• 제목/요약/키워드: construction standard unit price

검색결과 38건 처리시간 0.027초

공공건설공사 표준시장단가 적용 파급효과 분석 (Ripple Effect Analysis of Construction Standard Unit Price in Public Construction)

  • 김정훈;백승호;이주현
    • 한국산업융합학회 논문집
    • /
    • 제25권6_3호
    • /
    • pp.1207-1219
    • /
    • 2022
  • 「Act On Contracts To Which The State Is A Party」 stipulates that the "Construction Standard Production Rate" and "Construction Standard Unit Price" be used as the criteria for determining the estimated price of construction works performed by public institutions. In this regard, issues such as the application scope of the Construction Standard Unit Price, and the effect of budget reduction continue. However, due to the lack of quantitative data on the actual application of Construction Standard Unit Price, it is difficult to objectively evaluate various issues. In order to prepare data for objective evaluation of the Construction Standard Unit Price, this study analyzed the ripple effect of applying the Construction Standard Unit Price based on the bill of quantity. As a result of the analysis, the Construction Standard Unit Price ripple effect in the civil engineering part was 9.2%, and it was analyzed that there was a ripple effect of about 1.9% based on the civil engineering direct cost. In the construction part, the ripple effect was analyzed to be relatively high at 17%, but it was found to have a ripple effect of about 3% in the construction direct cost. Based on the total direct cost, the ripple effect was calculated as 2.2%. Based on the analysis results, it is possible to evaluate the effect of applying the Standard Market Unit Price, and it is expected to be used as basic data to solve issues. As a future study, it is necessary to additionally analyze the ripple effect by Standard Market Unit Price application range (over 10 billion, over 20 billion won, etc.) and delivery system type (comprehensive evaluation, qualification examination, technical bidding, etc.). In addition, it is necessary to study the appropriate ripple effect of the Standard Market Unit Price.

표준시장단가 공고시기 조정에 따른 영향분석 연구 (Analysis of the Influence of Changing the Announcement Date of Standard for Construction Cost Estimation)

  • 이주현;백승호
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2020년도 봄 학술논문 발표대회
    • /
    • pp.204-205
    • /
    • 2020
  • Construction Standard Unit Price is the unit price calculated based on the market price for work items in construction projects that have already been conducted. It is used as basic data for calculating the budget price of public construction projects. In the Construction Standard Unit Price Book implemented in the second half of 2020, there are 1,810 types of unit prices. Since 2017, 100-150 construction standard unit prices have been revised semiannually (on January 1 and July 1 of each year) through Construction Site Surveys. Other work items have been set based on the rate of inflation during the corresponding period. Later in 2020, this procedure was changed, with on-site survey period extended to one year to strengthen the construction standard unit price investigation. The revisions previous announced during the second half of the year were changed only to reflect the price inflation rates. With such changes in the revisions to construction standard unit prices, one important issue that was raised: The timing of announcing the revisions during the second half of the year (reflecting the price inflation rates). The market unit wage, which is the unit price standard of labor cost that takes up a large part of the construction cost, is announced in January and September. The figures announced in September is reflected on the construction standard unit price four months later in January, but the market unit wage announced in January is reflected only six months after in July, which causes a timing issue. As such, the current study analyzed problems rising from the changed timing of the announcements of the construction standard unit price during the second half of the year, in addition to analyzing their impact on public construction projects.

  • PDF

표준시장단가 및 BIM 라이브러리 연계 활용에 관한 기초연구 (Basic Research for Construction Standard Unit Price and BIM library Linkage)

  • 김정훈;백승호
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2021년도 봄 학술논문 발표대회
    • /
    • pp.251-252
    • /
    • 2021
  • With the recent emergence of the 4th Industrial Revolution, the government is promoting the development of smart construction technology and institutional improvement through various policies to induce cutting-edge and technological innovation in the construction industry. As part of such smart construction technology, the application of BIM is being activated, and related regulations and guidelines are constantly being supplemented. In relation to BIM, there are many studies on the fields of library, design standards etc., but research on specific unit price utilization and unit price DB construction for calculating construction cost is insufficient. Therefore, in this study, a basic study was conducted on the linkage of the construction standard market unit price and the BIM library. Based on the basic research conducted in the future, we intend to establish specific standards for calculating BIM-based construction costs.

  • PDF

건설현장 시장가격 모니터링을 위한 온라인 상시조사에 관한 기초연구 (Study of a Online Survey System for Monitering of Construction Cost on Construction Site)

  • 이주현;백승호
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2020년도 봄 학술논문 발표대회
    • /
    • pp.202-203
    • /
    • 2020
  • Unlike price calculation by cost accounting, which categorizes costs into material costs, labor costs, and miscellaneous expenses to determine the construction budget price, construction cost calculation based on Construction Standard Unit Prices utilizes unit prices extracted from market prices of items from projects already completed to estimate costs of similar construction projects. Although unit price information is collected through construction site surveys to revise these construction standard unit prices every year, but due to the limitations of the site survey method, it is difficult to quickly implement the rapid changes in the construction methods and market prices. As such, an important issue that arose was the identification of work items whose prices need urgent revision. This study conducted research on factors that need to be considered when developing online survey system for monitoring construction site market prices. This study is expected to enhance convenience for users, and provide an efficient data collection and management system for administrators.

  • PDF

건설공사 표준시장단가의 수장공사 및 목공사 개정에 관한 연구 (A Study on the Revision of Construction Standard Unit Price for Interior Finishing Work and Carpentry Work )

  • 이주현;백승호
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2023년도 가을학술발표대회논문집
    • /
    • pp.245-246
    • /
    • 2023
  • A construction site survey is carried out for the Construction Standard Unit Price(CSUP) in order to establish a standard for the appropriate estimated price. This paper proposed the revised plan by surveying the 56 sites under construction from March to October 2022 for interior finishing work and Carpentry work. It is expected that the revision of the CSUP for interior finishing work and Carpentry work will more accurately reflect the actual construction situation and contribute to improving the adequacy of the CSUP.

  • PDF

BIM기반 표준시장단가 우선적용 공종 분석 (BIM-based Priority Activity in Construction Standard Unit Price)

  • 김정훈;백승호
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2022년도 봄 학술논문 발표대회
    • /
    • pp.204-205
    • /
    • 2022
  • Recently, the application of BIM has been continuously expanded according to various government policies, and the application performance is being analyzed in BIM projects such as roads and railways. In line with this trend, the government is making additional efforts to introduce full-scale design BIM. The BIM design in the public sector is directly related to the estimated price. However, looking at the current status of BIM introduction, there is no support system in place for calculating the estimated price. Therefore, this study intends to analyze the priority activity that is easy to develop BIM unit price among the construction standard unit Price of construction work. In this study, in order to derive the BIM-based priority activity, BIM application statements and application guidelines were analyzed. As a result of the analysis, cast-in-place concrete construction (civil engineering) and reinforced concrete construction (architecture) were deduced as suitable construction activities for the preferential application of BIM. Since the results presented in this study are a rough analysis, it is judged that additional detailed analysis is necessary for the future.

  • PDF

콘크리트포장 시공실태 조사에 따른 표준시장단가 개정 연구 (A Study on the Revision of Construction Standard Unit Price for Concrete Pavement Works)

  • 이주현;백승호
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2022년도 봄 학술논문 발표대회
    • /
    • pp.196-197
    • /
    • 2022
  • This study aims to come up with the revision of construction standard unit price for concrete pavement works to improve its applicability and availability by a construction site survey. Construction site survey was conducted from March to November 2021 with 36 construction sites. This results of the revision are expected to support to public construction project owner or estimator in construction cost estimation works.

  • PDF

건설공사 표준시장단가 핵심공종 도출 및 중점관리방안 (Identification of Primary Activity and Management Plan for Construction Standard Unit Price)

  • 김정훈;백승호
    • 한국산학기술학회논문지
    • /
    • 제21권10호
    • /
    • pp.589-601
    • /
    • 2020
  • 건설공사의 적정한 공사비산정을 위하여 건설공사의 실적을 토대로 하는 표준시장단가가 작성되고 있으며, 공공건설공사의 예정가격 작성을 위한 기초자료로 활용되고 있다. 현재 표준시장단가는 건설현장 시장상황 및 시공상황을 고려하여 산출되고, 보정기준을 마련하기 위하여 중장기 정비계획을 수립하여 공종별 시공실태 및 시장가격 변화에 대한 현장조사를 수행하고 있다. 그러나 중장기계획 정비가 5년 이상으로 장기화되고, 일시적 정비로는 중요도가 높고 단가변동성이 큰 핵심공종들에 대한 지속적인 관리가 어려운 문제점이 발생되고 있다. 이에 본 연구는 표준시장단가 적기 개정을 통한 적정공사비 확보를 위하여 표준시장단가 핵심공종을 도출하고, 중점관리방안을 제시하였다. 중요도 및 단가변동성 분석을 통하여 35개 조사그룹에 해당하는 242개 핵심공종들을 도출하였으며, 공종들의 중요 수준을 고려하여 중점관리방안을 제시하였다. 제시된 핵심공종 및 중점관리방안을 통하여 중요 공종들의 적기 개정이 가능할 것으로 판단된다. 또한 향후 중장기계획 재수립시 핵심공종에 대한 지속적인 관리방안을 수립하여, 공사비산정기준의 적절성을 적시적재에 반영할 수 있도록 기반을 마련하였다.

조경공사 적산방식의 비교연구 - 실적공사비와 표준품셈의 단가비교 - (Comparative Study of Cost Estimate System in Landscape Architectural Construction - Comparison of Unit Price between Actual Construction Cost and Standard Quantity per Unit -)

  • 정운수;최기수
    • 한국조경학회지
    • /
    • 제40권2호
    • /
    • pp.97-111
    • /
    • 2012
  • 본 연구는 공공건설공사 중 조경공사 적산의 단가 비교로 적정 공사비 산출방안을 모색하고자 하였다. 2011년 상반기 실적단가에서 조경공사로 분류되는 12항목 중 유사기준인 7항목을 대비하며, 준용 공종은 5개 현장에 적용된 실적단가 80항목 중 비교 가능한 35항목을 유사기준인 2011년 3월의 표준품셈 단가로 대비하였다. 조경부문 7항목의 실적공사비율은 항목별로는 104.86%, 총공사비로는 92.09%이다. 실적공사비율이 높은 이유는 암반 적용 여부로 씨앗뿜어붙이기의 높은 비율도 있지만, 근본적인 이유는 잔디와 씨앗뿜어붙이기의 사면처리 비용 때문이므로, 품셈의 불합리성과 토양 종류별 기준별 보정계수 규정을 세분할 필요가 있다. 토목과 건축 준용부문 35항목의 실적공사비율은 항목별로 78.65%, 총공사비로는 71.31%(70.17%)이다. 이는 실적단가가 구조적으로 실제 금액을 반영하지 못하는 점과, 품셈은 인력시공에서 현실성이 결여된 때문으로 판단된다. 국토해양부 발표인 85.1~91.2%의 실적공사비율은 신규 전환품목 단가이므로, 이 결과는 실제적인 실적공사비율로 추정되며, 실적단가가 적정 비율을 보이도록 검증 후 보완하고 표준품셈도 이러한 실적자료 등으로 보완이 필요하다.

Spatiotemporal Visualization of Unit Price Data of Highway Projects

  • Jain, Deepanshi;Shrestha, K. Joseph;Jeong, H. David
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.77-81
    • /
    • 2015
  • The unit price contracting is the standard contracting method for highway projects in the U.S. As a result, state highway agencies have collected a large amount of historical bid data that they can use to determine engineer's estimates for future projects. The estimator must carefully consider various characteristics of a new project such as its location to determine an engineer's estimate as accurate as possible before bid letting. Higher cost estimates can result in the loss of the available budget and lower cost estimates may lead to deferral and delay of projects. The study uses the historical bid data obtained from Iowa Department of Transportation and develops a Geographic Information System (GIS) tool to visually show the variation of unit prices over the map using a spatial interpolation technique. The interpolation map can be used to estimate the unit price of the item at any location across Iowa. This noble method allows the estimator to effectively and fully utilize the historical bid data in a very time efficient manner and determine more accurate cost estimation.

  • PDF