Since the middle of 1950's, containerization has been rapidly spread over the world in virtue of great merits providing to interensts, and the fundamental changes in port management and prot operations are resulted. As the container terminal is a complex system which is consisted of various subsystems, the treatment for improving the productivity is required in a comprehensive fashion, both in each of its parts and as an integrated system. This paper aims to make an intensive analysis of the Busan Container Terminal system, especially focusing on its subsystems such as ship operation system, storage system and transfer system. First of all, the intrinsic capacity of various subsystems is calculated and it is checked whether the current operation is being performed effectively through the formal analysis. Secondly, the suggestion is presented to improve the operation by considering the throughput that the port of Busan will have to accept in the near future. The results are as follows; 1) As the inefficiency is due to the imbalance between various subsystems at Busan terminal, transfer equipment level must be up to 31% for straddle carrier and 67% transfer crane above all. 2) The yard capacity must be increased by reducing the free dwell time of containers in order to accept the traffic volume smoothly in the near future. 3) The better way to reduce the port congestion is to change berthing rule from the FIFP to the Pre-allocated system by considering the ship arrival pattern.
Korean Journal of Construction Engineering and Management
/
v.13
no.1
/
pp.53-66
/
2012
Gangform compared with conventional wood and steel form is systemized form which has a capability to install and dismantle form at a time without repeating to assembly and disassembly small members. Gangform compared with ACS has some problems such as 1) Tower Crane load increase, 2) increase in safety incidence during climbing Gangform, 3) decrease in detachment operation productivity, 4) stop work due to climate impacts, and 5) decrease in labor cost, productivity, quality. A conceptual design model of automated Gangform climbing system is suggested for apartment housing construction to show its technical/economic feasibility and workers' safety while increasing operation productivity and concrete quality.
Though the productivity increased by 50% as KBCT was the first to use ATC System in Korea, productivity is unlikely to be improved any longer because of unsatisfactory detailed automation technology development. Accordingly, the government embarked on 'high efficiency ATC technology development', but it is important to avoid overlapping with other advanced technology which is already developed, and to develop differentiated technology which has the way about it. To accomplish this, this paper suggested in-depth analysis about established domestic and overseas technologies, clear goal setting to achieve world-class level productivity, and rational development road map for success in technology development. Through this, as to the ATC automatization technology development, the ports of our country precedes in a competition with the ports of the neighboring country, and it will jump to the Northeast Asia Logistics-Hub-port and a role as growth engine for next-generation in our country will be played. In addition, the result of the technology development will become the standard of the performance evaluation of the relative technique of the domestic automated terminal, and will be leads the world in this field of technology.
Kim, Yun-Sik;Cho, Jae-Kyong;Kim, Min-Ji;Cho, Kyu-Man;Hyun, Chang-Taek
Journal of the Korea Institute of Building Construction
/
v.10
no.2
/
pp.33-40
/
2010
Recently, the scale of construction work has been growing, and buildings are becoming higher. To enable greater efficiency of construction work, the use of vertical transportation equipment has been radically increasing. In this context, many studies have been conducted on tower cranes. While these studies have discussed issues such as the selection of tower cranes, the optimization of locations, and the hoisting time of tower cranes, there has been no research on the installation of tower cranes. As such, the installation of tower cranes on construction sites has been accomplished based on subjective judgment and technical assistance, and the experience of workers in equipment companies. Therefore, this study analyzes the productivity of tower cranes using simulation methodology, and proposes a generalized model of the installation process of tower cranes in order to offer a basic resource that site managers can directly utilize.
Proceedings of the Korean Operations and Management Science Society Conference
/
2006.11a
/
pp.336-345
/
2006
최근 컨테이너 선박의 대형화는 물동량을 크게 증가 시켰으며, 이로 인해 컨테이너 터미널에서는 규모의 경제를 달성하고, 선사의 요구를 만족시키기 위해 노력하고 있다. 이에 대한대안이 양현부두(Indented berth)의 등장이다. 양현부두에는 대형 컨테이너선의 물량을 신속히 처리하기 위해 선석에서 컨테이너를 취급하는 장비인 안벽크레인(Quay Crane : QC)의 작업 대수가 일반부두(Conventional berth)보다는 많이 할당될 수 있다. 본 연구에서는 일반부두와 양현부두의 작업 생산성을 비교하였다. 이를 위하여 탐색기법인 GRASP(Greedy Randomized Adaptive Search Procedure)를 적용한 안벽크레인 일정계획 알고리즘을 이용하였다. 또한 컨테이너 터미널의 실제 자료를 이용하여 두 가지 형태의 부두에서의 본선작업 완료시간을 비교 하였다.
Proceedings of the Korean Institute of Building Construction Conference
/
2010.05a
/
pp.33-36
/
2010
The attention in construction Automation is getting higher since it could be the answer to the lack of skilled labor by decrease in construction population and aging which adversely affects productivity and quality in the construction site. We are on the way to develop a construction automation system adequate for domestic circumstances in Korea; it is called RCA(Robotic-crane based Construction Automation)system. Climbing hydraulic robots system is a part of RCA system and makes Construction factory(CF) climb through the guide rail on the core wall. The safety of climbing hydraulic robots system is at issue due to the overloaded weight of CF. Preventing this issue, present study did the design verification through the structural analysis and the simulation. Mock-up test also was done to analyze the drive performance of climbing hydraulic robots system.
Proceedings of the Korean Institute of Building Construction Conference
/
2011.11a
/
pp.15-16
/
2011
Construction automation and robotics are being taken notice as an alternative to improve productivity and quality. Reflecting on these purpose, automation system, called RCA(Robotic-crane based Construction Automation) system, is developed and have been verified through a pilot project recently in Korea. To apply the RCA system in high-rise building effectively, each management factors of element technologies in the system is derived and assessed critical factor. The purpose of this study, management factors of element techniques, consisted of RCA system, is classified through questionnaires/interviews targeting system developers and construction managers in pilot project site, and critical factors is selected using AHP.
The traditional measures of a container port (or terminal) efficiency such as crane productivity, cargo throughput, etc. were generally presenting the partial efficiency since they evaluated only each individual factor and based on cross-sectional data. To overcome this problem, and in an effort to help port authorities develop a winning strategy in the increasingly competitive container transportation market, this Paper develops a meaningful set of benchmarks that will set the standard for best practices. In particular, this paper proposed a combined method to merge the DEA and simulation technique over time. To illustrate the usefulness of the proposed combined DEA/simulation model, this paper used the panel data of the four Gwangyang container terminals and seven Busan container terminals in Korea over the four-year period of 1999 through 2002.
There is a worldwide trend to automate the handling operations in port container terminals in an effort to improve productivity and reduce labor cost. This study iscusses how to apply an AGV(automated guided vehicle) system to the handling of containers in the yard of a port container ter-minal. The main issue of this paper is how to assign tasks of container delivery to AGVs during ship operations in an automated port container terminal. A dual-cycle operation is assumed in which the loading and the discharging operation can be performed alternately. Mixed integer linear program-ming formulations are suggested for the dispatching problem. The completion time of all the dis-charging and loading operations by a quayside crane is minimized, and the minimization of the total travel time of AGVs is also considered as a secondary objective. A heuristic method using useful properties of the dispatching problem is suggested to reduce the computational time. The perfor-mance of the heuristic algorithm is evaluated in light of solution quality and computation time.
Special Issue of the Society of Naval Architects of Korea
/
2005.06a
/
pp.165-170
/
2005
The weight of a ship depends on the size of the ship. Normal lightweight of a ship is over 10,000 tons. So it is inevitable to divide a ship into about more than hundreds of lumps. Each of lumps is called as a block in shipbuilding. The sizes of blocks are decided by a yard's facilities. Among them lifting cranes are most decisive facilities. By block's size the productivity of a yard is decided very much. So it is very important to have a proper block division during shipbuilding. This paper refers to the recent trend of block division among yards. This paper would give an idea how to decide boundaries of blocks. Block division also decides both quality of a ship and work volume of it. These days the block erection method is changed dramatically due to use sea barge mounted crane for erection of a grand ring block. This paper explains the new trend of block division in shipbuilding.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.