「Act On Contracts To Which The State Is A Party」 stipulates that the "Construction Standard Production Rate" and "Construction Standard Unit Price" be used as the criteria for determining the estimated price of construction works performed by public institutions. In this regard, issues such as the application scope of the Construction Standard Unit Price, and the effect of budget reduction continue. However, due to the lack of quantitative data on the actual application of Construction Standard Unit Price, it is difficult to objectively evaluate various issues. In order to prepare data for objective evaluation of the Construction Standard Unit Price, this study analyzed the ripple effect of applying the Construction Standard Unit Price based on the bill of quantity. As a result of the analysis, the Construction Standard Unit Price ripple effect in the civil engineering part was 9.2%, and it was analyzed that there was a ripple effect of about 1.9% based on the civil engineering direct cost. In the construction part, the ripple effect was analyzed to be relatively high at 17%, but it was found to have a ripple effect of about 3% in the construction direct cost. Based on the total direct cost, the ripple effect was calculated as 2.2%. Based on the analysis results, it is possible to evaluate the effect of applying the Standard Market Unit Price, and it is expected to be used as basic data to solve issues. As a future study, it is necessary to additionally analyze the ripple effect by Standard Market Unit Price application range (over 10 billion, over 20 billion won, etc.) and delivery system type (comprehensive evaluation, qualification examination, technical bidding, etc.). In addition, it is necessary to study the appropriate ripple effect of the Standard Market Unit Price.
Construction Standard Unit Price is the unit price calculated based on the market price for work items in construction projects that have already been conducted. It is used as basic data for calculating the budget price of public construction projects. In the Construction Standard Unit Price Book implemented in the second half of 2020, there are 1,810 types of unit prices. Since 2017, 100-150 construction standard unit prices have been revised semiannually (on January 1 and July 1 of each year) through Construction Site Surveys. Other work items have been set based on the rate of inflation during the corresponding period. Later in 2020, this procedure was changed, with on-site survey period extended to one year to strengthen the construction standard unit price investigation. The revisions previous announced during the second half of the year were changed only to reflect the price inflation rates. With such changes in the revisions to construction standard unit prices, one important issue that was raised: The timing of announcing the revisions during the second half of the year (reflecting the price inflation rates). The market unit wage, which is the unit price standard of labor cost that takes up a large part of the construction cost, is announced in January and September. The figures announced in September is reflected on the construction standard unit price four months later in January, but the market unit wage announced in January is reflected only six months after in July, which causes a timing issue. As such, the current study analyzed problems rising from the changed timing of the announcements of the construction standard unit price during the second half of the year, in addition to analyzing their impact on public construction projects.
With the recent emergence of the 4th Industrial Revolution, the government is promoting the development of smart construction technology and institutional improvement through various policies to induce cutting-edge and technological innovation in the construction industry. As part of such smart construction technology, the application of BIM is being activated, and related regulations and guidelines are constantly being supplemented. In relation to BIM, there are many studies on the fields of library, design standards etc., but research on specific unit price utilization and unit price DB construction for calculating construction cost is insufficient. Therefore, in this study, a basic study was conducted on the linkage of the construction standard market unit price and the BIM library. Based on the basic research conducted in the future, we intend to establish specific standards for calculating BIM-based construction costs.
Unlike price calculation by cost accounting, which categorizes costs into material costs, labor costs, and miscellaneous expenses to determine the construction budget price, construction cost calculation based on Construction Standard Unit Prices utilizes unit prices extracted from market prices of items from projects already completed to estimate costs of similar construction projects. Although unit price information is collected through construction site surveys to revise these construction standard unit prices every year, but due to the limitations of the site survey method, it is difficult to quickly implement the rapid changes in the construction methods and market prices. As such, an important issue that arose was the identification of work items whose prices need urgent revision. This study conducted research on factors that need to be considered when developing online survey system for monitoring construction site market prices. This study is expected to enhance convenience for users, and provide an efficient data collection and management system for administrators.
A construction site survey is carried out for the Construction Standard Unit Price(CSUP) in order to establish a standard for the appropriate estimated price. This paper proposed the revised plan by surveying the 56 sites under construction from March to October 2022 for interior finishing work and Carpentry work. It is expected that the revision of the CSUP for interior finishing work and Carpentry work will more accurately reflect the actual construction situation and contribute to improving the adequacy of the CSUP.
Recently, the application of BIM has been continuously expanded according to various government policies, and the application performance is being analyzed in BIM projects such as roads and railways. In line with this trend, the government is making additional efforts to introduce full-scale design BIM. The BIM design in the public sector is directly related to the estimated price. However, looking at the current status of BIM introduction, there is no support system in place for calculating the estimated price. Therefore, this study intends to analyze the priority activity that is easy to develop BIM unit price among the construction standard unit Price of construction work. In this study, in order to derive the BIM-based priority activity, BIM application statements and application guidelines were analyzed. As a result of the analysis, cast-in-place concrete construction (civil engineering) and reinforced concrete construction (architecture) were deduced as suitable construction activities for the preferential application of BIM. Since the results presented in this study are a rough analysis, it is judged that additional detailed analysis is necessary for the future.
This study aims to come up with the revision of construction standard unit price for concrete pavement works to improve its applicability and availability by a construction site survey. Construction site survey was conducted from March to November 2021 with 36 construction sites. This results of the revision are expected to support to public construction project owner or estimator in construction cost estimation works.
건설공사의 적정한 공사비산정을 위하여 건설공사의 실적을 토대로 하는 표준시장단가가 작성되고 있으며, 공공건설공사의 예정가격 작성을 위한 기초자료로 활용되고 있다. 현재 표준시장단가는 건설현장 시장상황 및 시공상황을 고려하여 산출되고, 보정기준을 마련하기 위하여 중장기 정비계획을 수립하여 공종별 시공실태 및 시장가격 변화에 대한 현장조사를 수행하고 있다. 그러나 중장기계획 정비가 5년 이상으로 장기화되고, 일시적 정비로는 중요도가 높고 단가변동성이 큰 핵심공종들에 대한 지속적인 관리가 어려운 문제점이 발생되고 있다. 이에 본 연구는 표준시장단가 적기 개정을 통한 적정공사비 확보를 위하여 표준시장단가 핵심공종을 도출하고, 중점관리방안을 제시하였다. 중요도 및 단가변동성 분석을 통하여 35개 조사그룹에 해당하는 242개 핵심공종들을 도출하였으며, 공종들의 중요 수준을 고려하여 중점관리방안을 제시하였다. 제시된 핵심공종 및 중점관리방안을 통하여 중요 공종들의 적기 개정이 가능할 것으로 판단된다. 또한 향후 중장기계획 재수립시 핵심공종에 대한 지속적인 관리방안을 수립하여, 공사비산정기준의 적절성을 적시적재에 반영할 수 있도록 기반을 마련하였다.
본 연구는 공공건설공사 중 조경공사 적산의 단가 비교로 적정 공사비 산출방안을 모색하고자 하였다. 2011년 상반기 실적단가에서 조경공사로 분류되는 12항목 중 유사기준인 7항목을 대비하며, 준용 공종은 5개 현장에 적용된 실적단가 80항목 중 비교 가능한 35항목을 유사기준인 2011년 3월의 표준품셈 단가로 대비하였다. 조경부문 7항목의 실적공사비율은 항목별로는 104.86%, 총공사비로는 92.09%이다. 실적공사비율이 높은 이유는 암반 적용 여부로 씨앗뿜어붙이기의 높은 비율도 있지만, 근본적인 이유는 잔디와 씨앗뿜어붙이기의 사면처리 비용 때문이므로, 품셈의 불합리성과 토양 종류별 기준별 보정계수 규정을 세분할 필요가 있다. 토목과 건축 준용부문 35항목의 실적공사비율은 항목별로 78.65%, 총공사비로는 71.31%(70.17%)이다. 이는 실적단가가 구조적으로 실제 금액을 반영하지 못하는 점과, 품셈은 인력시공에서 현실성이 결여된 때문으로 판단된다. 국토해양부 발표인 85.1~91.2%의 실적공사비율은 신규 전환품목 단가이므로, 이 결과는 실제적인 실적공사비율로 추정되며, 실적단가가 적정 비율을 보이도록 검증 후 보완하고 표준품셈도 이러한 실적자료 등으로 보완이 필요하다.
Jain, Deepanshi;Shrestha, K. Joseph;Jeong, H. David
국제학술발표논문집
/
The 6th International Conference on Construction Engineering and Project Management
/
pp.77-81
/
2015
The unit price contracting is the standard contracting method for highway projects in the U.S. As a result, state highway agencies have collected a large amount of historical bid data that they can use to determine engineer's estimates for future projects. The estimator must carefully consider various characteristics of a new project such as its location to determine an engineer's estimate as accurate as possible before bid letting. Higher cost estimates can result in the loss of the available budget and lower cost estimates may lead to deferral and delay of projects. The study uses the historical bid data obtained from Iowa Department of Transportation and develops a Geographic Information System (GIS) tool to visually show the variation of unit prices over the map using a spatial interpolation technique. The interpolation map can be used to estimate the unit price of the item at any location across Iowa. This noble method allows the estimator to effectively and fully utilize the historical bid data in a very time efficient manner and determine more accurate cost estimation.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.