• Title/Summary/Keyword: contract method

Search Result 532, Processing Time 0.027 seconds

A Legal study on the Internet Electronic Commerce Contract (인터넷 전자상거래계약(電子商去來契約)에 관한 법적(法的) 고찰(考察))

  • Han, Sung-Il
    • THE INTERNATIONAL COMMERCE & LAW REVIEW
    • /
    • v.14
    • /
    • pp.397-426
    • /
    • 2000
  • Since the internet is open to public in 1990, electronic commerce(EC) user has increase rapidly. Now EC is considered not only as communication method but also as new economical activities. EC is a kind of new commerce model which uses electronic means. And EC has global characteristics so that many country's legislation which regulates it differently makes an obstacle to vital of EC. The purpose of this study is to examine legal problems of internet electronic commerce. First, there are some legal problems whether electronic document has same legal function like traditional documents. Second, electronic signature must has authenticity, integrity, non-repudiation, writing and confidentiality in order to use looks like common signature. Finally, electronic contract is concluded on principle of mutual agreement. It is apparent that the concept of arrival is applied to the date and place in conclusion of electronic contract.

  • PDF

An Empirical Study on the Importance of IT Governance Commitment in IT Service Management for Outsourcing Performance (아웃소싱 성과를 위한 IT 서비스 관리에서 IT 거버넌스 커미트먼트의 중요성에 대한 연구)

  • Lee, Jong Man;Koo, Chulmo;Nam, Ki-Chan
    • Knowledge Management Research
    • /
    • v.11 no.3
    • /
    • pp.31-45
    • /
    • 2010
  • IT outsourcing studies have centered on the separate effect of formal contract and relational trust on IT outsourcing performance. In addition, previous studies ignored the importance of the relational capability that combine the formal contract and partnership can be able to deliver IT outsourcing effects. In this paper, we propose an IT governance commitment as a mediated role between relational capability and IT outsourcing performance. We collected data from 143 client companies of IT outsourcing and analyzed it using the PLS method. Our findings are revealed as following: At first, relational capability significantly and directly influence IT governance commitment as well as indirectly through formal contract and partnership. Secondly, IT governance commitment mediate between relational capability and IT outsourcing effect, and in turn affect IT outsourcing performance. The results and implications are further discussed.

  • PDF

An Empirical Study on Contract Model for IT Outsourcing Application Operation (IT 아웃소싱 어플리케이션 운영 계약모델에 대한 실증적 연구)

  • Kim, Heungshik;Park, Soah
    • Journal of Information Technology Services
    • /
    • v.16 no.2
    • /
    • pp.45-60
    • /
    • 2017
  • The study suggests a contract model of application operation through case study of A bank's IT outsourcing application contract based on workload. The IT outsourcing order form has a problem in that the scope of work is ambiguous due to the integration of operation and maintenance. In this study, application operation and maintenance were separated by referring to application operation history provided in ISO/IEC15504-5 standard. The scope of the IT outsourcing service was clarified by organizing the definition and detail activities of the application operation business. Application operation contract method has generally applied estimation method by the number of input manpower and period by agreement between buyer and client. As there is no activity to calculate the number of input manpower based on the operational work history and based on the standard workload per activity. In this case is not guaranteed due to the simple agreement between the contractors. In this paper, we propose an application operating cost estimation model that measures the size of the operating software using function point analysis that is the basis of application operation tasks. In order to verify the validity of the application operation cost model, we verified the correlation between the application size and the labor cost through regression analysis using SPSS.

A Study on the Escalation Method for Contract Adjustment Public Construction Project (물가변동에 따른 계약금액 조정방식의 지수조정율 산출에 관한 연구)

  • Bae Kyoung-Tae;Choi Dong-Soo;Hwang Chi Won
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2005.11a
    • /
    • pp.117-120
    • /
    • 2005
  • The business market of architecture has got a system that controls a deposit according to the price function. This system is written on a law of contract about countries. So the main body of construction has to make a reasonable contract. This study is written about a rate of numerical index on controling a deposit. We tried to fine problems and solutions of labor expenses, instrument costs and material costs which is so big and changable on the construction market Labor expenses are expressed according to the rate of construction scale between direct and indirect cost that applies ability of works. Instrument costs are expressed according to an output method of a unit price annually and a weight allowance of local instrument conditions and use frequence. The last material costs expressed according to a local weight allowance make a decision of the material cost index. They applies locally relative index more than absolute one on what uses the price rate of producers and importations. This solutions are not enough to apply to the real market, so it needs to exam and to be on the market after a feasibility study.

  • PDF

Improvement of contract sum adjustment method caused by price fluctuation using construction cost index (건설공사비지수를 활용한 물가변동에 의한 계약금액 조정방안 개선)

  • Cho Hun-Hee;Doe Geun-Young
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.1 s.23
    • /
    • pp.162-168
    • /
    • 2005
  • Index adjusted ratio method has been widely utilized in public construction sector for contract sum adjustment by price fluctuation. In this method, the Production Price Index are used for the base ratio, but the PPI can't reflect the character of construction project in respect of the selected items and weight. In this research we prove the problem of using the index adjusted ration method in contact sum adjustment by price fluctuation, and improve it by using the construction cost index, which has the property of construction project. And we figure out the efficiency of the proposed method by case study.

Multi-Area Unit Commitment with Bilateral Contract Approach in Deregulated Electricity Market

  • Selvi, S.Chitra;Devi, R.P.Kumudini;Rajan, C.Christober Asir
    • Journal of Electrical Engineering and Technology
    • /
    • v.4 no.3
    • /
    • pp.346-352
    • /
    • 2009
  • The eventual goal of this paper is to help the generating companies and load-serving entities to choose appropriate relative levels of interconnected system versus bilateral trades while considering risk, and economic performance. In competitive power markets, electricity prices are determined by balance between demand and supply in electric power exchanges or bilateral contracts. The problem formulation is bilateral contract incorporated into Multi-area unit commitment with import/export and tie-line constraints. This proposed method considers maximizing own profit or minimize the operating cost among the generating companies in multi-area system. The feasibility of the proposed algorithm has been demonstrated using IEEE system with four areas and experimental results shows that proposed method is reliable, fast and computationally efficient

A Comparative Legal Study on the Effect of the Increase of Risk in Marine Insurance (해상보검에 있어서 항검증가의 교과에 관한 비교법적 고찰)

  • 김경식
    • Journal of the Korean Institute of Navigation
    • /
    • v.18 no.2
    • /
    • pp.111-127
    • /
    • 1994
  • A Contract of marine insurance is a contract whereby the insurer undertakes to indemnity the assurd, in manner and to the extent thereby agreed, against marine losses that is to say, the losses incident to marine adventure. But the matter is that whether the problem of increased risk in insurance law should be understood by matching to nay state under general principle of contract law and whether that we should give any effect is more proper to the original object of the system. For this, it is understood that it is a case to be applied a "clausula rebus sic stantibus" in general today, but it is regarded as the matter that whether "clausula rebus sic stantibs" is charging any position in change of risk and whether we should understood the concept of the risk on the substance of the risk. Accordingly the recognition for the problem like this, study should examine closely into whether any system for the effect of increase in change of risk is more proper and rational system provide the supplementing points through our principle of insurance law and the study by comparing method.by comparing method.

  • PDF

Review of PNF stretching method (PNF 신장 방법에 관한 고찰)

  • Lee, Hyun-Ok;Shin, Jae-Wook
    • PNF and Movement
    • /
    • v.7 no.4
    • /
    • pp.1-7
    • /
    • 2009
  • Purpose : This paper reviews on the method of PNF stretching. Methods : This is literature study with Pubmed, medline, SPORT Discus, EBSCO, ProQuest and books. Results : PNF stretching is effective for increasing range of motion than static and ballistic stretching. CR(contract-relax) technique is effective and CRAC(contract-relax with agonist contraction) technique including agonist contraction is more effective. A minimum of one repetition, twice or three times per week is required for range of motion gains, needs to be conducted continueously. A minimum of 20% contraction intensity and more than 3 seconds contraction duration are needed to increase range of motion. Inclusion of static stretching of antagonist and agonist contraction is more effective. Conclusions : PNF stretching is more effective for increasing range of motion than other stretching methods, but, clinicians need to select proper techniques according to subjects and muscles, and conduct carefully when applying technique.

  • PDF

A Study on Performance Analyses of Korea's Bidding and Contract Systems for Public Construction Projects

  • Beak, Seung-Ho;Kang, Tai-Kyung;Park, Wonyoung;Lee, Yoo-Sub
    • Journal of Construction Engineering and Project Management
    • /
    • v.5 no.3
    • /
    • pp.18-28
    • /
    • 2015
  • Bidding and contract systems are used for public construction projects to select contractors following fair competition principles and to execute national budgets effectively. Many challenges have arisen due to a lack of transparency and fairness and because bidding practices have been luck-based. Few comprehensive or comparative analyses have been conducted on the performance and limitations of bidding and contract systems, and empirical analyses designed to improve policies on and the practice of such systems are lacking. This study empirically analyzed current bidding and contract systems to seek ways of improving them. The study proposes several alternatives to resolve the problems with and irrationalities of the current system: 1) improving bidding and selection systems by changing them from a luck-based price competition into a technical merit- and value-based competition; 2) improving the assessment criteria to meet the current market level of bid and winning prices; 3) adjusting contractual responsibilities and sharing structures to meet the current trend; and 4) strengthening the competitiveness and expanding the social responsibility-based procurement systems of construction companies.

Developing Educational System based on S-OJT in Contract Based Department using DACUM: Case of Software Development and Materialization Occupational Group (DACUM을 활용한 S-OJT 기반의 계약학과 교육체계 개발 : 소프트웨어 개발 및 구현 직군을 중심으로)

  • Lee, Chan;Choi, Young-Jun;Jung, Bo-Young
    • The Journal of Korean Institute for Practical Engineering Education
    • /
    • v.5 no.1
    • /
    • pp.58-65
    • /
    • 2013
  • The purpose of this study was to develop field-centered educational system in contract based department using DACUM for occupational group in software development and materialization area. Job model for contract based department was developed and both educational need and appropriate educational method was investigated and analyzed. Then, knowledge, skill and attitude were elicited and categorized. Subjects for S-OJT were organized and hierarchy of subjects was constructed according to career path set by job experts. Then, educational system in contract based department for software development and materialization was developed by connecting developed subjects with former curriculum. Based on this result the directions for the future studies was discussed.

  • PDF