• Title/Summary/Keyword: construction situation

Search Result 1,227, Processing Time 0.037 seconds

A Study on Wage System and Social Security for Precarious Workers: Focusing on the Award Wage of Construction Workers in Australia (불안정 노동자를 위한 임금 체계와 사회보장 사례 연구: 호주 건설 노동자의 어워드 임금 체계를 중심으로)

  • Lee, Gyunho;Lim, Woontaek
    • Korean Journal of Labor Studies
    • /
    • v.24 no.3
    • /
    • pp.109-142
    • /
    • 2018
  • This paper aims to analyze the Award wage system in Australia for construction workers. Considering low wages and precarious employment situation of construction workers in general, it is of advantage especially for them in Australia. Furthermore, it seems to be instructive for Korean construction workers, who stand in more precarious and unstable situation and furthermore are lack of fair wage and social safety. After strong and longstanding labour struggle in the late 19th century in Australia, it has been established a tripartite institution called as 'tribunal' between trade unions, employers, and the government. Under the highly institutionalized form of industrial relations, it functions as an arbitration and conciliation system between labour and management. The Award wage system stands in the middle point. This Award wage system including various welfare provisions is settled by the tribunal, today renamed as Fair Work Commission. In this wage system should be defined level of minimum wages according to the various skill levels, which are in turn connected with compulsory superannuation and Medicare as well as vocational education and training. Furthermore, it provides especially for the construction workers, who suffer from job instability, so-called 'portable benefits', which relate to long service leave and redundancy pay. Considering general conditions of precarious construction workers in Korea, In that respect, the Australian Award wage system would be very instructive for our social wage and safety system for construction workers.

A Study on the Construction for Optimal Network of Metro Transfer System in Yangsan Area (양산지역 도시철도 환승체계 최적노선망 구축에 관한 연구)

  • Choi, Yang Won
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.30 no.1D
    • /
    • pp.27-36
    • /
    • 2010
  • Recently, the management of metro business in large cities has become more difficult because of increased construction and operation costs. The purpose of this paper presents the construction of transfer system to resolve about recent tendency to decrease of metro-users and diminution of use efficiency which are serious problems of Busan metro. To cope with this situation, it is necessary to examine the methods of obtaining returns on development profits of land value rises that occur due to transfer system construction between Busan metro line #1 and line #2 in Yangsan area. Therefore, it was made use of research on metro utilization to presuppose service improvement, as an alternative, in the transfer system construction between metro and metro which might be powerful influence over metro-users. In this research, it was examined the actual situation of rises in land values brought about by the transfer system construction of metro line #1 and line #2 in Yangsan area with application of four (4) methods, and have calculated a basis of the development profits produced by the transfer system construction of metro line. According to the economical efficiency analysis, the total construction cost amount to 4,827.1 billion won of case #1 based on single track, and evaluate economically as B/C to 1.013, NPV to 72.7 billion, IRR to 5.614 percent.

A Research on the Renovation Situation of the Business Buildings (업무시설의 리노베이션 현황에 관한 조사 연구)

  • Lee, Hyun-Jeong;Shim, Myung-Sup
    • Journal of the Korea Institute of Building Construction
    • /
    • v.2 no.2
    • /
    • pp.121-127
    • /
    • 2002
  • The functions and uses of existing buildings are not properly changing as modern life needs. As a result, the frequent reconstruction(construction after removal) of existing buildings have been done but it became more and more difficult because of strengthening of regulations and systems concerning construction. And also it has several disadvantages like lower plot ratio and site coverage than existed buildings, enormous construction cost, production of waste-construction materials and thoughtless consumption of natural resources, which gives rise to environmental pollution. Therefore renovation is brought to the fore. In Korea, many business buildings were constructed in 1960s-1970s, during the period of high growth. Such buildings needs to be repaired in whole. It is caused by the change of social, economic, and cultural conditions and deterioration of equipments. Therefore renovation meets some necessary conditions; recovery of building functions and extension of building life span. In case study, the present state of renovation in business buildings is 1) Basic safety, for example, fire prevention and crime prevention, is great important. 2) Advanced technology, INS(international news service), IBS(Intelligent Building System), and internationalization, is pursued for adapting to multimedia ages. 3) It tries to promote proficiency, and to save the energy using spatial environment and natural energy(light and sound). Also, improving comfortable level of users and installing equipments for physically handicapped person needs to be considered.

A Study on the Cost Risk Analysis Method for Construction Projects (건설 프로젝트의 코스트 리스크 분석방법론에 관한 연구)

  • Lee Dong-Un;Kim Yeong-Su
    • Korean Journal of Construction Engineering and Management
    • /
    • v.4 no.4 s.16
    • /
    • pp.201-211
    • /
    • 2003
  • Considering about construction projects characteristics, there Is an existing uncertainty which causes inaccuracy or invalidity under decision making situation. Therefore, cost risk analysis of numerous construction projects are Inclined to depend on expert's experiences and subjective judgements. In Korean domestic construction works, however, there is no reasonable method or process for applying subjective elements. Only probabilistic analysis using objective calculation are being used now. This research suggests a cost risk analysis method to analyze quantitatively Cost Impact by risk, and it appraises expert's subjective elements for the purpose of enhancing validity of cost estimation. Moreover, a new cost risk analysis method is introduced for providing convenient user interface in practical business.

An Economic Analysis for Remodeling of High-rise Apartment (비도심지 고층아파트 리모델링의 경제성 분석)

  • Kim Eun-Jung;Han Choong-Hee;Kim Sun-Kuk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.559-562
    • /
    • 2002
  • Re-construction and remodeling were presented by the alternative in reply by inventory extension of dilapidated high-rise apartment. functional, social, economical dilapidation is enforced for reason than deterioration that reconstruction congratulatory address household mascot is physical and various kinds problem such as social cost by early loss of house was presented. Regulation about re-construction is intensified and remodeling connection system will be improved. Existent research about economic performance analysis of remodeling business development profit such as Gangnam and jamsil is preponder .Wish to present one inside about re-construction and remodeling city economic performance examination in gang of bandits mind apartment owner's situation in this research..

  • PDF

A Business Planning Process Model to Develope Successful Housing Project (개발형 주택건설사업의 성공적 수행 위한 사업 기획 업무프로세스 모델 연구)

  • Park Chan Woo;Kim Kyung-Rai
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.245-250
    • /
    • 2001
  • Nowadays, there has been extreme competition due to market reduction in the domestic construction industry. In this situation, Korean construction companies are focused in the area of planning development housing project, which should maximize profit for a project. The most important step in this project is the business planning stage which judge whether it could come true or not. Each company has its own planning process model, but there hasn't been any standard model for the business planning process. To solve this problem in Korean construction companies, this study identifies the existing business planning process in the domestic construction companies finds out its problems, and suggests solutions for thorn. And Finally a business planning process model is proposed for success in development housing projects.

  • PDF

Driving Burj Dubai Core Walls with an Advanced Data Fusion System.

  • Cranenbroeck, Joel Van;Hayes, Douglas McL;Sparks, Ian R
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • v.1
    • /
    • pp.465-469
    • /
    • 2006
  • In recent years there has been considerable interest in the construction of super high-rise buildings. From the prior art, various procedures and devices for surveys during and after the phase of erection of a high-rise building are known. High-rise buildings are subject to strong external tilt effects caused, for instance, by wind pressures, unilateral thermal effects by exposure to sunlight, and unilateral loads. Such effects are a particular challenge in the phase of construction of a high-rise building, in as much as the high-rise building under construction is also subject to tilt effects, and will at least temporarily lose its - as a rule exactly vertical - alignment. Yet construction should progress in such a way that the building is aligned as planned, and particularly so in the vertical, when returning into an un-tilted basic state.It is essential that a straight element be constructed that theoretically, even when moving around its design centre point due to varying loads, would have an exactly vertical alignment when all biasing conditions are neutralised. Because of differential raft settlement, differential concrete shortening, and construction tolerances, this ideal situation will rarely be achieved. This paper describes a procedure developed by the authors using GPS observations combined with a network of precision inclination sensor to provide reliable coordinated points at the top of the worldwide highest-rise building under construction in Dubai.

  • PDF

CONSTRUCTION PROJECT CLAIM MANAGEMENT

  • M. ASLAM MIRZA
    • International conference on construction engineering and project management
    • /
    • 2007.03a
    • /
    • pp.160-168
    • /
    • 2007
  • Conflicts of interest and independent agenda of the parties brought together for implementation of a construction project often leads to dispute in Contract and claim situations. Construction Industry is notorious for claim that is managed on its arising and there lacks an endeavor to minimize the breeding grounds through efficient planning and alignment to purpose, of all contract-documents. There failure of a concerted effort entails wastage of resources, delayed completion of facilities and stained relationships of parties when collide in mistrust in contract to win over the other. There needs a focus on the claim breeding issue and establish an effective mechanism to deal with disputes in urgency. Claim occurs mostly during the construction phase. But the seeds of claim and nutrients essential for development are contained in the contract documentation and the information supplied or not in pre-contract phase. Opportunity to prevent nutrients for seed of Claim comes to an end once tender-documents are finalized, the contract is awarded and established or not a mechanism for dealing with claim situation. The processes presented here would help in minimizing the breeding grounds and emergence of disputes during progression of works and dealing with eventualities in forceful manners for finding a resolution most effectively in relevant time.

  • PDF

How to Measure Alert Fatigue by Using Physiological Signals?

  • Chae, Jeonghyeun;Kang, Youngcheol
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.760-767
    • /
    • 2022
  • This paper introduces alert fatigue and presents methods to measure alert fatigue by using physiological signals. Alert fatigue is a phenomenon that which an individual is constantly exposed to frequent alarms and becomes desensitized to them. Blind spots are one leading cause of struck-by accidents, which is one most common causes of fatal accidents on construction sites. To reduce such accidents, construction equipment is equipped with an alarm system. However, the frequent alarm is inevitable due to the dynamic nature of construction sites and the situation can lead to alert fatigue. This paper introduces alert fatigue and proposes methods to use physiological signals such as electroencephalography, electrodermal activity, and event-related potential for the measurement of alert fatigue. Specifically, this paper presents how raw data from the physiological sensors measuring such signals can be processed to measure alert fatigue. By comparing the processed physiological data to behavioral data, validity of the measurement is tested. Using preliminary experimental results, this paper validates that physiological signals can be useful to measure alert fatigue. The findings of this study can contribute to investigating alert fatigue, which will lead to lowering the struck-by accidents caused by blind spots.

  • PDF

The Construction of Children's Partitioning Strategy on the Equal Sharing Situation (균등분배 상황에서 아이들의 분할전략의 구성)

  • Kim, Ah-Young
    • School Mathematics
    • /
    • v.14 no.1
    • /
    • pp.29-43
    • /
    • 2012
  • This paper investigated the conceptual schemes in which four children constructed a strategy representing the situation as a figure and partitioning it related to the work which they quantify the result of partitioning to various types of fractions when an equal sharing situation was given to them in contextual or an abstract symbolic form of division. Also, the paper researched how the relationship of factors and multiples between the numerator and denominator, or between the divisor and dividend affected the construction. The children's partitioning strategies were developed such as: repeated halving stage ${\rightarrow}$ consuming all quantity stage ${\rightarrow}$ whole number objects leftover stage ${\rightarrow}$ singleton object analysis/multiple objects analysis ${\rightarrow}$ direct mapping stage. When children connected the singleton object analysis with multiple object analysis, they finally became able to conceptualize division as fractions and fractions as division.

  • PDF