• Title/Summary/Keyword: cost items

Search Result 918, Processing Time 0.029 seconds

Object & Parameter based Schematic Estimation Model for Predicting Cost of Building Interior finishings (오브젝트-파라미터기반 건축마감공사비 개산견적 모델)

  • Koo, Kyo-Jin;Park, Sung-Ho;Park, Sung-Chul;Song, Jong-Kwan
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.6
    • /
    • pp.175-184
    • /
    • 2008
  • For deciding the profitability and feasibility of the construction project, the schematic estimation has to not only link the design decision-making but also estimate the cost with reliability. The prototype-based schematic estimation system was developed for easily linking with design-making and supports to evaluate the design alternatives in the design development stage but didn't consider the cost estimated by parameter and additional work items by users. This research presents the object-parameter based schematic estimation model in the design development stage that can lead to accurately estimate the cost by using historical data from the high-storied office buildings. For the development of the proposed model for schematic estimation, after analyzing and classifying the work items from the Bills of Quantities(BOQs) and drawings of historical data, this research proposed the methods of estimating cost in accordance with attributes of each work item. In addition, a case study is performed for the effectiveness as comparing the previous estimating method with the proposed model.

The Trend-analyses of Studies on Estimation of Cost for Early Childhood Education and Child-care Services (유아교육비·보육비 산정연구 동향분석)

  • Lim, Yang Mi;Kim, Hye Gum
    • Korean Journal of Childcare and Education
    • /
    • v.9 no.4
    • /
    • pp.75-106
    • /
    • 2013
  • This study aimed to analyze the trends of studies on estimation of cost for early childhood education and child-care services provided by both the kindergarten and child-care centers. A total of 21 papers including academic journals and policy research reports were collected. The papers were analyzed with the annual trends, research contents, and estimation methods of cost for early childhood education and child-care services. The main results of this study were as follows. Firstly, the studies on estimation of cost for early childhood education were performed earlier than the ones on estimation of cost for child-care services. The research contents were composed of analyzing operating expenses and estimating cost for early childhood education and child-care services. Secondly, there were similarities in the estimating processes of cost for early childhood education and child-care services, but the definition of operating expenses used for the estimation of cost differed. Thirdly, there were differences in the items of operating expenses inputted to estimate cost and in the calculation procedures of items in studies. Finally, based on the results, this study suggested what future studies and policy should consider in the estimation of cost for early childhood education and child-care services.

A Study on the Space Size Analysis in the Multifamily Housing in aspect of management cost. -Focused on the Central Heating System using the diesel, kerosene- (공동주택 관리비용에 따른 적정공간규모 산정에 관한 연구 -경유, 등유를 사용하는 중앙집중난방방식을 중심으로 -)

  • 이강희;양재혁
    • Journal of the Korean housing association
    • /
    • v.13 no.5
    • /
    • pp.89-99
    • /
    • 2002
  • The multifamily housing has various advantages in construction cost, land-use intensity. KRIHS(1997) recommended the proper scale of th multifamily housing as 800 households in constructability, 1,000 households in facility compactability, 500 households in social aspect. At the early planning stage of project, the size of the multiftmily housing has, until now, been maximizingly considered under the regulation on which has been emphasized at the building volume ratio, land area, etc., except for the expenditure during the maintenance stage. This paper aimed at providing the proper size of multifamily housing in aspect of area and household number with maintenance cost at the early stage of project. For these, it took 곧 average cost function which is made from the 3-rd quardratic form and analyzes the unit increasing rate of the average cost. It surveyed in nationwide focused on the central heating system using diesel and kerosene. The number of samples is 88 and items of management cost is 11. The results are as follows ; first, 3rd-order quadratic function is proper at explaining the cost variation, considering the multicollinearity and statistics. Second, the proper size of multifamily housing is recommended with 83,000 $m^2$ on management area, 820 or over the 2,630 household number in aspect of total management cost.

A Proposal of BIL for Reasonable Cost Estimation of Mechanical Contracts and Construction in Design Phases (설계단계에서 적정 기계설비 공사비 산정을 위한 BIM 정보표현수준(BIL) 개선안)

  • Park, Bo Sung;Kim, Sean Hay
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • v.29 no.12
    • /
    • pp.663-672
    • /
    • 2017
  • Building information modeling (BIM) technology based on 3D modeling has been applied to the entire domestic construction industry since 2010. It can calculate quantity take-off considering construction productivity at design phase. Based on this, it is possible to improve the reliability of construction cost prediction of design phase in the process of cost estimation. However, Building Information Level (BIL) defined by Ministry of Land, Infrastructure and Transport and Public Procurement Service does not seem to offer doable environment due to the lack of detailed application items. By calculating construction cost that meets Construction Cost Estimate Accuracy by American Association of Cost Engineers (AACE) through quantity take-off and cost estimation based on 3D modeling of BIM technology, a BIL improvement proposal at design phase for Mechanical Contracts and Construction is provided here. Results showed that properties including outline and minimum specification of the main equipment, internal main piping, and internal main duct should be defined from the intermediate design phase to have reliable cost estimation.

Economic Analysis of Heat Pump System through Actual Operation (히트 펌프 냉난방 시스템의 실사용을 통한 경제성 분석)

  • Shin, Gyu-Won;Kim, Gil-Tae;Joo, Ho-Young;Lee, Jae-Keun
    • Proceedings of the SAREK Conference
    • /
    • 2006.06a
    • /
    • pp.921-926
    • /
    • 2006
  • The present study has been conducted economic analysis through actual operation of EHP and GHP which are installed at the same building of an university Cost items, such as initial cost, annual energy cost and maintenance cost of each system are considered to analyze LCC and economical efficiency is compared. The initial cost is considered on the basis of actual costs, and annual energy cost is converted into the cost after measuring electricity and gas consumption a day. LCC applied present value method is used to assess economical efficiency of both them. Variables used to LCC analysis are electricity cost escalation rate, natural gas cost escalation rate, interest rate, and service lives and when each of them are 4%, 2%, 8%, and 20 years, results of analysis short that EHP(148,257,306 won) is 8.05%(12,981,990 won) more profitable than GHP(161,239,295 won).

  • PDF

Knowledge Assisted Pricing Advisor for Large-scale Retailers: KAPA

  • Sung, Nahk-Hyun;Lee, Jae-Kyu
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 1998.10a
    • /
    • pp.36-39
    • /
    • 1998
  • It is very difficult for the large-scale retailers, who deal with tens of thousands of items, to price all the items dynamically reflecting all the constraints and policies. In spite of its importance, the prices are determined by human experts because the process of setting the prices of all the items is not established yet. To solve this problem, we adopt a mixed model that combines three typical pricing models: cost-plus model, competition-oriented model, and demand-oriented model. Since each model an be converted to a set of constraints in point and interval forms, solving the pricing problem with the three groups of models requires an algorithm which can solve the problem with weighted constraints of intervals and points. So we have devised an algorithm named “Point Determination Algorithm”. From the rules that represents tile models, the constraints are extracted to be solvable by tile Point Determination Algorithm. A prototype KAPA (Knowledge Assisted pricing Advisor) is developed with this idea using the expert system environment UNIK - a tool developed by KAIST. According to the experiment with 76 items in comparison with 53 human pricing experts we confirmed that the KAPA can perform highly consistent with human experts. This implies KAPA system is applicable to pricing millions of items dynamically.

  • PDF

AHP 기법을 이용한 안티바이러스 소프트웨어 평가 요인 분석

  • Kim, Jong-Ki;Hwang, Suk-Yeon;Lee, Dong-Ho
    • The Journal of Information Systems
    • /
    • v.14 no.1
    • /
    • pp.19-40
    • /
    • 2005
  • The history of computer virus comes along with that of computer. Computer virus han surfaced as a serious problem in information age. The advent of open network and widespread use of Internet made the problem even more urgent. As a method of defense for computer virus most companies use anti-virus software. Selecting appropriate anti-virus software involves various criteria and thus it is a multiple-attribute decision making problem. The purpose of this study is to prioritize anti-virus software evaluation factors. To do that, first of all, important evaluation factors are selected based on previous research on anti-virus software as well as general software evaluation models. Then, a questionnaire survey was conducted on end-users, system administrators and anti-virus software developers. The survey result was analyzed with ExpertChoice 2000 which is based on Analytic hierarchy Process technique. This study found that there are clear differences among three survey groups regarding the relative importance of overall evaluation factors. End-user group ranked "cost" first, but it was the least important factor to developer group. Developers pointed out "operational support" ad the most important factor. There were also obvious differences in the relative importance of detail evaluation items. Both end-users and system administrators shared 7 common items among top 10 most important items. Moreover, neither of the two groups ranked any of the items in the "operational support" factor in top 10, whereas all 4 items in the factor were included in top 10 by developer group.

  • PDF

The Impact of Failure Frequency Items on Availability and Operation Support Costs of Armored Vehicles (장갑차의 가용도와 운영유지비용에 미치는 고장 다빈도 품목의 영향성 분석)

  • Bong, Ju-Sung;Baek, Il-Ho;Kim, Min-Seop;Hur, Jang-Wook
    • Journal of the Korean Society of Manufacturing Process Engineers
    • /
    • v.20 no.4
    • /
    • pp.8-15
    • /
    • 2021
  • The effects on system availability, operation, and support costs were analyzed using the M&S system (MPS). The failure frequency items of current armored vehicles were identified and the MTBF of the identified items was improved. The results of this study suggest that when we reduce the frequency of failure, the availability increases, and the operation and support costs decrease. By improving the reliability of the failure frequency items, it becomes possible to upgrade or develop the weapons systems. Through this study, we confirmed that improving reliability will enhance combat readiness and reduce operation and support costs.

A study on the development of the korean hotel casino restaurant menus. - based on the Miller′s menu analysis - (국내호텔 Casino 식음료 업장의 메뉴에 대한 평가 분석 - Mi1ler의 메뉴 분석 기법을 중심으로-)

  • 김형렬
    • Culinary science and hospitality research
    • /
    • v.6 no.2
    • /
    • pp.47-65
    • /
    • 2000
  • This study is intended to present the direction for the wholesome development and support of the hotel casino industry in korea through the menu analysis of hotel casino restaurant. Miller's menu analysis was made of a lower food cost percentage in consideration of the quantity sold of each menu item and food cost percentage. As a result, it was shown that the proportion belonging to the upper category in the menu items intended for research in korean casino restaurant, it raises a problem in the menu management of korean casino restaurants.

  • PDF

A Rectifying Inspection Plan Giving LTPD Protection for Destructive Testing (파괴검사시(破壞檢査時)의 계수선별형(計數選別型) LTPD 보증(保證)샘플링 검사방식(檢査方式))

  • Yu, Mun-Chan
    • Journal of Korean Society for Quality Management
    • /
    • v.15 no.1
    • /
    • pp.68-75
    • /
    • 1987
  • A rectifying inspection plan is considered for the case of destructive testing. Screening inspection for rejected lots is performed by some nondestructive testing which is prone to misclassification errors. Apparent defectives found in the screening process is replaced with apparent good items. The plan provides LTPD protection on each individual lot while the sum of the cost of testing and the cost due to producer's risk at process average quality is minimized. A brief discussion on average outgoing quality is also given.

  • PDF