• 제목/요약/키워드: crown settlement

검색결과 73건 처리시간 0.024초

RMR을 이용한 풍화암 터널의 천단침하량 예측 평가 (Application for Prediction of Crown Settlements Using RMR in Weathering Rock Tunnels)

  • 김영수;김대만
    • 한국지반공학회논문집
    • /
    • 제25권10호
    • /
    • pp.67-76
    • /
    • 2009
  • 국내 풍화암 터널현장에서 수집한 RMR 평점, RMR* 평점 그리고 천단침하량의 자료를 이용하여 통계적 분석을 실시하였으며, 분석된 자료를 이용하여 회귀분석, 지수함수, 그리고 인공신경망(ANN)으로 천단침하량을 예측하였다. 예측 결과, ANN, 지수함수에 의한 근사함수, 그리고 회귀분석의 천단침하량 예측 순으로 실측치에 근접하였다. 회귀분석으로 추정된 천단침하량의 범위는 매우 넓게 분포하였으며, 계측치에 비하여 과대한 침하량을 예측하였다. 또한 모든 방법에서 RMR 평점을 사용한 예측이 RMR* 평점을 사용하여 예측한 결과보다 계측 침하량에 더 가까운 예측을 하였다.

터널천단변위와 암석 또는 암반의 일축압축강도를 이용한 시공 중인 터널의 예비 안정성 평가 (The Pre-Evaluation of Stability during Tunnel Excavation using Unconfined Compression Strength of Intact Rock or Rock Mass and Crown Settlement Data)

  • 박영화;문홍득;하만복
    • 한국도로학회논문집
    • /
    • 제17권6호
    • /
    • pp.27-32
    • /
    • 2015
  • PURPOSES : It is difficult to estimate tunnel stability because of lack of timely information during tunnel excavation. Tunnel deformability refers to the capacity of rock to strain under applied loads or unloads during tunnel excavation. This study was conducted to analyze a methods of pre-evaluation of stability during tunnel construction using the critical strain concept, which is applied to the results of tunnel settlement data and unconfined compression strength of intact rock or rock mass at the tunnel construction site. METHODS : Based on the critical strain concept, the pre-evaluation of stability of a tunnel was performed in the Daegu region, at a tunnel through andesite and granite rock. The critical strain concept is a method of predicting tunnel behavior from tunnel crown settlement data using the critical strain chart that is obtained from the relationship between strain and the unconfined compression strength of intact rock in a laboratory. RESULTS : In a pre-evaluation of stability of a tunnel, only actually measured crown settlement data is plotted on the lower position of the critical strain chart, to be compared with the total displacement of crown settlement, including precedent settlement and displacement data from before the settlement measurement. However, both cases show almost the same tunnel behavior. In an evaluation using rock mass instead of intact rock, the data for the rock mass strength is plotted on the lower portion of the critical strain chart, as a way to compare to the data for intact rock strength. CONCLUSIONS : From the results of the pre-evaluation of stability of the tunnel using the critical strain chart, we reaffirmed that it is possible to promptly evaluate the stability of a tunnel under construction. Moreover, this research shows that a safety evaluation using the actual instrumented crown settlement data with the unconfined compression strength of intact rock, rather than with the unconfined compression strength of a rock mass in the tunnel working face, is more conservative.

A study on the prediction of tunnel crown and surface settlement in tunneling as a function of deformation modulus and overburden

  • Kim Seon-Hong;Moon Hyun-Koo
    • 한국지구물리탐사학회:학술대회논문집
    • /
    • 한국지구물리탐사학회 2003년도 Proceedings of the international symposium on the fusion technology
    • /
    • pp.129-141
    • /
    • 2003
  • The precise prediction of ground displacement plays an important role in planning and constructing tunnels. In this study, an equation for predicting the surface and crown settlement is suggested by examining the theories of ground movement caused by tunnel excavation. From the 3D numerical modeling, the reinforcement effect of UAM (Umbrella Arch Method) is quantitatively analyzed with respect to deformation modulus and overburden. By using a regression technique for the numerical results, an equation for predicting the settlement is suggested.

  • PDF

계측자료를 이용한 터널의 종단변형도 (Longitudinal Deformation Profile in Tunnel using Measured Data)

  • 장원일;양형식;정소걸
    • 터널과지하공간
    • /
    • 제18권5호
    • /
    • pp.338-342
    • /
    • 2008
  • 기존의 연구에서 터널 종단변형도는 대부분 수치해석적 방법으로 구해졌으나, 본 논문에서는 실제 계측치를 이용하여 종단변형도를 구성하고 굴착에 따른 터널의 종단변위 발생 경향을 검토하였다. 막장전방의 변위는 수평경사계 계측치의 최대변위에 대한 지점 변위를 비교 분석하여 가장 적합한 결과를 나타내는 지점의 변위를 채택하였고, 막장 후방은 천단변위계에 의한 계측치를 회귀분석하여 구하였다. 연구 대상 터널의 계측치로 천단변위를 분석한 결과, 막장 3D 이전부터 변위가 발생하였고, 막장에서는 수치해석적으로 구한 내공 변위에 비해 10%, 정도 높은 약 40%의 변위가 발생하였으며, 막장 후방 4D 이후 최종변위에 수렴하는 것으로 나타났다.

TROPICAL TREE MORPHOLOGY USING AIRBORNE LIDAR DATA

  • JANG, Jae-Dong;Yoon, Hong-Joo
    • 대한원격탐사학회:학술대회논문집
    • /
    • 대한원격탐사학회 2006년도 Proceedings of ISRS 2006 PORSEC Volume II
    • /
    • pp.676-679
    • /
    • 2006
  • Mangrove crowns were delineated using active sensor LIDAR (LIght Detection And Ranging) data by a crown delineating model developed in this study. LIDAR data were acquired from airborne survey by a helicopter for the estuary of Macouria in the northeast coast of French Guiana. The canopy height image was derived from LIDAR vector data by calculating the difference between ground and non-ground data. The mangrove site in the study area was classified to three sectors by the time of mangrove settlement; Mangrove 1986, 2002 and 2003. The estimated crown of Mangrove 1986 was reliable defined for their size, number and volume because of larger crown size and bigger variation of crown height. The tree crown size of Mangrove 2002 and 2003 by the model was overestimated and the number of trees was much underestimated. The estimated crown was not for single crown but a crown group due to homogenous crown height and spatial resolution of LIDAR data. However the canopy height image derived from LIDAR data provided three-dimensional information of mangroves.

  • PDF

화강 풍화암지반의 터널굴착에 따른 변형예측 (The prediction of deformation according to tunnel excavation in weathered granite)

  • 차봉근;김영수;권태순;김성호
    • 한국터널지하공간학회 논문집
    • /
    • 제12권4호
    • /
    • pp.329-340
    • /
    • 2010
  • 터널과 같은 지하공동 구조물의 역학적 거동은 지반의 복잡성 및 불확실성으로 인해 예측이 매우 어렵다. 터널굴착에 따른 거동 예측은 주로 모형실험이나 수치해석을 이용한 방법을 사용한다. 그러나 모형실험은 현장조건을 재현하기 어렵고, 수치해석 또한 적합한 구성 모델의 선정과 입력인자를 구하기가 매우 힘들다. 본 연구는 국내 화강암 풍화토 지반에 건설되는 터널의 천단침하와 내공변위에 대한 계측자료와 RMR을 근거로 하여 회귀분석방법을 사용하여 천단침하와 내공변위를 예측하였다. 계측자료를 분석한 결과 터널 굴착에 따른 천단침하는 굴착 초기인 약 20일 이내에 총 변위 변화량의 약 70~80%가 발생되었다. 천단침하와 내공변위를 예측한 결과, 지수함수가 대수함수보다 비교적 계측값에 잘 일치하였다. 또한 RMR값과 각 단면의 변위를 비교하여 상관관계식을 얻었다.

터널의 계측결과 종합분석에 의한 지반의 거동 및 터널 구조체의 역학적 특성 연구 (A Study on the Mechanical Characteristics of Tunnel Structures and Ground Behavior by Synthetic Analysis Method with Tunnel Monitoring Results used)

  • 우종태
    • 한국구조물진단유지관리공학회 논문집
    • /
    • 제7권3호
    • /
    • pp.115-124
    • /
    • 2003
  • 본 연구에서는 공사중 계측 결과와 유지관리 계측 결과를 토대로 다양한 분석방법을 통하여 터널의 변위와 응력 등을 분석하였으며, 지반조건이 비교적 연약한 풍화대를 통과하는 지하철 터널의 거동을 분석하여 터널 라이닝의 역학적 특성을 분석하였다. 공사중 계측결과 상부 및 하부 반단면 굴착 완료시의 계측결과를 단순화하여 터널 굴착시 천단침하가 지표침하와 내공변위보다 크다는 것을 확인하였으며, 천단침하와 천단숏크리트 라이닝응력이 역해석 시에 가장 많이 사용되는 계측항목임을 알 수 있었다. 그리고, 간극수압 분석결과를 통해 배수형 터널에 설계시 적용되고 있는 잔류수압의 타당성을 분석하였다.

고밀도 레이저 측량을 이용한 터널의 천단 및 내공 변위 관측 (Tunnel Convergence and Crown settlement using 3D Laser Scanning)

  • 이재원;장상규;임영빈;문두열;윤부열
    • 한국측량학회:학술대회논문집
    • /
    • 한국측량학회 2006년도 춘계학술발표회 논문집
    • /
    • pp.507-512
    • /
    • 2006
  • There are many risks in constructing tunnel-structure. To prevent these risks from occurring and secure safety, the precise and rapid survey of inside displacement of the tunnel is required. But nowadays the measurement of the crown settlement, convergency, and surface settlement depends on general kinds of method which use total station or level. In the way to provide data about maintaining structure according to recent improvement and progress of measuring technology, 3D laser scanning is used. It solves the problem of reliability in measuring displacement of existing structure, provides material that enables to estimate shape change of structure visually, and makes it possible to deliberate speedy countermeasure. By this three dimensioning it is possible to make efficient use of structure maintenance and field measurement

  • PDF

천단변위의 x-Rs 관리도 분석을 이용한 터널 막장 전방 단층대 예측 (Prediction of fault zone ahead of tunnel face using x-Rs control chart analysis for crown settlement)

  • 윤현석;서용석;김광염
    • 한국터널지하공간학회 논문집
    • /
    • 제16권4호
    • /
    • pp.361-372
    • /
    • 2014
  • 터널 변위 계측은 전방의 단층대의 예측과 안정성 해석에서 매우 중요하다. 본 연구에서는 3차원 유한요소해석을 통해 터널 단층대의 방향과 존재에 따른 터널의 거동 특성을 평가하였다. 터널의 거동을 대표하는 계측치인 천단변위를 막장면에서 5 m 떨어진 지점에서 평가하였으며, 경향선과 L/C비 (종방향변위/천단변위)를 계산하여 통계적 관리기법인 x-Rs를 적용하여 단층대의 예측방안을 제시하였다. 결과적으로, x-Rs 관리도 기법이 전방 단층대의 존재와 방향을 예측하는데 활용될 수 있음을 확인하였다.

3 차원 레이저 스캐닝을 이용한 터널의 천단 및 내공 변위 관측 (Tunnel Convergence and Crown Settlement Using 3D Laser Scanning)

  • 이재원;윤부열
    • 대한공간정보학회지
    • /
    • 제15권2호통권40호
    • /
    • pp.67-75
    • /
    • 2007
  • 터널 구조물 시공시에 수많은 위험요소를 가지고 있다. 이러한 요소들을 미연에 방지하고 안정성 확보를 위해서는 터널 내부의 변위에 대한 정확하고 신속한 관측이 요구된다. 그러나 현재 천단침하, 내공변위, 지표침하 등은 토탈 스테이션. 각종 계측기를 이용하는 보편적인 측량 방법에 의존하고 있는 실정이다. 최근 측량기술의 향상과 개발에 따른 구조물의 유지관리에 대한 자료를 제공하기 위한 방법으로 3차원 레이저 스캐닝을 이용하여 기존 구조물의 변형량 계측방법의 신뢰성 문제를 해결하고, 구조물의 형태 변화를 3차원화 하여 시각적으로 판단할 수 있는 자료를 제시하고 빠른 대책을 강구할 수 있도록 하여 구조물의 유지관리 및 현장계측에 능률적으로 활용할 수 있도록 하였다.

  • PDF