• Title/Summary/Keyword: construction-cost-calculation

Search Result 237, Processing Time 0.032 seconds

Development of Economic Analysis Indicators and Case Scenario Analysis for Decision-making support for Off-Site Construction Utilization of Apartment Houses (OSC 활용 의사결정 지원을 위한 경제성 분석 지표 개발 및 사례 시나리오 분석 - 공동주택 PC공법을 중심으로 -)

  • Yun, Won-Gun;Bae, Byung-Yun;Shin, Eun-Young;Kang, Tai-Kyung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.24 no.6
    • /
    • pp.24-35
    • /
    • 2023
  • Recently, the Ministry of Land, Infrastructure and Transport presented the '6th Construction Technology Promotion Basic Plan' and 'Smart Construction Revitalization Plan (2022.7.20)'. Off-Site Construction (OSC), which involves construction and production of PC (Precast Concrete) and Modular, etc., has advantages in shortening the construction period, reducing costs, improving quality, reducing construction waste, and reducing safety accidents. However, the construction cost is high compared to the traditional RC construction method, which has hindered its utilization and spread. In this study, OSC utilization was improved. An economic analysis indicator and methodology that can support decision-making in the planning and design stages for multi-unit housing were proposed. The factors used in the economic analysis of OSC (based on the PC method) of apartment houses were reviewed. As for the indicators used in the cost and benefit section, 'Construction Period', 'Disaster Occurrence', 'Waste Generation', and 'Greenhouse gas Emission', which reflect the technical advantages of OSC, were derived. In addition, a scenario analysis was conducted based on actual apartment housing case data for the presented economic analysis indicators and benefit calculation standards. The level of benefit that offsets the difference between the existing RC construction method and the construction cost was reviewed. In future studies, it will be necessary to conduct additional case studies to apply the measurement criteria for detailed indicators and supplement the benefit indicators.

Developing an Automatic System for Making a Placing Drawing and Quantity taking-off Cut and Bent Re Bar with Work Zone Information (설치 위치 정보를 포함한 배근시공상세도 작성 및 가공철근 자동 물량산출 시스템 개발)

  • Park, Hyeon-Yong;Lee, Seung-Hyun;Kang, Tai-Kyoung;Lee, Yoo-Sub
    • Journal of the Korea Institute of Building Construction
    • /
    • v.8 no.2
    • /
    • pp.63-70
    • /
    • 2008
  • Reinforcing steel work plays an important role in terms of its structural performance or weight of construction cost for reinforced concrete structures. Precise estimation of re-bar quantity gives a basis for managing the reinforcing steel work effectively. However, the estimation process is still performed ineffectively based upon the expert's experience or manpower in spite of the advanced technology or improvement efforts. Therefore, the purpose of this research is to develop a prototype system for taking-off the quantity of reinforcing steel bars quickly and accurately in an order consistent with the specific members identified on the drawings. An estimate algorithm considering the connection, settlement and coating thickness of re-bars was suggested regarding to their replacement conditions which places more emphasis on constructibility. Also, this system produces the shop drawings automatically with the calculation results with work zone information.

Exploring Capabilities of BIM Tools for Housing Refurbishment in the UK

  • Kim, Ki Pyung;Park, Kenneth S
    • Journal of KIBIM
    • /
    • v.6 no.4
    • /
    • pp.9-17
    • /
    • 2016
  • Currently whole-house refurbishment for substantial energy efficiency improvement of existing housing stock is needed to achieve the targeted 80% CO2 emission reduction. As whole-house refurbishment requires a larger capital investment for lower CO2 emission, the simultaneous use of Life Cycle Costing (LCC) and Life Cycle Assessment (LCA) methodologies are recommended to generate affordable refurbishment solutions. However, two methodologies are difficult to use due to a lack of proper LCC and LCA datasets. As a response to the current problems, many researchers explore potentials in Building Information Modelling (BIM) to improve current construction practice. As a result, a BIM tool - IES IMPACT (Integrated Material Profile And Costing Tool) - has been introduced to the UK construction industry for simultaneous calculation of LCC and LCA. Thus, this research aims at examining the capability and limitation of the IES VE/IMPACT as a BIM tool for whole-house refurbishment. This research reveals that the IES VE/IMPACT is feasible for whole-house refurbishment by providing LCC and LCA information simultaneously for informed decision on refurbishment solution selection. This research shed lights on the current problems lying on the data exchange between two different BIM tools. It is revealed that additional efforts from construction professionals and industry are required to make reliable BIM objects library with LCC and LCA datasets.

A Development of the LCC Analysis Program Package for Optimal Maintenance of HVAC Systems (공조설비 유지관리용 LCC 분석 패키지 개발)

  • Kim, Yong-Ki;Woo, Nam-Sub;Lee, Tae-Won
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • v.21 no.9
    • /
    • pp.513-518
    • /
    • 2009
  • The building HVAC systems generally have very different qualities of performance and durability with the superintendent's interest in or capability of management and maintenance of them. The poor management of these systems finally lead to the shortening of the life expectancy and result in the increase of operating cost and energy consumption due to their low efficiencies. So it is necessary to develop tools to maintain adequately and to operate efficiently various building service equipments in order to cope with actively the global environment problems and energy crises. In this study the LCC based calculation program and package were developed, which could be used for analyses of the economic performance and determination of the reasonable maintenance time and methods of building HVAC systems.

A Study on the Improving the Accuracy of Cost Estimating through Analyzing Influence Factors in Apartment (공동주택 공사비 영향요인 분석을 통한 개산견적의 정확성 향상방안 연구)

  • Yun, Ji-Yeong;Jeong, Kyeong-Tae;Lee, Dong-Hoon
    • Journal of the Korea Institute of Building Construction
    • /
    • v.20 no.2
    • /
    • pp.183-190
    • /
    • 2020
  • Currently, the multi-unit houses are the largest in the ratio of housing types, and the number of households in multi-unit houses is steadily increasing. As the multi-family housing project continues, the accuracy of estimates for decision-making and feasibility assessment are required in the early stages of the project. Therefore, this study selected the influential factors affecting the estimated estimate and showed the relative importance of each factor through weight analysis and suggested the method of calculating the estimated estimate to improve the accuracy. The calculation plan presented through this study will be used as a useful data for project feasibility review and is expected to make a great contribution in preventing the economic loss of the client.

Definition of Environmental Cost and Eco-VE Model for Eco-VE of Construction Facility (건설시설물 친환경 VE를 위한 환경비용 및 친환경가치모델 정립)

  • Kim, Myung-Jin;Kim, Joon-Soo;Kim, Byung-Soo
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.36 no.5
    • /
    • pp.903-913
    • /
    • 2016
  • Paris Agreement of Climate Change seem affect to Korea eco-policy. Meanwhile the eco-design for reduce carbon emission have been applied in design phase of construction. However eco-design have applied passively except the project of eco-building system. For reflect eco-component in design, design VE that be appling to basic design and executing design phase of all construction project of over 10 billion should be use. But present applying VE Job Plan is reflecting partly eco-component, so the effect is small. Therefor new eco-VE development that reflect eco-elements to exist VE need. As the result of this study, the concept of environmental cost is defined to accounting. The calculation of the cost was using methods that apply $CO_2$ emission trading price, WTP, carbon productivity concept and carbon tax based on $CO_2$ emission. However, in order to apply eco-friendly VE at design phase, the model of new concept included carbon productivity concept is necessary. The eco-friendly VE model of new concept is model using $CO_2$ emission and potential environmental pollution index (PEPI). This study tried define eco-value model and environmental cost definition that become the major axle of eco-VE.

High-Performing Adhesive Bonding Fastening Technique For Automotive Body Structures

  • Symietz, Detlef;Lutz, Andreas
    • Journal of Adhesion and Interface
    • /
    • v.7 no.4
    • /
    • pp.60-64
    • /
    • 2006
  • In modern vehicle construction the search for means of weight reduction, improving durability, increasing comfort and raising body stiffness are issues of priority to the design engineer. The intelligent usage of many materials such as high strength steel, light-alloys and plastics enables a significant vehicle weight reduction to be achieved. The classical joining techniques used in the automobile industry need to be newly-evaluated since they often do not present workable solutions for such mixed-material connections, for example aluminium/steel. Calculation/simulation methods have made progress as a key factor for broader and more cost-effective implementation of structural bonding. This will lead to reduction of spotwelds and accelerate the car development. A special focus of the paper is the use of high strength steel grades. It will be shown that adhesive bonding is a key tool for yielding the potential of advanced high strength steel for low gauging without compromising the stiffness. The latest status of adhesive development has been described. Improvements with physical strength and glass temperature as well as of process relevant properties are shown. Also the situation regarding occupational hygiene is treated, showing that by further spotweld point reduction the emission around the working area can be even lowered against the current praxis. High performing lightweight design cannot longer do without high performing crash durable adhesives.

  • PDF

A Proposal on Calculation Model to Predict Environmental Noise Prediction Emitted by High Speed Trains (고속철도 환경소음예측을 위한 계산 모델 제안)

  • Cho, Dae-Seung;Cho, Jun-Ho;Kim, Jin-Hyeong;Jang, Kang-Seok;Yoon, Jae-Won
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 2011.10a
    • /
    • pp.843-848
    • /
    • 2011
  • Planning and construction of railway for high speed trains up to 400 km/h are recently driven in Korea. High speed train is one of the environment-friendly fastest mass transportation means but its noise generated by rolling, traction and aerodynamic mechanism can cause public complaints of residents nearby railways. To cost-effectively prevent the troublesome noise in a railway planning stage, the rational railway noise prediction method considering the characteristics of trains as well as railway structures should be required but it is difficult to find authentic methods for Korean high speed trains such as KTX and KTX-II. In this study, we propose a framework of our own railway noise prediction model emitted by Korean high speed trains over 250 km/h based on the recent research results carried out in EU countries. The model considers railway sound power level using several point sources distributed in heights as well as tracks, whose detail speed- and frequency-dependent emission characteristics of Korean high speed trains should be determined in near future by measurement or numerical analysis. The attenuation during propagation outdoors is calculated by the well-known ISO 9613-2 and auxiliary methods to consider undulated terrain and wind effect.

  • PDF

A New Environmentally Friendly Design Program TLCALC for High Voltage AC Transmission Lines (새로운 초고압 송전선로 친환경설계프로그램 TLCALC)

  • Yang, Kwang-Ho;Myung, Sung-Ho;Kil, Gyung-Suk;Hwang, Gi-Hyun;Lee, Dong-Il;Ju, Mun-No
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • v.55 no.4
    • /
    • pp.151-155
    • /
    • 2006
  • HVAC transmission lines must be designed to satisfy environmental regulations. Therefore it is necessary to pre-evaluate environmental problems for transmission line designer using prediction program. In this study, environmental design software, TLCALC(Transmission Line CALCulation) for transmission lines was developed as a comprehensive window program. It has 6 modules that are audible noise, radio noise, television noise, magnetic field, electric field and conductor surface gradient. TLCALC solved a few problems in use of the existing foreign tools and took several advantages as follows; (1) It is a common tool that solves calculating limitations of foreign formulas, (2) It has wide application ranges and enhances accuracy of prediction. (3) It can be applied to almost transmission line configurations in Korea. (4) Experienced designers can get the results of calculation within about 15 minutes. Because the use of TLCALC is easy and practical, this program will be usefully applied to the environmental friendly design and construction of transmission lines. In the future, it is expected that public complaints and social environmental cost will be reduced by the use of TLCALC.

Efficiency criteria for optimization of separation cascades for uranium enrichment

  • Sulaberidze, Georgy;Zeng, Shi;Smirnov, Andrey;Bonarev, Anton;Borisevich, Valentin;Jiang, Dongjun
    • Nuclear Engineering and Technology
    • /
    • v.50 no.1
    • /
    • pp.126-131
    • /
    • 2018
  • As it is known, uranium enrichment is carried out on industrial scale by means of multistage separation facilities, i.e., separation cascades in which gas centrifuges (GCs) are connected in series and parallel. Design and construction of these facilities require significant investment. So, the problem of calculation and optimization of cascade working parameters is still relevant today. At the same time, in many cases, the minimum unit cost of a product is related to the cascade having the smallest possible number of separation elements/GCs. Also, in theoretical studies, it is often acceptable to apply as an efficiency criterion the minimum total flow to supply cascade stages instead of the abovementioned minimum unit cost or the number of separation elements. In this article, cascades with working parameter of a single GC changing from stage to stage are optimized by two of the abovementioned performance criteria and are compared. The results obtained allow us to make a conclusion about their differences.