Kim Sun-Hee;Kim Du Yeon;Park Sang Hyuk;Yeom Sang Min;Chae Myung Jin;Han Seung Heon
Proceedings of the Korean Institute Of Construction Engineering and Management
/
2004.11a
/
pp.462-467
/
2004
Design-build, which is defined as single source responsibility for design and construction, has been widely used in large public works since governmental formulation of measure for encouraging use of design-build in 1996. However, civic groups and small and medium sized enterprises are highlighting over-competition and unbalanced market shares of conglomerate in domestic design-bid market and insisting on decrease in the use of design-build and absorption into the lowest-price bidding. This study collected information about cost, schedule, quality, new technology adoption from 51 civil design-build projects and measured their performance.
Proceedings of the Korean Institute Of Construction Engineering and Management
/
2004.11a
/
pp.210-215
/
2004
In can occur to many problems on progressing step without close scope definition, interrelation definition between activities, resource plan, and schedule plan on planning step. But it have not closely defined performance system on planning step because of many constraints of domestic construction industry. Therefore this paper intends to discuss a method of calculating optimal cost and duration using Linear Programming that solves maximing or minimizing problems among decision making methodology and Monte Carlo Simulation that decreases to probability errors. With outcoms applying Linear programming and Monte Carlo Simulation for calculating optimal cost and duration, follow as : With outcomes applying Monte Carlo Simulation, it could calculate reliable estimator about project duration through removing various constraints. With outcomes applying Linear programming, it could calculate optimal value about project cost through defining various variables and constraints on many activities.
Korean Journal of Construction Engineering and Management
/
v.13
no.1
/
pp.77-86
/
2012
Progress measurement provides project participants with valuable information in terms of 'current status', 'corrective countermeasure', and 'forecast of future risks'. However, the managerial effort (or workload) required to acquire and maintain detailed progress data has been the major barrier to practical implementation. Even though recent efforts in utilizing data acquisition technologies (DATs) have actively attempted to automate the progress measurement process, previous DAT research has only been focused on limited construction tasks or selected technologies. This paper proposes a DAT selection algorithm that automatically assign an appropriate DAT for every commodity item for an entire constriction project. Five different criteria were identified and developed in order to comprehend specific requirements for automating the progress measurement of each commodity group. A case-study and also a survey from practitioners were conducted in order to validate the proposed methodology.
Korean Journal of Construction Engineering and Management
/
v.13
no.5
/
pp.144-152
/
2012
The reason why most scheduling softwares currently using at construction projects adopt PDM (Precedence Diagramming Method) is that it can express an overlapping relationship between activities. However, the overlapping relationships in PDM are represented only by combinations of four overlapping types that connect the start and finish points of two activities, therefore, PDM cannot express efficiently the relationships between any middle points of two activities if they should be represented. This research proposes the method of transforming the four overlapping types of PDM to the overlapping relationships of BDM(Beeline Diagramming Method), new networking technique, that can connect the inter-relationships at any middle points of two activities as well as express multiple overlapping relationships. The proposed method will help not only to improve an efficiency of scheduling but also to upgrade the scheduling technique because BDM technique has a lot of unique advantages in scheduling.
Proceedings of the Korean Society of Propulsion Engineers Conference
/
2010.11a
/
pp.343-346
/
2010
The construction plan of a combustion chamber test facility(CTF), a turbopump real propellant test facility(TPTF), a rocket engine ground/high altitude test facility(ReTF, HAReTF) and a propulsion system test complex(PSTC) for KSLV-II is briefly described. The development/qualification tests of 75ton-class liquid rocket engine system and engine component will be performed in CTF, TPTF, ReTF and HAReTF and the development test of $1^{st}/2^{nd}/3^{rd}$ propulsion systems for KSLV-II will be performed in PSTC. These propulsion test facilities will be built in NARO space center considering construction schedule, cost, safety distance and utility factor of propulsion test facilities.
Korean Journal of Construction Engineering and Management
/
v.1
no.1
s.1
/
pp.45-52
/
2000
In Korea, demand for the Social Overhead Capital(SOC) projects has tremendously increased since 1970's and is expected to keep growing to support national economic development as well as to enhance the quality of life. In these projects, project planning and feasibility study phase is one of the most critical phases because it determines the success of later phases. However, we have experienced trial and errors repeatedly such as cost overruns and schedule delays in many of the SOC projects. These problems can be prevented or at least expected in the earlier phase and it requires well-developed and standardized project planning process and systems before design, procurement, and construction phases begin. Therefore, the purpose of this research is to investigate current problems in this phase and provide framework for a model for the project planning management which can be used for the SOC projects to insure the whole project success.
Korean Journal of Construction Engineering and Management
/
v.5
no.5
s.21
/
pp.135-142
/
2004
This paper proposes the CPM bar chart (CBC), a hybrid of the bar chart and the critical pad method (CPM). The CBC overcomes shortages of the fenced bar chart, while still keeping advantages. The fence with direction is applied instead of the broken fence, which triggers considerable problems to identify and apply in the fenced bar chart. In addition, the notorious task to find dummy activities is no longer required. Upon the benefits of simplicity in the bar chart and logical work sequence in the CPM network. the CBC provides a relatively easy way to create and understand a schedule, thus improving communication quality between project participants. With the advantages, the CBC can also be effectively applied to various scheduling techniques such as resource constrained scheduling, resource leveling, scheduling with activity split, delay impact analysis, etc.
Korean Journal of Construction Engineering and Management
/
v.15
no.2
/
pp.79-86
/
2014
Construction project become larger and more complicated. Korea go through government complex relocation Mega-size program including many sub-projects which were complicated, long-term, and need extensive funding. Effective change management is very important for this kind of mega-project since it has many stakeholders and can't avoid continual change of schedule, budget, etc. Especially, change management process and system is very important for program success. When each project have changes, program is impacted by these changes. So, Change management is very important for effective program budget and time management. This study try to develop change management process and framework considering continuous changes in project level for effective program management. In addition, this study developed change management system and applied it to new mega-size program and analyze the effectiveness.
Proceedings of the Korean Institute Of Construction Engineering and Management
/
2007.11a
/
pp.32-38
/
2007
Recently The public project ordering is a tendency increasing of CM service because of the visible and affirmative effect in the CM which is advanced meanwhile. The CM services of project all phase excepts a planning business are performed. But recently the CM services of project all phase including a planning business are increasing every year. To develop CM must be prepared the system plans concerned with the CM application from planning phase, actuality maintenance of CM fee-estimation standard, understanding conversion of participation subjects, etc. But, unexpected actuality the problems occurs when the CM business is performing. The purpose of this study are to present the solution to the problems concerned with the planning business management, additional business by owner, schedule control and establish the plan to perform CM services efficiently in the public sector through analyzing the case of CM application in Daegu Gyeongbuk Institute of Science & Technology.
Journal of the Architectural Institute of Korea Structure & Construction
/
v.33
no.12
/
pp.37-44
/
2017
Due to structural characteristics, construction costs and duration of a modular system would be saved by minimizing the schedule on the job site. As such, it is crucial to develop a connection that can guarantee stiffness while allowing for simple assembling. Particularly, the mid- to high-rise construction of the modular system necessitates the securing of the structural stability and seismic performance of multi-unit frames and connections, and thus, the stiffness of unit-assembled structures needs to be re-evaluated and designed. However, evaluating a frame consisting of slender members and reinforcing materials is a complicated process. Therefore, the present study aims to examine the structural characteristics of a modular unit connection based a method for reinforcing connection brackets and hinges while minimizing the loss of the cross section. Toward this end, the study modeled the beam-to-column connection of a modular system with the proposed connection, and produced a specimen which was used to perform a cycling loading test. The study compared the initial stiffness, the attributes of the hysteretic behavior, and the maximum flexural moment, and observed whether the model acquired the seismic performance, compared to the flexural strength of the steel moment frame connection that is required by the Korean Building Code. The test results showed that the proposed connection produced a similar initial stiffness value to that of the theoretical equation, and its maximum strength exceeded the theoretical strength. Furthermore, the model with a larger ceiling bracket showed higher seismic performance, which was further increased by the reinforcement of the plate.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.