• 제목/요약/키워드: construction simplification

검색결과 107건 처리시간 0.026초

Douglas Peucker 근사화 알고리즘과 빈 분류 기반 벡터 맵 데이터 압축 (Vector Map Data compression based on Douglas Peucker Simplification Algorithm and Bin Classification)

  • 박진혁;장봉주;권오준;정재진;이석환;권기룡
    • 한국멀티미디어학회논문지
    • /
    • 제18권3호
    • /
    • pp.298-311
    • /
    • 2015
  • Vector data represents a map by its coordinate and Raster data represents a map by its pixel. Since these data types have very large data size, data compression procedure is a compulsory process. This paper compare the results from three different methodologies; GIS (Geographic Information System) vector map data compression using DP(Douglas-Peucker) Simplification algorithm, vector data compression based on Bin classification and the combination between two previous methods. The results shows that the combination between the two methods have the best performance among the three tested methods. The proposed method can achieve 4-9% compression ratio while the other methods show a lower performance.

하수관망 규모에 따른 단순화 SWMM에 대한 2차원 침수분석결과의 정확성 평가 (Accuracy evaluation of 2D inundation analysis results of simplified SWMM according to sewer network scale)

  • 이정환;강성규;육지문;문영일
    • 한국수자원학회논문집
    • /
    • 제52권8호
    • /
    • pp.531-543
    • /
    • 2019
  • 최근 발생하는 반복적인 홍수피해를 최소화하기 위한 실시간 도시홍수예보 연구에서는 정확한 유출, 침수결과를 나타내는 모형과 그 모형의 모의시간 단축이 중요한 핵심요소이다. 서울특별시를 비롯한 주요 도시지역의 하수관망은 그 개수는 많고 복잡하여 실시간 도시홍수예보에 적합하지 않아 강우-유출모형의 단순화를 진행한다. 하지만 하수관망의 단순화는 연구자의 주관과 단순화 방식에 따라 유출결과가 크게 달라질 수 있으며 2차원 침수분석에서는 그 차이가 더욱 크게 발생한다. 따라서 본 연구에서는 하수관망의 개수 및 분포가 각각 다른 여러 도시지역의 하수관망을 일정 기준으로 단순화하고 2차원 침수분석을 통해 하수관망 규모에 따른 단순화 모형의 정확성을 평가하고자 한다. 하수관망의 단순화 분석은 서울시의 주요 상습침수구역인 신림, 관악, 도림천 유역을 대상으로 진행하였으며 구축한 SWMM에서 노드의 누가유역면적을 4가지 범위로 나누어 단순화를 위한 범위산정 기준으로 설정하였다. 이를 통해 산정된 단순화 모형의 침수결과는 실시간 도수홍수예보에 적합한 정확도 높은 유출모형 구축에 기여할 수 있을 것으로 기대한다.

3D Pattern Construction and Its Application to Tight-fitting Garments for Comfortable Pressure Sensation

  • Jeong Yeon-Hee;Hong Kyung-Hi;Kim See-Jo
    • Fibers and Polymers
    • /
    • 제7권2호
    • /
    • pp.195-202
    • /
    • 2006
  • Tight-fitting clothing pattern reflecting the accurate information of the 3D body shape has been one of the challenges for garment industry, however, fitting problems still exist. The objectives of the paper is to develop a 2D pattern which fits tightly to the 3D human scan data for sports suits that need comfort and function for maximum performance. In this study, the user graphic interface application software for the semi-automatic garment pattern generation has been implemented using the triangle simplification scheme together with 2D projections of free-falling of 3D surface polygons keeping the original 3D surface area preservation. A typical application of the developed pattern to the functional body suits is presented and verification of the proposed method is also provided.

Generation of Realistic Terrain Based on LOD Simplification and Fractal

  • Min, Hu;Zhen, Wang
    • International Journal of CAD/CAM
    • /
    • 제8권1호
    • /
    • pp.37-40
    • /
    • 2009
  • Based on the study of Digital Elevation Simplification Model and fractal theory, this paper put forward a new method to simulate complex terrain. That use simplified DEM data to construct terrain frame based on the quad tree at first, and then use fractal to generate the details of every node of the tree. In the process of construction, the LOD theory is used to simplify the terrain and get its typical data. According to the change of view position and direction, the paper gives a new way to judge the visibility of the surface patch. Experimental results show that this algorithm is simple, efficient and supports the real time dynamic simulation of terrain model.

무도상 철도판형교의 동적응답특성 및 보강방안 (Dynamic Response and Reinforcement of the Railway Plate Girder Bridges)

  • 황원섭;조은상;오지택;김현민
    • 한국강구조학회 논문집
    • /
    • 제19권3호
    • /
    • pp.281-290
    • /
    • 2007
  • 본 논문에서는 상용유한요소해석 프로그램을 이용하여 12형 무도상 판형교를 보요소의 형상함수를 이용한 시간하중함수를 열차의 표준하중선도에 적용하여 해석하였다. 또한 Klingel의 sine운동을 적용하여 횡방향 거동특성을 모사하였다. 실제 운행한 상시운행열차 및 증속 실험의 자료와 해석프로그램의 변위, 가속도 자료를 비교하여 해석프로그램 및 해석기법의 타당성을 검토하였다. 그 결과 수평변위와 수직변위의 시간이력이 실제 계측된 자료를 적정수준으로 반영하였다. 6가지 보강모델의 수직 및 수평방향의 변위, 가속도의 보강효과를 살펴보았으며 상부 수평브레이싱 시스템을 하부에 도입한 RF-1모델과 판을 보강한 RF-3모델이 중량제한과 시공성 등을 고려할 때 가장 효과적인 보강방법으로 판단된다.

중앙일면식 케이블과 등형고를 갖는 Extradosed PSC 교량의 설계 및 시공 (Design & Construction of PSC Box-Girder Bridge with Central Suspension by Extradosed Cables and Constant Girder Depth)

  • 조의경;김성일;박종화;이수열
    • 한국콘크리트학회:학술대회논문집
    • /
    • 한국콘크리트학회 2003년도 봄 학술발표회 논문집
    • /
    • pp.618-625
    • /
    • 2003
  • The recent development of PSC girder bridges are mostly dedicated for optimization of self-weight, simplification of girder section for easy construction and minimization of maintenance efforts. Moreover some of those bridges are required as a landmark facility which raises the image of locality and harmony with surroundings. An extradosed bridge is one of the best alternates which not only covers the longer span than PSC box girder and also performs the role of landmark facility with much cheaper cost than cable stayed bridge. Hyundai is carrying out the construction of unique style extradosed bridge which have central suspension system and uniform girder depth named Keong-An grand bridge on the Sungnam-Janghowon Express highway. In this paper, major process of design and construction features of Keong-An bridge is presented.

  • PDF

원전 3D 모델 사용성 강화를 위한 CAD 모델 경량화 방안 정립 (Establishment of Plan to lighten CAD Model for Strengthening Usability of Nuclear Power Plant 3D Model)

  • 김종명;김우중
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2019년도 춘계 학술논문 발표대회
    • /
    • pp.248-249
    • /
    • 2019
  • In the nuclear industry, in order to keep pace with the 4th industrial revolution era, they are trying to improve the construction and maintenance ability by utilizing the technologies such as digital twin and VR/AR from the construction stage. However, the nuclear 3D CAD model, which is used as the base in the latest technology, is heavy due to a large number of facilities per unit space compared to other industrial companies, and it is difficult to directly incorporate the latest technology into the results of CAD programs for design purposes. In this study, in order to improve usability, we tried to lighten the 3D model. First, we analyze the existing nuclear power plant 3D model and draw out the problems and features. Secondly, we derived the factors to consider when we make the 3D CAD models lightweight.

  • PDF

A fast construction sequential analysis strategy for tall buildings

  • Chen, Pu;Li, Hao;Sun, Shuli;Yuan, Mingwu
    • Structural Engineering and Mechanics
    • /
    • 제23권6호
    • /
    • pp.675-689
    • /
    • 2006
  • In structural analysis of tall buildings the traditional primary loading analysis approach that assumes all the loads are simultaneously applied to the fully built structure has been shown to be unsuitable by many researches. The construction sequential analysis that reflects the fact of the level-by-level construction of tall buildings can provide more reliable results and has been used more and more. However, too much computational cost has prevented the construction sequential analysis from its application in CAD/CAE software for building structures, since such an approach needs to deal with systematic changing of resultant stiffness matrices following level-by-level construction. This paper firstly analyzes the characteristics of assembling and triangular factorization of the stiffness matrix in the finite element model of the construction sequential analysis, then presents a fast construction sequential analysis strategy and a corresponding step-by-step active column solver by means of improving the existing skyline solver. The new strategy avoids considerably repeated calculation by only working on the latest appended and modified part of resultant stiffness matrices in each construction level. Without any simplification, the strategy guarantees accuracy while efficiency is greatly enhanced. The numerical tests show that the proposed strategy can be implemented with high efficiency in practical engineering design.

확률 기반 설계법을 위한 코드 변환과 시스템 신뢰도에 대한 고찰 (The study on the system reliability and code conversion for the probability based design)

  • 김광철
    • 한국가구학회지
    • /
    • 제20권5호
    • /
    • pp.440-456
    • /
    • 2009
  • Because PBD was started as a design tool for steel construction and concrete construction, it was able to applied to the post and beam method of wooden building constructions. But, it may not suitable to light frame wooden construction that is becoming popular in domestic construction market due to the economical efficiency and the constructive simplification. Owing to the share effects between member and sheathing material or among structural members, light frame wooden construction is different from post and beam construction that use a single structural member. Therefore, consideration on the system analysis and system design are urgently needed to use in actual life and inspect the reliability of structures from the system view. With this in mind, code conversion from ASD to PBD that is pressing issue in domestic wooden building construction was studied, also various countries status about PBD were considered and then approaching methods on the system reliability were referred. Finally, several considerations for the development of PBD were explored. PBD should be considered as, not only a new structural design process that select sizes of structural member, but a industrial tool that can lead a development of more reliable wood products. A strongest point of PBD is independent of various construction materials and construction types.

  • PDF

BIM 기반 견적을 위한 창호공사 내역 작성체계 개선 방안 (Improvement of Bill of Quantities of Door and Window Work for BIM-based Cost Estimation)

  • 김미현;조찬원;윤석헌
    • 한국BIM학회 논문집
    • /
    • 제10권2호
    • /
    • pp.12-20
    • /
    • 2020
  • Recently, interest in BIM technology has been growing in the domestic construction market as the number of construction projects requiring the application of BIM technology has increased. The use of BIM allows the use of various visualization functions through 3D models as well as drawing interference review, quantity calculation and integrated management of information. In particular, estimates of construction costs based on BIM can increase work efficiency by reducing the burden of calculating construction costs and managing them. In order to increase the efficiency of BIM-based cost estimates, it is necessary to improve the correlation between the BoQ(Bill of Quantity) information and the BIM model. For this purpose, the ratio of the amount and item to the detailed construction of the current BoQ was analyzed, especially the problem of the calculation of construction cost in the window work in this study. In addition, we would like to suggest a method for systematically linking the BoQ information with the BIM model by improving the BoQ information structure of the window work. It is expected that this will increase the efficiency of the quantity calculation and analysis work of construction cost of window work. In addition, it is expected that this method will help to analyze and predict changes in construction cost of windows and doors by facility characteristics and type.