• Title/Summary/Keyword: contractor

Search Result 538, Processing Time 0.029 seconds

Application of Automated Measuring System for the Underground Construction in Urban Area (도심지 근접시공의 자동계측응용)

  • 남순성;정상용
    • Explosives and Blasting
    • /
    • v.15 no.2
    • /
    • pp.53-72
    • /
    • 1997
  • It is impossible to precat the behavior of ground soil and structure accurately during underground construction in urban area or excavation in soft ground area because of difference between the assumed design condition and the actual site condition. Therefore, it must be managed by measuring system and correct the difference by real data. Large scale under ground construction in urban area like a seoul subway project has needed for Intelligent Construction technique, a field of the Engineering Contractor. The automated measuring system is developed for the technique. It is described that the procedure and the method of measuring work with application of the automated measuring system.

  • PDF

Implementation of CITIS for CALS (효율적인 CITIS 시스템의 구현)

  • 한태창;서범수;조장혁
    • Proceedings of the CALSEC Conference
    • /
    • 1999.07b
    • /
    • pp.501-508
    • /
    • 1999
  • In this paper, we discuss about the implementation of CITIS(Contractor Integrated Technical Information Service) which is information infrastructure for CALS. CALS concept is introduced by DoD(Department of Defense, US) to exchange technical data of product's life cycle electronically. This CALS concept is accepted by commercial industrial area and considered as a part of global concept of Electronic Commerce. CITIS- a service defined by MIL-STD-974- is about to be implemented by commercial industrial society, too. But, until now there is a few sites implementing CITIS and especially in Korea. In this paper, we discuss characteristics of some CALS/CITIS implementation and solutions, and introduce ETRI-CITIS.

  • PDF

Quality Management of Exposed Concrete at Construction Phase (시공단계 노출 콘크리트 품질관리 방안)

  • Kim, Tae-Hoon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2016.05a
    • /
    • pp.164-165
    • /
    • 2016
  • To express the original texture of the concrete, exposed concrete finishing technique has been applied in many buildings. However, it is likely to cause quality problems after construction is completed. In addition, because of costs and time issues, reconstruction and maintenance works are difficult and ineffective. Therefore, step-by-step proactive quality management based on sufficient consensus among participants(client, designer, contractor) is very importatnt. This study analyzed factors causing low quality exposed concrete and quality contol points applied to 'A' headquarter construction project.

  • PDF

Database Program for Managing Management Resources: General Contractor's Perspectives

  • Yong-Woo Kim;Sungwon Shin
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1100-1106
    • /
    • 2009
  • General contractors' overhead costs are increasing relative to direct costs. However, it is difficult to apply the traditional activity-based costing directly to the construction site overhead costing because the resource consumption rate per each activity is varied depending on the attributes of activities. The research develops a methodology of hybrid cost allocation system when resources are assigned to cost objects unlike the traditional activity-based costing. The study also develops a database program and demonstrates how it can be applied to the construction projects using a case study.

  • PDF

Atlantis The Royal The Palm, UAE

  • Veall, Andy;Shleykov, Ilya;Rahimian, Ahmad;Moazami, Kamran
    • International Journal of High-Rise Buildings
    • /
    • v.11 no.1
    • /
    • pp.51-59
    • /
    • 2022
  • The 43 story, 178m tall Atlantis The Royal Resort and Residences tower nearing completion on the Palm in Dubai is a unique project in terms of its overall scale, geometry and form. The tower superstructure has a long narrow curved floor plan, measuring 400m in length above the podium with significant long span bridge structures forming voids and cantilevered blocks. This paper describes the innovative structural design solutions adopted and the construction solutions adopted by the Contractor to realize the Architectural vision.

Analysis on Construction Clients' Role for Safety and Health Management in Plan, Design, and Construction Stage (건설공사 발주자의 계획, 설계, 공사단계 안전보건관리 역할 분석)

  • Lim, Se Jong;Jeong, Seong-choon;Na, Ye Ji;Won, Jeong-Hun
    • Journal of the Korean Society of Safety
    • /
    • v.35 no.3
    • /
    • pp.24-31
    • /
    • 2020
  • The duty of construction clients in WSH (Workplace Safety and Health) system was included in the amendment of Occupational Safety and Health Act (enforced on 16 January 2020), which was estimated the shift of paradigm in the prevention of construction accidents. The purpose of this paper is to introduce the analysis results of construction clients' role in the construction project, which were performed by authors over the recent years in order to impose the duty on construction clients, and to suggest their role according the plan, design, and construction stage. Utilizing the systematic literature review process based on Meta analysis, the related papers were selected. For the selected papers, related domestic and foreign regulations, and other prominent report, the construction clients' role was analyzed by reflecting the experts' advice. Results show that the construction clients should control the designer and contractor for implementing the WHS system during the whole process of the construction project. They should supply sufficient source and time to ensure the workers' safety. In the plan stage, the key role of construction clients is to identify intensively controlled hazard and risk reduction plan and to transfer the results. In the design stage, their key role is to select the designer with the capacity in WSH and to assist the designer for the safety design. The main key role of construction clients in the costruction stage is to select the contractor with specialty in WSH including a contract reflecting the WSH requirement and to check implementation of WSH plan, WSH cost, WSH education, and accident report. In addition, it is thought that the construction clients' participations in the site WSH activity and adjustment of safety and health problem among contractors can be effect in the prevention of construction accidents.

The Analysis of Current Daily-Report System and The Proposal of Improvement Framework (작업일보 현황 분석에 따른 개선방향 제시)

  • Kim Bong-nyoun;Kim Chang-Duk;Ee Hyun-Soo;Kim Sun-Kuk;Seo Sang-Wook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.4 no.2 s.14
    • /
    • pp.66-73
    • /
    • 2003
  • Building construction projects are performed by a number of sub-contractors specialized in diverse trades. Therefore information management among these constituents is quite challenging especially due to exponentially increasing manpower and material resources. In recognition of the importance of information management in project sites a number of systems have been suggested, but the application is limited one of the main reason is that general contractors use these systems and sub-contractor's participation understanding and financial ability are limited. Besides other problems such as loss along communication channel, distortion of information due to inefficient input device and tremendous amount of time and labor are required for collection analysis, and management of information to prepare a daily-report. Therefore the Purpose of this study is to improve reporting process through analyzing current daily reporting system. This paper also suggests the direction of the improved daily reporting system to enhance the performance of construction projects through incorporating sub-contractor's participation in daily reporting system.

Construction Partnering on Alternative Project Delivery Methods: A Case Study of Construction Manager/General Contractor Partnered Transportation Projects

  • Adamtey, Simon A.;Kereri, James O.
    • Journal of Construction Engineering and Project Management
    • /
    • v.9 no.4
    • /
    • pp.1-15
    • /
    • 2019
  • Since its adoption by the transportation sector in the early 1990s, partnering has been broadly used with the traditional delivery method by many agencies with significant reported benefits. During the same era, a number of transportation agencies (DOTs) started experimenting with a wide variety of alternative project delivery methods (APDMs) aimed at improving the delivery of highway construction projects. The effect of collaborative working strategies such as partnering, together with the APDMs have become somehow interrelated posing a potential challenge on how to effectively integrate partnering as a concept in the APDMs. The salient question has been if the collaborative nature of these APDMs has affected how partnering is being used by state DOTs. Through an extensive literature review, analysis of 32 CMGC RFPs/RFQs and review of three CMGC case studies, the study found that there is limited information in state DOT documents that show procedures on the usage of partnering with CMGC projects. Majority of DOTs are relying on the inherent nature of the CMGC contract to promote healthy collaborative practices and there is the need to consider partnering during preconstruction and construction separately to cater for any personnel change over. The study also revealed that partnering may become less important at the construction phase due to overlap between partnering and CMGC practices. In support of this finding, a CMGC partnering model was developed that can be adopted by DOTs. This paper contributes to both research and practice by expanding the existing knowledge on partnering on APDMs.

Diligence and Indolence Management System for Specialty Contractor on Construction Site -Using GPS of Smart Phone- (스마트 폰의 위성항법시스템(GPS)를 활용한 전문건설업체 현장 근태관리 체계 구축)

  • Ahn, Chi-Sun;Yoon, Su-Won;Chin, Sang-Yoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.3
    • /
    • pp.56-66
    • /
    • 2012
  • The Recent Specialty Contractor in construction of the reduced quantity due to the recession, but competitive in order to increase the number of companies that are increasingly competitive. The field work of one person to perform the work of employees and multiple sites, workforce supply flow that occurs at each stage of information transfer is not made a late staffing. Therefore this research has proposed a new alternative that can overcome them and the entire industry in recent issue smart phone features that take advantage of GPS(Global Positioning System). This paper presents a Diligence and Indolence Management System using GPS of smart phone. offering the advantage of Web-based PMIS(Project Management Information System) through integration with real-time information transfer and smart phone applications for query by building a prototype of a professional construction company as their own on-site management measures are proposed to contribute time and attendance.

A Plan for Better Productivity of Sub-Contractors through Improvements of Daily Reporting Process (작업일보 작성프로세스 개선을 통한 협력업체 생산성 향상방안에 관한 연구)

  • Kim Bong-Nyoun;Kim Chang-Duk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.375-378
    • /
    • 2002
  • Most construction works in a building site are progressed by many work categories and sub-contractors. Therefore there are many difficult things of management of construction-information because variable occurrences are happened to manpower and material resources. For this reason, various management systems are suggested, but the application of these systems are difficult because only construction company manages these systems and sub-contractor's participation, understanding and financial ability are insufficient. In addition to that, there are other problems such as lost information when it is carried, perversion and distrust of information by hand and lots of time and labor are necessary for collection, analysis, and management of information which are offered for daily report. so the purpose of this study is for improvement of reporting process with making an analysis of productivity effects and an analysis of function and problem of daily report. I intend to suggest the direction of improved daily report system for better productivity of construction work through input information and management of cooperation enterprises.

  • PDF