A Plan for Better Productivity of Sub-Contractors through Improvements of Daily Reporting Process

작업일보 작성프로세스 개선을 통한 협력업체 생산성 향상방안에 관한 연구

  • 김봉년 (광운대학교 대학원 건축공학과) ;
  • 김창덕 (광운대학교 건축공학부)
  • Published : 2002.11.01

Abstract

Most construction works in a building site are progressed by many work categories and sub-contractors. Therefore there are many difficult things of management of construction-information because variable occurrences are happened to manpower and material resources. For this reason, various management systems are suggested, but the application of these systems are difficult because only construction company manages these systems and sub-contractor's participation, understanding and financial ability are insufficient. In addition to that, there are other problems such as lost information when it is carried, perversion and distrust of information by hand and lots of time and labor are necessary for collection, analysis, and management of information which are offered for daily report. so the purpose of this study is for improvement of reporting process with making an analysis of productivity effects and an analysis of function and problem of daily report. I intend to suggest the direction of improved daily report system for better productivity of construction work through input information and management of cooperation enterprises.

현장에서 수행되는 대부분의 공사는 다수의 공종과 다양한 협력업체가 공사를 진행해 나간다. 그러므로 투입노무자 및 자원의 관리 상 변수의 발생이 많아 공사정보관리에 어려운 점이 많다. 이러한 현장공사의 효율적인 관리를 위해서 다양한 공사정보 관리 시스템 들이 제시되고 있으나, 시공업체 중심의 시스템 관리와 협력 업체의 참여도 및 이해도 부족과 영세로 인한 적용 어려움이 문제점으로 나타나고 있다. 또한 현장공사관리에 기초자료로 제공되는 작업일보의 정보들을 수집/분석/관리하는데 상당한 시간과 인력이 소모되고, 이동시 정보손실, 수 작업에 의한 정보의 왜곡 및 신뢰성 저하 등등 다양한 문제점이 나타나고 있다. 따라서, 본 연구에서는 기존 협력업체가 작성하는 작업일보의 기능 및 문제점을 분석하고, 작업일보내의 생산성 정보의 흐름 및 생산성 향상 요인을 분석하여, 작업일보의 작성프로세스를 개선하는 것을 목적으로 하고 있다. 더 나아가, 협력업체 중심의 정보입력 및 관리를 통한 공사의 생산성을 향상시킬 수 있는 개선된 작업일보 시스템의 방향을 제시하고자 한다.

Keywords