• Title/Summary/Keyword: construction standard unit price

Search Result 38, Processing Time 0.032 seconds

Ripple Effect Analysis of Construction Standard Unit Price in Public Construction (공공건설공사 표준시장단가 적용 파급효과 분석)

  • Jin, Zheng-Xun;Baek, Seung-Ho;Lee, Ju-Hyun
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.25 no.6_3
    • /
    • pp.1207-1219
    • /
    • 2022
  • 「Act On Contracts To Which The State Is A Party」 stipulates that the "Construction Standard Production Rate" and "Construction Standard Unit Price" be used as the criteria for determining the estimated price of construction works performed by public institutions. In this regard, issues such as the application scope of the Construction Standard Unit Price, and the effect of budget reduction continue. However, due to the lack of quantitative data on the actual application of Construction Standard Unit Price, it is difficult to objectively evaluate various issues. In order to prepare data for objective evaluation of the Construction Standard Unit Price, this study analyzed the ripple effect of applying the Construction Standard Unit Price based on the bill of quantity. As a result of the analysis, the Construction Standard Unit Price ripple effect in the civil engineering part was 9.2%, and it was analyzed that there was a ripple effect of about 1.9% based on the civil engineering direct cost. In the construction part, the ripple effect was analyzed to be relatively high at 17%, but it was found to have a ripple effect of about 3% in the construction direct cost. Based on the total direct cost, the ripple effect was calculated as 2.2%. Based on the analysis results, it is possible to evaluate the effect of applying the Standard Market Unit Price, and it is expected to be used as basic data to solve issues. As a future study, it is necessary to additionally analyze the ripple effect by Standard Market Unit Price application range (over 10 billion, over 20 billion won, etc.) and delivery system type (comprehensive evaluation, qualification examination, technical bidding, etc.). In addition, it is necessary to study the appropriate ripple effect of the Standard Market Unit Price.

Analysis of the Influence of Changing the Announcement Date of Standard for Construction Cost Estimation (표준시장단가 공고시기 조정에 따른 영향분석 연구)

  • Lee, Ju-hyun;Baek, Seung Ho
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2020.06a
    • /
    • pp.204-205
    • /
    • 2020
  • Construction Standard Unit Price is the unit price calculated based on the market price for work items in construction projects that have already been conducted. It is used as basic data for calculating the budget price of public construction projects. In the Construction Standard Unit Price Book implemented in the second half of 2020, there are 1,810 types of unit prices. Since 2017, 100-150 construction standard unit prices have been revised semiannually (on January 1 and July 1 of each year) through Construction Site Surveys. Other work items have been set based on the rate of inflation during the corresponding period. Later in 2020, this procedure was changed, with on-site survey period extended to one year to strengthen the construction standard unit price investigation. The revisions previous announced during the second half of the year were changed only to reflect the price inflation rates. With such changes in the revisions to construction standard unit prices, one important issue that was raised: The timing of announcing the revisions during the second half of the year (reflecting the price inflation rates). The market unit wage, which is the unit price standard of labor cost that takes up a large part of the construction cost, is announced in January and September. The figures announced in September is reflected on the construction standard unit price four months later in January, but the market unit wage announced in January is reflected only six months after in July, which causes a timing issue. As such, the current study analyzed problems rising from the changed timing of the announcements of the construction standard unit price during the second half of the year, in addition to analyzing their impact on public construction projects.

  • PDF

Basic Research for Construction Standard Unit Price and BIM library Linkage (표준시장단가 및 BIM 라이브러리 연계 활용에 관한 기초연구)

  • Jin, Zheng-xun;Baek, Seung-Ho
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.05a
    • /
    • pp.251-252
    • /
    • 2021
  • With the recent emergence of the 4th Industrial Revolution, the government is promoting the development of smart construction technology and institutional improvement through various policies to induce cutting-edge and technological innovation in the construction industry. As part of such smart construction technology, the application of BIM is being activated, and related regulations and guidelines are constantly being supplemented. In relation to BIM, there are many studies on the fields of library, design standards etc., but research on specific unit price utilization and unit price DB construction for calculating construction cost is insufficient. Therefore, in this study, a basic study was conducted on the linkage of the construction standard market unit price and the BIM library. Based on the basic research conducted in the future, we intend to establish specific standards for calculating BIM-based construction costs.

  • PDF

Study of a Online Survey System for Monitering of Construction Cost on Construction Site (건설현장 시장가격 모니터링을 위한 온라인 상시조사에 관한 기초연구)

  • Lee, Ju-hyun;Baek, Seung Ho
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2020.06a
    • /
    • pp.202-203
    • /
    • 2020
  • Unlike price calculation by cost accounting, which categorizes costs into material costs, labor costs, and miscellaneous expenses to determine the construction budget price, construction cost calculation based on Construction Standard Unit Prices utilizes unit prices extracted from market prices of items from projects already completed to estimate costs of similar construction projects. Although unit price information is collected through construction site surveys to revise these construction standard unit prices every year, but due to the limitations of the site survey method, it is difficult to quickly implement the rapid changes in the construction methods and market prices. As such, an important issue that arose was the identification of work items whose prices need urgent revision. This study conducted research on factors that need to be considered when developing online survey system for monitoring construction site market prices. This study is expected to enhance convenience for users, and provide an efficient data collection and management system for administrators.

  • PDF

A Study on the Revision of Construction Standard Unit Price for Interior Finishing Work and Carpentry Work (건설공사 표준시장단가의 수장공사 및 목공사 개정에 관한 연구)

  • Lee, Ju-hyun;Baek, Seung-ho
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.11a
    • /
    • pp.245-246
    • /
    • 2023
  • A construction site survey is carried out for the Construction Standard Unit Price(CSUP) in order to establish a standard for the appropriate estimated price. This paper proposed the revised plan by surveying the 56 sites under construction from March to October 2022 for interior finishing work and Carpentry work. It is expected that the revision of the CSUP for interior finishing work and Carpentry work will more accurately reflect the actual construction situation and contribute to improving the adequacy of the CSUP.

  • PDF

BIM-based Priority Activity in Construction Standard Unit Price (BIM기반 표준시장단가 우선적용 공종 분석)

  • Jin, Zheng-Xun;Baek, Seung-Ho
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2022.04a
    • /
    • pp.204-205
    • /
    • 2022
  • Recently, the application of BIM has been continuously expanded according to various government policies, and the application performance is being analyzed in BIM projects such as roads and railways. In line with this trend, the government is making additional efforts to introduce full-scale design BIM. The BIM design in the public sector is directly related to the estimated price. However, looking at the current status of BIM introduction, there is no support system in place for calculating the estimated price. Therefore, this study intends to analyze the priority activity that is easy to develop BIM unit price among the construction standard unit Price of construction work. In this study, in order to derive the BIM-based priority activity, BIM application statements and application guidelines were analyzed. As a result of the analysis, cast-in-place concrete construction (civil engineering) and reinforced concrete construction (architecture) were deduced as suitable construction activities for the preferential application of BIM. Since the results presented in this study are a rough analysis, it is judged that additional detailed analysis is necessary for the future.

  • PDF

A Study on the Revision of Construction Standard Unit Price for Concrete Pavement Works (콘크리트포장 시공실태 조사에 따른 표준시장단가 개정 연구)

  • Lee, Ju-hyun;Baek, Seung Ho
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2022.04a
    • /
    • pp.196-197
    • /
    • 2022
  • This study aims to come up with the revision of construction standard unit price for concrete pavement works to improve its applicability and availability by a construction site survey. Construction site survey was conducted from March to November 2021 with 36 construction sites. This results of the revision are expected to support to public construction project owner or estimator in construction cost estimation works.

  • PDF

Identification of Primary Activity and Management Plan for Construction Standard Unit Price (건설공사 표준시장단가 핵심공종 도출 및 중점관리방안)

  • Jin, Zheng-Xun;Baek, Seung-Ho
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.21 no.10
    • /
    • pp.589-601
    • /
    • 2020
  • The Construction Standard Unit Price (CSUP) sets the standard for calculating the estimated construction cost. The CSUP is used as basic data for preparing a standard price for public construction. Currently, the CSUP is calculated in consideration of the market and construction field conditions. However, a long-term management plan was established to prepare revised standards. As part of the plan, a field survey was conducted on changes in construction conditions and market prices. However, the plan continued for more than 5 years. Thus, the plan has a problem of difficulty continuously managing primary activities that have high importance and high price volatility. Therefore, to efficiently manage the CSUP, this study identifies the primary activities of the CSUP and presents a management plan. Through importance analysis and unit price volatility analysis, 242 primary activities in 35 activity groups were identified. Also, a management plan is presented based on the importance levels of activities. The primary activities and management plan could enable the timely revision of important activities. The results of this study provide a base for reflecting the appropriateness of construction cost criteria on time.

Comparative Study of Cost Estimate System in Landscape Architectural Construction - Comparison of Unit Price between Actual Construction Cost and Standard Quantity per Unit - (조경공사 적산방식의 비교연구 - 실적공사비와 표준품셈의 단가비교 -)

  • Jung, Un-Soo;Choi, Key-Soo
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.40 no.2
    • /
    • pp.97-111
    • /
    • 2012
  • This study aims to find a proper construction cost calculation method by comparing unit prices of cost estimate in landscape construction among other public ordering construction projects. There were 7 out of 12 items from the actual work cost in the first half of 2011 were compared. The 12 items were classified as landscape Architectural construction and the 7 items were the approximate standard. As applied construction types, the comparable 35 items out of the 80 actual work cost items applied to 5 sites were compared to the unit price of the standard quantity per unit in March 2011, which was the approximate standard. Actual construction rate of the 7 items in the category of landscape sector was 104.86% for each item and 92.09% as a total construction cost. The high actual construction rate was caused by the high rate of seed spray depending on the status of applying rocks. However, there were more fundamental reasons for the cost generated from aslope treatment for grass and seed spray. So, it requires more detailed regulations on the modification factors for each soil type, the standard and needs to improve theillogical standard quantity per unit system. Actual construction rate of the 35 items in the applied sectors of civil engineering and architecture was 78.65% for each item and 71.31% (70.17%) as a total construction cost. This shows that actual unit cost cannot reflect actual cost structurally and standard quantity per unit system lacks practicality in terms of construction due to thelabor force. 85.1~91.2 % actual construction rate announced by the Ministry of Land and Maritime Affairs referred to the newly switched items. So the result was estimated as actual construction rate. This requires supplementation after verification in order to make the actual work cost produce at a proper rate. Also, standard quantity per unit system needs complementation with these actual data and so on.

Spatiotemporal Visualization of Unit Price Data of Highway Projects

  • Jain, Deepanshi;Shrestha, K. Joseph;Jeong, H. David
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.77-81
    • /
    • 2015
  • The unit price contracting is the standard contracting method for highway projects in the U.S. As a result, state highway agencies have collected a large amount of historical bid data that they can use to determine engineer's estimates for future projects. The estimator must carefully consider various characteristics of a new project such as its location to determine an engineer's estimate as accurate as possible before bid letting. Higher cost estimates can result in the loss of the available budget and lower cost estimates may lead to deferral and delay of projects. The study uses the historical bid data obtained from Iowa Department of Transportation and develops a Geographic Information System (GIS) tool to visually show the variation of unit prices over the map using a spatial interpolation technique. The interpolation map can be used to estimate the unit price of the item at any location across Iowa. This noble method allows the estimator to effectively and fully utilize the historical bid data in a very time efficient manner and determine more accurate cost estimation.

  • PDF