting System using Digital Pen at Construction Site (디지털펜 기반의 건설현장 작업일보시스템 개발)

  • Shin, Yoonseok;Kim, Daewon;Kim, Tae-Yong;Kim, Gwang-Hee
    • Journal of the Korea Institute of Building Construction
    • /
    • v.16 no.2
    • /
    • pp.177-183
    • /
    • 2016
  • The daily report includes the most detailed information and various daily planning and performance data recorded at a site, and includes work types, the number of workers, and the equipment and materials used. However, in the daily reporting process, some information can be omitted or distorted or even made redundant due to there being several steps of manual input. For this reason, the daily report is utilized for a simple report rather than for an appropriate purpose. Thus, to resolve the issues of the existing daily report system mentioned above, a daily report system using a digital pen was developed and then applied to an actual construction site to verify its applicability. As a result, it was found that 96.610% recognition accuracy of handwritten letters could be achieved. In addition, it was no longer necessary to enter the same information multiple times and no additional training or education for using a mobile device was needed. The digital pen-based daily report program developed in this study is expected to contribute to an improvement of information management efficiency and site document management work by addressing the problems of the existing report system.

Reengineering Daily Reporting Process by Using Task Generator and Mobile Technology (작업생성기와 모바일 기술을 이용한 작업일보 프로세스 리엔지니어링)

  • Kang Woo-Young;Chin Sangyoon;Kim Yea-Sang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.3 s.25
    • /
    • pp.100-110
    • /
    • 2005
  • As construction projects are getting more complex and larger in size, the amount of information is increased exponentially, which requires information management systems to accumulate as-built information throughout the project life-cycle. Particularly, a daily report system is very important, since it helps them keep track of various as-built information at the most detailed level. However, there have been many problems with daily reporting since its process is time-consuming and contains a lot of redundancies and ambiguities. Therefore, the objective of this research is to improve a process of collecting as-built information and managing daily report. To do so, this research developed a to-be process model and a daily report system. The daily report system developed in this research consists of interactive task generator and daily report management modules. The system has been successfully implemented in a real world construction project. The system development processes including process analysis, information models and system features are described along with discussions on the results and improvements.

Web-based Daily Report for Data Repository of Standard Cost Data for Modernized Korean Housing (Hanok)

  • Kim, SuJi;Jung, Youngsoo
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.595-596
    • /
    • 2015
  • Growing demand for traditional Korean housing, modernized Korean traditional housing (Hanok) was developed as a way of providing Hanok for the public. However, the standard cost data for Hanok has limitations, as it was developed based on single mock-up project actually constructed and verified by another mock-up Hanok. In order to meet these research objectives, daily report composition which is easy-to-use for on-site workers and managers and also easy-to-accumulate standard cost data was developed first. Secondly, access to the system was made easy through a web server. Finally, an automated calculation formula was inserted to allow the last inputted data to be automatically included for adjustment of standard costs. This system was designed from an industry perspective so that any unspecified and nonprofessional users can easily use. For the users, it has an advantage that on-site workers are provided with a daily report system through web server and also they are able to complete such reports through simple input and output without any additional forms.

  • PDF

Web-based Coordination System for Daily Work Report between Contractor and Subcontractor (원수급업체와 하수급업체간 웹기반 작업일보 연동시스템 개발)

  • Seo Hae-Jun;Koo Kyo-Jin;Um Ik-Jun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.370-375
    • /
    • 2004
  • The management of daily work report is very important due to the variety of work trade and activities. Although various project management systems have been developed to effectively deal with various task in site, they are not in practical use due to the non-coorperative attitude of sub-contractors. This is the reason the system are not developed in the focus of sub-contractors, but main contractors and the detail information about daily work report is omitted or lost in the collection process by contractors. Therefore the purpose of this study was to propose the Web-based coordination system for daily work report between contractor and sub-contractors

  • PDF

Scanned Drawing-based Production Management System for Deckhouse Floor Outfitting (스캔도면 기반 선실바닥의장 생산관리 시스템 개발)

  • Kang, In-Chang;Song, Chang-Yong
    • Journal of Ocean Engineering and Technology
    • /
    • v.31 no.2
    • /
    • pp.141-154
    • /
    • 2017
  • A production management system is developed to enhance both the information and productivity of ship and offshore plant deckhouse floor outfitting. The functions of the production management system for the deckhouse floor outfitting were reviewed based on a literature survey of several production management systems with respect to the ship building and architecture fields. This study investigated numerous daily production reports and their application to actual work places to utilize the system development. The developed scanned drawing-based production management (SDPM) system minimizes any loss and/or distortion of work information between the workshop and management office when applying a scanned production drawing to the daily report. The SDPM system increases the data objectivity, as well as intuitiveness of the information generation by adopting an efficient user interface, which makes it possible to perform image annotations on the scanned drawing for the daily production report while simultaneously interacting with the production management database. Applying the system operation to actual deckhouse floor covering work verified that it was feasible to use the SDPM system for production management in the ship outfitting work process.

The Analysis of Current Daily-Report System and The Proposal of Improvement Framework (작업일보 현황 분석에 따른 개선방향 제시)

  • Kim Bong-nyoun;Kim Chang-Duk;Ee Hyun-Soo;Kim Sun-Kuk;Seo Sang-Wook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.4 no.2 s.14
    • /
    • pp.66-73
    • /
    • 2003
  • Building construction projects are performed by a number of sub-contractors specialized in diverse trades. Therefore information management among these constituents is quite challenging especially due to exponentially increasing manpower and material resources. In recognition of the importance of information management in project sites a number of systems have been suggested, but the application is limited one of the main reason is that general contractors use these systems and sub-contractor's participation understanding and financial ability are limited. Besides other problems such as loss along communication channel, distortion of information due to inefficient input device and tremendous amount of time and labor are required for collection analysis, and management of information to prepare a daily-report. Therefore the Purpose of this study is to improve reporting process through analyzing current daily reporting system. This paper also suggests the direction of the improved daily reporting system to enhance the performance of construction projects through incorporating sub-contractor's participation in daily reporting system.

Improvement of Activities of Daily Living through Visiting Nursing Care under Long-Term Care Insurance: A Case Report using the OMAHA System (방문간호를 통한 일상생활동작 수행능력 개선에 대한 사례보고: 오마하시스템을 활용하여)

  • Song, Yeon Yi;Park, Eun Jin
    • Journal of Korean Academy of Rural Health Nursing
    • /
    • v.15 no.2
    • /
    • pp.66-73
    • /
    • 2020
  • Purpose: This study was done to report nursing case for ADL improvement of elders who have CVA(Cerebrovascular Accident) sequelae. Methods: The client had registered in the C visiting nursing center after being decided a long-term care Grade 2. Data were collected through consultation logs for recipients, Activities of Daily Living (ADL) records, fall risk assessment (Huhn) sheets, decubitus ulcer risk assessment (Braden Scale) sheets, cognition assessment (K-MMSE) sheets, long-term care benefit provision records, and interviews with visiting nurse. Data were collected and analyzed according to the Omaha System problem classification. The intervention scheme and the problem rating scale for performance were applied to present the case for home-visit nursing. Results: The client registered in August, 2018, was provided home-visit nursing care once a week as of September 2020. ADL, cognitive levels and decubitus ulcer risks were found to have improved. Conclusion: This case report presents the value of classifying nursing problems and checking nursing intervention provided to patients with problems of ADL. The presentation of home-visit nursing cases applying a standardized nursing problem classification scheme for clients with various problems showed that a high quality level of care is guaranteed and evidence-based nursing can be provided by visiting nurses.

A Plan for Better Productivity of Sub-Contractors through Improvements of Daily Reporting Process (작업일보 작성프로세스 개선을 통한 협력업체 생산성 향상방안에 관한 연구)

  • Kim Bong-Nyoun;Kim Chang-Duk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.375-378
    • /
    • 2002
  • Most construction works in a building site are progressed by many work categories and sub-contractors. Therefore there are many difficult things of management of construction-information because variable occurrences are happened to manpower and material resources. For this reason, various management systems are suggested, but the application of these systems are difficult because only construction company manages these systems and sub-contractor's participation, understanding and financial ability are insufficient. In addition to that, there are other problems such as lost information when it is carried, perversion and distrust of information by hand and lots of time and labor are necessary for collection, analysis, and management of information which are offered for daily report. so the purpose of this study is for improvement of reporting process with making an analysis of productivity effects and an analysis of function and problem of daily report. I intend to suggest the direction of improved daily report system for better productivity of construction work through input information and management of cooperation enterprises.

  • PDF

A Development of Task Generator through an Analysis of Task Location Information Structure (작업위치 정보체계 분석을 통한 작업정보 생성기 개발)

  • Chin Sangyoon;Kang Woo-Young;Kim Yea-Sang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.2 s.18
    • /
    • pp.64-71
    • /
    • 2004
  • A daily report is one of the critical documents in construction projects, since it helps them keep track of various as-built information. Despite the important role in progress management, the daily reporting process is time-consuming, and the representation of task information on daily reports are not effective enough to accumulate daily as-built information for further use in project management. Task information is composed of a specific work type and a location where the task is performed, which means that the same type of work is repeated over the locations. However, in many cases the task locations are described differently depending on a reporter's preference or experience. Without representing task location information effectively, it is difficult to accumulate and to reuse as-built information. The objective of this research is to build a framework for generating task information which can be efficiently accumulated and reused for progress management. To do so, this research built a task information model with focusing on the representation of task location associated with a work type, and developed an information system that supports automated and interactive generation of task information.