• 제목/요약/키워드: cost-schedule data

검색결과 188건 처리시간 0.028초

Cost and Schedule Analysis of Highway Projects based on Project Types

  • Shrestha, Bandana;Shrestha, Pramen P.
    • 국제학술발표논문집
    • /
    • The 9th International Conference on Construction Engineering and Project Management
    • /
    • pp.50-56
    • /
    • 2022
  • Change Orders generally impact cost and schedule performance of highway projects. However, highway projects that do not have any change orders also face cost growth and schedule delays. This study seeks to determine the cost and schedule performance of Texas DOT projects by collecting project data for 120 highway projects completed between 2016 to 2020. For the study, we selected project data that has zero or negative change orders which were then grouped and analyzed based on their Project Types i.e., maintenance works; structural works; restoration and rehabilitation works; and safety works. The study found that performance of Maintenance and Safety type projects had less cost and schedule growth among the data analyzed. Statistical tests also found that even though the projects have no change orders, Rehabilitation and Restoration type projects experienced significant schedule growth compared to others. However, the data did not show any significant cost and schedule growth for the projects when statistical tests were performed on overall data. The study concluded that highway projects are experiencing schedule growth even though the projects had no change orders. Results from the study can help planners, engineers, and administrators to gain better insight on how different types of highway projects are performing in terms of cost and schedule and eventually derive appropriate solutions to minimize cost and schedule growth in such projects.

  • PDF

물량 산출 및 생산성 분석 기반의 거푸집공사 비용공정 통합 모델 (Integration Model of Cost and Schedule in Aluminum Form Work based on Quantity Take-offs and Daily Productivity Analysis)

  • 지성민;현창택
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2011년도 추계 학술논문 발표대회
    • /
    • pp.17-18
    • /
    • 2011
  • Over the past 20 years, Researchers have tried to develop "Integration Model of Cost and Schedule" in construction industry. They suggested various models and techniques, however, it is still required to develop new methodology for AL Form Work in Public Multi-Housing Projects. Accordingly, this research focused on measuring quantity take-offs of on-going projects and analysing the basic process of using the resources(Labor, Material, Plant) related to cost and time data. There are 3 steps of this research : 1) The literature review of previous studies about Integration Model of Cost and Schedule was conducted. 2) Model for integration between cost and schedule was developed. 3) the accuracy of developed model was verified. The results are expected to improve in integrated managing the cost and schedule data of AL form work.

  • PDF

A STUDY ON BIM-BASED 5D SIMULATION IN WEB ENVIRONMENT

  • Jae-Bok Lim;Jae-Hong Ahn;Ju-Hyung Kim;Jae-Jun Kim
    • 국제학술발표논문집
    • /
    • The 5th International Conference on Construction Engineering and Project Management
    • /
    • pp.169-172
    • /
    • 2013
  • Building Information Modeling (BIM) is an effective decision-making platform that helps to save project cost and enhance quality of construction. By generating and linking a wide variety of objects data, BIM can be effectively utilized, and it should be ensured that object properties maintain consistency throughout the project period of design, estimates, construction, maintenance and repair. This study examined how to utilize BIM data in a construction project, by linking cost and schedule data in web environment, to better utilize the information and maintain consistency of the BIM information. To do so, the model integrated WBS data and CBS data, linked them with BIM model to realize 5D simulation in web environment. As a result, cost and schedule data could be simultaneously acquired, and object properties-cost, schedule, location-as well. These are expected to contribute to developing a BIM-based automatic data-processing system in web environment.

  • PDF

수술수가의 적정성에 관한 연구 - 상대가격체계와 항목분류를 중심으로 - (A Study on the Propriety of the Medical Insurance Fee Schedule of Surgical Operations - In Regard to the Relative Price System and the Classification of the Price Unit of Insurance Fee Schedule -)

  • 오진주
    • 한국보건간호학회지
    • /
    • 제2권2호
    • /
    • pp.21-44
    • /
    • 1988
  • In Korea, fee-for service reimbursement has been adopted from the begining of medical insurance system in 1977, and the importance of the relative value unit is currently being investigated. The purpose of this study was to find out the level of propriety of the difference in the fees for different surgical services, and the appropriateness of the classification of the insurance fee schedule. For the purpose of this study, specific subjects and the procedural methodology is shown as follows: 1. The propriety of the Relative Price System(RPS). 1) Choice of sample operations. In this study, sample operations were selected and classified by specialists in general surgery, and the number of items they classified were 32. For the same group of operations the Insurance Fee Schedule(IFS) classified the operations into 24 separate items. In order to investigate the propriety of the RPS, one of the purpose of this study, was to examine the 24 items classified by the IFS. 2) Evaluation of the complexity of surgery. The data used in this study was collected The data used in this study was collected from 94 specialists in general surgery by mail survey from November I to 15, 1986. Several independent variables (age, location, number of bed, university hospital, whether the medical institution adopt residents or not) were also investigated for analysis of the characteristics of surgical complexity. 3) Complexity and time calculations. Time data was collected from the records of the Seoul National University' Hospital, and the cost per operation was calculated through cost finding methods. 4) Analysis of the propriety of the Relative Price System of the Insurance Fee Schedule. The Relative Price System of the sample operation was regressed on the cost, time, comlexity relative ,value system (RVS) separately. The coefficient of determination indicates the degree of variation in the RPS of the Insurance Fee Schedule explained by the cost, time, complexity RVS separately. 2. The appropriateness of the classification of the Insurance Fee Schedule. 1) Choice of sample operations. The items which differed between the classification of the specialist and the classification of medical, Insurance Fee Schedule were chosen. 2) Comparisons of cost, time and complexity between the items were done to evaluate which classification was more appropriate. The findings of the study can be summarized as follows: 1. The coefficient of determination of the regression of the RPS on-cost RVS was 0.58, on time RVS was 0.65, and on complexity RVS was 0.72. This means that the RPS of Insurance Fee Schedule is improper with respect to the cost, time, complexity separately. Thus this indicates that RPS must be re-shaped according to the standard element. In this study, the correlation coefficients of cost, time, complexity Relative Value System were very high, and this suggests that RPS could be reshaped I according to anyone standard element. Considering of measurement, time was thought to be the most I appropriate. 2. The classifications of specialist and of the Insurance Fee Schedule were compared with respect to cost, time, and complexity separately. For complexity, ANOVA was done and the others were compared to the different values of different classifications. The result was that the classification of specialist was more reasonable and that the classification of Insurance Fee Schedule grouped inappropriately several into one price unit.

  • PDF

환율변동에 따른 의료보험 진료수가의 영향률 산출 - 한 대학병원의 원가분석을 중심으로 - (The Calculation of the Effected Rate in Medical Insurance Fee Schedules according to Fluctuation of Foreign Currency Exchangerate through Cost Analysis in a University Hospital)

  • 박은철;박웅섭;김소윤;김한중;손명세;임종건;김영삼
    • 보건행정학회지
    • /
    • 제8권2호
    • /
    • pp.76-87
    • /
    • 1998
  • This study analyzed the effect of foreign currency exchange rate on the increasing rate of medical care cost by items of fee schedule of Korean Medical Insurance. This study uses the data of cost analysis including cost of imported goods and the data of for a university hospital National Federation's Medical Insurance for a trend of claim. The method of cost analysis is as same as that used in the study of the development of Korean RBRVS(Resource Based Relative Valus Scale). The main findings of this study are as follows; 1. The proportion of imported goods in cost related to Medical Insurance fee schedule is 7.93%, and in case of substitution of available domestic goods 6.96%. 2. If foreign currency exchange rate changes from 800wen per $1 to 1,300won, the affecting rate of Medical Insurance fee schedules is 5.00%. If the imported goods will be substituted with available domestic goods, the rate 4.35%. Our results can be used a data for updating Medical Insurance fee schedule. But this result is limited to be generalized, because this study used the cost analysis for a university hospital.

  • PDF

국방 R&D프로젝트의 일정-비용분석모델의 연구 (A study on a schedule-cost analysis model for defense R&D project planning)

  • 황홍석;류정철;정덕길
    • 한국경영과학회:학술대회논문집
    • /
    • 대한산업공학회/한국경영과학회 1996년도 춘계공동학술대회논문집; 공군사관학교, 청주; 26-27 Apr. 1996
    • /
    • pp.213-216
    • /
    • 1996
  • R'||'&'||'D project management is a process of decisions concerned with the achievement of goals of objectives. Especially, defense R'||'&'||'D project planning is the key in the successfull management of defense development. The defense project managers are constantly having to perform "what if\ulcorner" exercise, such as what if the project is extended out for an additional cost\ulcorner In this reserch, we developed a schedule-cost analysis model based upon Critical Path Method(CPM) and Venture Evaluation and Review Technique(VERT) for schedule-cost trade off analysis defense R'||'&'||'D projects. In the first step, a deterministic model is developed as a heuristic which deterministic model is developed as a heuristic which determines the schedule extension and reduction cost as a function desired schedule. In the second step, a stochastic network simulation model is developed to analyse the project risk (sucess and failure). The expected time and cost can be determined for desired schedule under the assumptions of stochastic arc data (time and cost) with a various precedence relationships. This model provides the defense R'||'&'||'D managers with an estimated and expected cost for curtailing or extending a project a given amount of time. The effectiveness and efficiency of the proposed methods, a heuristic and stochastic networks simulations, have been demonstrated through examples.

  • PDF

대형건설공사의 프로세스 및 데이터 모델링을 통한 건설프로젝트관리체계 구축에 관한 연구 (Development of Construction Project Control System for Large Sized Construction by Process and Data Modeling)

  • 최윤기;이현수;황영삼;김영석;김우영;송영웅
    • 한국건설관리학회논문집
    • /
    • 제5권2호
    • /
    • pp.153-161
    • /
    • 2004
  • 대형 건설프로젝트의 효율적인 운용을 위해서는 프로젝트 각 분야간의 유기적인 관리체계가 필수적이라 할 수 있다. 대형 건설프로젝트의 관리업무 중 일정, 비용, 자재, 노무관리업무는 상호 유기적 종합관리를 가능하게 하는 업무들이며 이들을 종합적으로 $분석\cdot평가$할 수 있는 데이터 중심의 정보교환체계가 필수적이라 할 수 있다. 건설프로젝트관리의 $비용\cdot일정관리$업무에서 발생하는 자료의 중요성 및 활용빈도는 타 관리보다 높으며 건설공사의 효과적인 수행에 미치는 영향이 크다. $비용\cdot일정$ 통합데이터 통합관리를 통한 건설프로젝트관리체계를 수립하는 것은 생산성 측면과 자료 활용도 측면에서 더욱 효과적이라 할 수 있다. 본 논문에서는 $비용\cdot일정$ 통합 데이터베이스를 기반으로 하고 비용, 일정, 자재, 노무관리에 관련된 현장업무 분석을 통하여 대형건설공사의 프로세스 및 데이터 모델링을 통한 제반 필요정보의 분석 및 구조화를 제시하고자 한다.

EVMS를 도입한 공정의 성과지수 분석 (Performance Index Analysis of Schedule Introducing EVMS)

  • 김영;이영대;김성환;김정기
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2002년도 학술대회지
    • /
    • pp.456-459
    • /
    • 2002
  • 오늘날 건설공사의 효율화를 위한 EVMS(Earned Value Management System)도입의 중요성을 인식하고 많은 연구가 발표되고 있다. 그러나 EVMS를 도입한 공정에 대한 경험부족과 국내 건설의 제도적${\cdot}$환경적 요인으로 인해서, 기술적인 분석이나 사례분석에 대한 관한 연구는 아직 미흡한 실정이다. 본 연구에서는 EVMS를 도입한 공정상에 성과지수(SPI : Schedule Performance Index, CPI : Cost Performance Index)를 산정하여, 여러 통계적 분석방법을 적용해서 프로젝트 관리상에 일정, 비용상의 추세(Trend) 및 문제의 원인을 분석${\cdot}$연구하고자 한다.

  • PDF

Schedule Optimization in Resource Leveling through Open BIM Based Computer Simulations

  • 김현주
    • 한국BIM학회 논문집
    • /
    • 제9권2호
    • /
    • pp.1-10
    • /
    • 2019
  • In this research, schedule optimization is defined as balancing the number of workers while keeping the demand and needs of the project resources, creating the perfect schedule for each activity. Therefore, when one optimizes a schedule, multiple potentials of schedule changes are assessed to get an instant view of changes that avoid any over and under staffing while maximizing productivity levels for the available labor cost. Optimizing the number of workers in the scheduling process is not a simple task since it usually involves many different factors to be considered such as the development of quantity take-offs, cost estimating, scheduling, direct/indirect costs, and borrowing costs in cash flow while each factor affecting the others simultaneously. That is why the optimization process usually requires complex computational simulations/modeling. This research attempts to find an optimal selection of daily maximum workers in a project while considering the impacts of other factors at the same time through OPEN BIM based multiple computer simulations in resource leveling. This paper integrates several different processes such as quantity take-offs, cost estimating, and scheduling processes through computer aided simulations and prediction in generating/comparing different outcomes of each process. To achieve interoperability among different simulation processes, this research utilized data exchanges supported by building SMART-IFC effort in automating the data extraction and retrieval. Numerous computer simulations were run, which included necessary aspects of construction scheduling, to produce sufficient alternatives for a given project.

DEVELOPING WEB-BASED 5D SYSTEM CONNECTING COST, SCHEDULE AND 3D MODEL

  • Hando Kim;Jaehong Kim;Junghoon Han;Yonghan Kim
    • 국제학술발표논문집
    • /
    • The 4th International Conference on Construction Engineering and Project Management Organized by the University of New South Wales
    • /
    • pp.157-161
    • /
    • 2011
  • BIM having started from architecture is being used in civil structure, but there are very few examples despite its effectiveness. In this paper, based on BIM technology, it is presented the method and result of developing web-based 5D system connecting cost, schedule and 3D model from the cable-stayed bridge. Through the system, the user can understand easily schedule on specific time and during some period and extract cost directly. This system also can manage various data types such as drawings, 3D models, documents and photos, for enhanced communication between stakeholders.

  • PDF