• Title/Summary/Keyword: cost breakdown system

Search Result 113, Processing Time 0.03 seconds

Runway visual range prediction using Convolutional Neural Network with Weather information

  • Ku, SungKwan;Kim, Seungsu;Hong, Seokmin
    • International Journal of Advanced Culture Technology
    • /
    • v.6 no.4
    • /
    • pp.190-194
    • /
    • 2018
  • The runway visual range is one of the important factors that decide the possibility of taking offs and landings of the airplane at local airports. The runway visual range is affected by weather conditions like fog, wind, etc. The pilots and aviation related workers check a local weather forecast such as runway visual range for safe flight. However there are several local airfields at which no other forecasting functions are provided due to realistic problems like the deterioration, breakdown, expensive purchasing cost of the measurement equipment. To this end, this study proposes a prediction model of runway visual range for a local airport by applying convolutional neural network that has been most commonly used for image/video recognition, image classification, natural language processing and so on to the prediction of runway visual range. For constituting the prediction model, we use the previous time series data of wind speed, humidity, temperature and runway visibility. This paper shows the usefulness of the proposed prediction model of runway visual range by comparing with the measured data.

Analysis and survey of design decision making process in steel production process

  • Furukawa, Satoru;Yoshida, Tomohiro;Chi, Naiyuan;Okamoto, Hiroyuki;Furusaka, Shuzo
    • International conference on construction engineering and project management
    • /
    • 2020.12a
    • /
    • pp.30-37
    • /
    • 2020
  • In the building construction, the steel-frame work occupies an important position in terms of structure, cost and quality. Especially in Japan, steel frames have traditionally been the main structure of many buildings. For steel-frame works in such positions, this paper investigates an existing steel fabricator to clarify the actual conditions of design decision making process and management method in steel production process. This study focuses on a steel fabricator (Company M in the following sentences), whose main market is Japan and which has facilities in Thailand, China, and Japan. Company M uses QR codes to control the production status of products, and exchanges all information between inside and outside the company via specialized departments in the form of documents. The authors have already analyzed the relationship between production lead time and defect rate based on actual project data at Architectural Institute of Japan in 2016. In 2019, we expressed the process from the confirmation of the design information of the current steel frame to the production by WBS, and clarified the relationship between the production lead time and steel frame product quality structurally. In this paper, the authors reoport the progress of the survey conducted so far, the positioning of the collected data, and the future survey policy.

  • PDF

Integrated Code Classification System for Work Sections in Standard Method of Measurement and Construction Standard Specifications (수량산출기준 및 공사시방서의 공종분류코드 통합기준 연구)

  • Kang Leen-Seok;Kwak Joong-Min
    • Korean Journal of Construction Engineering and Management
    • /
    • v.2 no.4 s.8
    • /
    • pp.80-91
    • /
    • 2001
  • Considering that the classified items in the work section level can have an applicability when those items are being used to cost and specification information with consistency, the work section classification code should be applied as an Integrated code system. Our construction industry is using three work section classification systems for civil engineering projects, such as integrated construction information classification system, standard method of measurement and guide of project specification. And each standard construction specification is also using different work section classification systems. This study suggests a methodology to integrate the code systems in construction specifications with civil engineering standard method of measurement. And the methodology suggested in this study was applied to a web-based prototype system with practical specification codes.

  • PDF

A Study on the Status and Utilization of Computed Tomography Units in Pusan Area (전산화(電算化) 단층촬영기(斷層撮影機)의 보유현황(保有現況) 및 이용실태(利用實態) (부산시내(釜山市內) 병원(病院)을 중심(中心)으로))

  • Oh, Moon-Young
    • Journal of radiological science and technology
    • /
    • v.14 no.1
    • /
    • pp.29-44
    • /
    • 1991
  • A Study on the distribution and types of the total 40 CT units, as of 1st October 1990, in Pusan area(29 for whole body CT units, 11 for brain CT units) were carried out during the period from January 1989 to December 1989 to find out the status of operation and utilization of whole body CT units. The results were as following ; 1. As of 1st October 1990 in Pusan area, a total of 40 CT units(29 for whole body CT units, 11 for brain CT units) were set up and operated. The number of cases of CT examination performed per day per unit were appeared to be less than 5 cases among 59.5% of CT units, and 2.7% of the total units has peformed more than 16 examinations. 2. The CT units under operation occupied 93.5% of the total and 2.6% of the total units was not properly been operated due to mechanical breakdown. This results is appeared to be better than other reports. 3. The average number of scanning per week for each CT were 35 cases and the average days under operation of the unit per week were 6.7 days. Consequently, the average days under operation of units was higher than that of the other reports, but the average number of scanning was lower. 4. The cases referred from other institutes to hospitals were 6.4% of total cases. 5. As a site of scanning, the brain appeared most frequently with 71.2% of the total cases and followed by spine 12.4%, abdomen 8.5%, and thorax 3.6%, respectively. 6. Positive rate by scanning was 70.8% of total cases, and it was 98.9% with thorax, abdomen 96.3%, spine 93.1%, and brain 38.4%, respectively. According to the results of this study, it is highly recommended that the regulations and the guidelines for setting-up of such high cost medical equipments as CT units be provided in order to ensure the cost-effectiveness of the system.

  • PDF

A New Moving Mobile Base Station (MMBS) Scheme for Low Power RMIMS Wireless System (PARTI: MMBS general issues, clystering and signalling Procedures) (저전력 RMIMS 무선 터미널을 위한 새로운 움직이는 이동 기지국 시스템 구조 (1부 : MMBS 일반사항, 클러스터링 및 신호절차))

  • 박수열;고윤호;유상조;김성대
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.24 no.12B
    • /
    • pp.2298-2319
    • /
    • 1999
  • In this paper, we propose a new moving mobile base station (MMBS) scheme for very low power and micro-size RMIMS (radio-interfaced micro information monitoring system) terminals. RMIMS terminals can be used in various application service areas such as pollution monitoring, environment surveillance, traffic monitoring, emergency monitoring (e.g., building, bridge, railroad breakdown), security monitoring (e.g., theft, alarm) and military application. For these applications based on wireless transmission technologies, sensor type RMIMS terminals must satisfy low cost and low power design (e.g., solar power, life limited battery) requirement. In RMIMS terminal design, this low power requirement limits transmission range of uplink or reverse link and means small cell size. Also these applications using RMIMS terminals may have a little bit non real-time traffic characteristic and low scattering density in service area.

  • PDF

A Case Report of Maxillary Complete Edentulous Patient with a Class III Jaw Relations (III급 악골 관계를 가진 상악 편악 무치악 환자의 수복)

  • Park, Mi-hee;Hong, Jun-won;Choi, Jee-ha;Lee, Jung-jun;Park, Ju-mi;Song, Kwang-yeob;Ahn, Seung-geun
    • Journal of Dental Rehabilitation and Applied Science
    • /
    • v.25 no.4
    • /
    • pp.431-436
    • /
    • 2009
  • In a case of class III skeletal patients with severe alveolar bone resorption, it must be a complete denture treatment plan provided stable and durable occlusion. Despite a markedly increased tooth mobility and unfavorable crown-to-root ration due to periodontal tissue breakdown, if the inflammatory process is controlled and an adequate oral hygiene performed, fixed splints will be considered. Patient's discomfort will be eliminated by achievement better clinical tooth mobility using fixed splints. So it can be a cost and time effective treatment option. In this case, it used a T-Scan System for confirmation a bilateral balanced occlusion and a occlusal force distribution reflected a patient's functional mandibular movement.

A Study on the Classification System of National Construction Project based on WBS (WBS 기반의 국책 건설사업 기록물 분류체계에 대한 연구)

  • Jeong, Ki-Ae;Jung, Kuk-Hwan;Kim, Chang-Ha
    • Journal of Information Management
    • /
    • v.41 no.1
    • /
    • pp.173-200
    • /
    • 2010
  • National construction project for SOC(Social Overhead Capital) is led by the government and invested high cost and all capabilities for long times. In general case the life times of SOC facilities are permanently. According to the long life time of the facilities documents and records of national projects are also retained permanently. Consistent classification systems are required to operation and maintenance of the facilities efficiently and to support the organic co-works for several Stakeholders. Therefore the classification of national construction projects are based on WBS of the project. WBS is the hierarchy structure that established and developed in project management project management methodology to produce deliverables of the projects. As a result, this study provides a prospect of project records classification systems in the 21st Century.

Technology Development of Entry-Level MiC Smart Photovoltaic System based on SOC (SoC 기반 보급형 MiC 스마트 태양광발전시스템 기술개발)

  • Yoon, Yongho
    • The Journal of the Institute of Internet, Broadcasting and Communication
    • /
    • v.20 no.3
    • /
    • pp.129-134
    • /
    • 2020
  • Moisture infiltration inside the solar cell module, filling of EVA sheet, melting of the frame seal, and deterioration of power generation performance in the module one year after installation are occurring. Whitening phenomenon, electrode corrosion phenomenon, and dielectric breakdown phenomenon are appearing in solar cell module installed in Korea before 5-7 years, leading to deterioration of power generation performance, and big problems for long-term reliability and long life technology are emerging. Therefore, in order to solve these problems, the development of a micro inverter (MiCrco Inverter Converter, MiC) including the function of securing the durability of the solar cell module and monitoring the aging progress and the solar cell based on the monitoring data from the MiC smart monitoring programs have been proposed to determine the aging of modules. In addition, in order to become a highly efficient solar smart monitoring system through systematic operation management through IT convergence with MiC that has enhanced monitoring function of solar cell module, SoC(System On Chip) in micro inverter is the environment for solar cell module. There is a demand for functions that can detect information in a complex manner and perform communication and control when necessary. Based on these requirements, this paper aims to develop SoC-based low-cost MiC smart photovoltaic system technology.

An Analysis of a Request for the Development of Computer Application Technology in an Architectural Construction Management System (건축공정 관리시스템의 전산적용 최적화를 위한 시스템 개발 요구 분석)

  • Kwon, Choon-An;Ji, Suk-Won
    • Journal of the Korea Institute of Building Construction
    • /
    • v.11 no.6
    • /
    • pp.567-575
    • /
    • 2011
  • With the development of construction information, a computerization tool for architectural process control is a necessary tool. However, the reality is that the conditions and understanding of users are not sufficient to fully utilize such a tool. In particular, it was analyzed that the reason for the negative feedback from hands-on workers regarding the current process control information system is that there is a difficulty in accessing the system for users that are not process and planning experts, due to a lack of information and technical contents at the phase of control and planning prior to the process plan. Therefore, the demands of users and a direction for the improvement of a system in terms of optimizing process control computerization were investigated, with the aim of addressing the disadvantages of the existing system and developing a professional system that is specialized in the construction industry. Therefore, it is necessary to construct an integrated WBS (IWBS) that combines WBS with CBS, and subsequently, it is judged that the most important aspect is the integrated technology of compatibility and operation of data that is linked with OBS. The process information must then deal with the changing information; in other words, the amount of construction, construction cost, and the required construction period etc., by coding data into a 4-unit index, such as a project unit (WBS Level 1), a project facility unit (WBS Level 2), a management department unit (OBS Level 1), and a control manager unit (OBS Level 2). After that, it was found that it is necessary to develop a computer system to consistently integrate process information into a management department.

Development of Integrated Cost and Schedule Management System using Work Package Concept for Efficient Project Management (Work package 개념을 활용한 현장의 공정관리와 공사비 통합관리 효율화 방안)

  • Kim, Yongpyo;Lee, Yongjun;Lee, Minjae
    • Korean Journal of Construction Engineering and Management
    • /
    • v.18 no.5
    • /
    • pp.32-40
    • /
    • 2017
  • Korean construction industry is facing downtime mood and need more productivity. In order to successfully accomplish the construction project with more productivity, systematic and reasonable schedule management techniques should be developed and utilized. Therefore, in this study, first, a current status of the schedule management in the construction site is identified and the improvements in the schedule management are suggested. And, the effective schedule management technique in the construction site is proposed based on the in-site experience of the researcher. In order to find solutions, survey questionnaires designed to measure the understanding of process management and measure perception of the importance of schedule management. Total twenty nine field engineers who are performing schedule management of construction project at domestic civil engineering construction site were participated in the survey, and In-depth interviews were conducted. Eleven construction sites are inspected. Finally, a simple and effective schedule management technique including from WSB classification to schedule analysis, performance management, and performance improvement is proposed based on the inspection of current status of schedule management in civil engineering construction site.