A BLOG BASED RISK MANAGEMENT SYSTEM USING SOFT SCHEDULE

  • Soo-Myeong Jin;You-Sang Yoon;Myung-Houn Jang;Sang-Wook Suh
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1334-1339
    • /
    • 2009
  • To achieve the best performance of a project, uncertainties involved in the building construction process need to be identified in the planning phase of the project. Uncertainties seldom create a positive impact on construction project, but they almost cause delay and increase costs. Therefore, risk management plays a significant role in construction to minimize risk occurred due to uncertainties of a project. Although the importance of the risk management has been known to the construction industry, it is not enough to be developed to meet the demands of the industry. It has not been enough for Systems to control schedule risks for managers in the field. Therefore, a tool is necessary to efficiently control risks. The propose of this study is to invent Schedule Risk Control System Module to prepare for risks in preconstruction phase.

  • PDF

A study on the Information for the Schedule Management of the Construction based BIM (BIM기반 건설공사 일정관리를 위한 정보에 관한 연구)

  • Park, So-Hyun;Song, Jeong-Hwa;Oh, Kun-Soo
    • Journal of Digital Contents Society
    • /
    • v.16 no.4
    • /
    • pp.555-564
    • /
    • 2015
  • Since the size of the construction project has become massive, complicated and specialized, the use for a substantial amount of information provided from diverse participants is considered important. Schedule information obtained from a variety of sources is key during the construction project. Misunderstanding of schedule management information causes delay of construction period and low quality of construction. Currently, interest in BIM (Building Information Modeling) that produces the necessary data for the entire life cycle of the building process is rising. The study is to construct the BIM-base-information system in order to systematically manage schedule information of the construction work. For this purpose, the study established a BIM-base-schedule-management-business process and drew a classification system for the work for schedule-information construction. The study also drew information that can be extracted from the BIM model among properties required to build certain information. The schedule is made upon consideration of information needed for schedule management, and information required to schedule a timeline of the construction project by process is established.

Cost and Schedule Analysis of Highway Projects based on Project Types

  • Shrestha, Bandana;Shrestha, Pramen P.
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.50-56
    • /
    • 2022
  • Change Orders generally impact cost and schedule performance of highway projects. However, highway projects that do not have any change orders also face cost growth and schedule delays. This study seeks to determine the cost and schedule performance of Texas DOT projects by collecting project data for 120 highway projects completed between 2016 to 2020. For the study, we selected project data that has zero or negative change orders which were then grouped and analyzed based on their Project Types i.e., maintenance works; structural works; restoration and rehabilitation works; and safety works. The study found that performance of Maintenance and Safety type projects had less cost and schedule growth among the data analyzed. Statistical tests also found that even though the projects have no change orders, Rehabilitation and Restoration type projects experienced significant schedule growth compared to others. However, the data did not show any significant cost and schedule growth for the projects when statistical tests were performed on overall data. The study concluded that highway projects are experiencing schedule growth even though the projects had no change orders. Results from the study can help planners, engineers, and administrators to gain better insight on how different types of highway projects are performing in terms of cost and schedule and eventually derive appropriate solutions to minimize cost and schedule growth in such projects.

  • PDF

Development of Wireless Communication System and Application Program for Realtime Schedule Management at Construction Site (건설현장 실시간 공정관리를 위한 무선통신시스템 구축 및 응용프로그램 개발)

  • 진교홍;이혜원;김지홍
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.8 no.1
    • /
    • pp.192-199
    • /
    • 2004
  • As the construction site becomes larger, more complex and more special, the information of construction is expanded in quantity and specialized in quality. Therefore the computing system is necessary to effectively manage the construction schedule management. At present, main office at construction site bring in the computing system to perform the schedule management, so the data input and access for schedule management is performed by engineer on foot between construction site and main office. Therefore in this paper, we arrange wireless communication system between construction site and main of office and develop application program for data input and access of schedule management immediately using PDA at construction site. Through the our system we can improve the schedule management at construction site, and we can look forward to reduction of manpower, equipments, time, and money in whole construction.

Application of Work Relationships for Linear Scheduling Model (선형 공정계획 모델의 작업 관계성 적용 방법)

  • Rye, Han-Guk
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2010.05a
    • /
    • pp.131-133
    • /
    • 2010
  • As linear scheduling method has been used since 1929, Empire State Building linear schedule, it is being applied in various fields such as construction and manufacturing. When addressing concurrent critical path occurring on linear schedule of construction, the empirical researches stress the resource management which should be applied for optimizing work flow, flexible work productivity and continuos resource allocation. However, work relationships has been usually overlooked for making the linear schedule from existing network schedule. Therefore, this research analyze the previous researches related to linear scheduling model and then propose the method that can be applied for adopting the relationships of network schedule to the linear schedule.

  • PDF

A Study on the Specificity of Construction Progress for Landscape Construction Schedule Management -With regard to Landscape Construction of Housing Complex- (조경공사 공정관리를 위한 공정진도의 특성에 관한 연구 -주택단지 조경공사 사례를 대상으로-)

  • 박원규
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.20 no.4
    • /
    • pp.93-101
    • /
    • 1993
  • The purpose of this study is to analyze th especificity of landscape construction progress in order to develop the model of landscape construction schedule management. Nine case study area in housing complex was selected and the graphic curve of the accumulative payment by landscape construction schedule was analyzed. And the results are as follows: The graphic curve of common construction progress is S-curve but that of landscape construction progress is parabolic-curve, because landscape construction concentrally progress in last period of construction schedule. And particularly parabolic-curve seems to rise up suddenly in the last period when landscape construction amount is small.

  • PDF

Design and Implementation of Real-Time Progress Management System Using UML (Unified Modeling Language) - The Focus on Steel Structural Construction - (UML을 이용한 실시간 진도관리 시스템의 설계 및 구현 - 로봇 크레인 기반 철골공사를 중심으로 -)

  • Park, Jung-Lo;Kim, Kyung-Hwan;Kim, Jael-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2009.05b
    • /
    • pp.163-166
    • /
    • 2009
  • All sorts of technique for schedule progress management is being developed recently, These can change and develop the abstractive concept model to a detailed model that describes the visual 3D image about a schedule plan. but, this technique is troublesome, because this requires the handwork by means of connection between 3D-CAD and scheduling Program. In this study, the process of real-time schedule progress control system using the integrated database by 3D-CAD object information system and schedule module is presented. This study present the process of a schedule progress management using UML, and the process of real-time schedule progress management using RFID system. Through this study, we want to realize the rapid generation of estimated schedule information and to simulate and analyze actual schedule information by real-time.

  • PDF

DEVELOPMENT OF AN IMPROVED INSTALLATION PROCEDURE AND SCHEDULE OF RVI MODULARIZATION FOR APR1400

  • Ko, Do-Young
    • Nuclear Engineering and Technology
    • /
    • v.43 no.1
    • /
    • pp.89-98
    • /
    • 2011
  • The construction technology for reactor vessel internals (RVI) modularization is one of the most important factors to be considered in reducing the construction period of nuclear power plants. For RVI modularization, gaps between the reactor vessel (RV) core-stabilizing lug and the core support barrel (CSB) snubber lug must be measured using a remote method from outside the RV. In order to measure RVI gaps remotely at nuclear power plant construction sites, certain core technologies must be developed and verified. These include a remote measurement system to measure the gaps between the RV core-stabilizing lug and the CSB snubber lug, an RVI mockup to perform the gap measurement tests, and a new procedure and schedule for RVI installation. A remote measurement system was developed previously, and a gap measurement test was completed successfully using the RVI mockup. We also developed a new procedure and schedule for RVI installation. This paper presents the new and improved installation procedure and schedule for RVI modularization. These are expected to become core technologies that will allow us to shorten the construction period by a minimum of two months compared to the existing installation procedure and schedule.

A Delay Analysis based on the Comparison of the As-planned Schedule, As-built Schedule including All Delays and As-built Schedule absent Owner Delays (계획공정표, 모든 지연을 포함한 준공공정표, 발주자 지연을 제외한 준공공정표의 비교를 통한 공기지연분석)

  • Yun Chul-Sung;Chu Hae-Keum;Kim Seon-Gyoo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.426-429
    • /
    • 2003
  • In the construction process, there are many change orders differing to the initial contracts came from the social needs and environmental changes. Most of them will impact to the construction process so that its effects occur project delays. Time extension and liquidated damage in the construction process come from schedule delay whether it is excusable or not non-excusable by the owner. However, those become the delay claims if the owner and the contractor are not agreed on this situation. One of the most important thing on the delay claims is the calculation of delay. The purpose of this study is to present the method of the time delay calculation by comparison of As-Planned schedule, As-Built schedule including all delay and As-Built schedule absent owner delay.

  • PDF

A Study on Integration of Schedule Management and Risk Management (공정관리와 리스크관리의 통합을 위한 기초연구)

  • Jang, Myung-Houn;Youn, You-Sang;Suh, Sang-Wook
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.105-110
    • /
    • 2006
  • It is more effective and more efficient to manage schedule and risk at a same time because many risks occur in construction phase in building construction projects. The objective of this paper is to propose a tool that manages risks in a project management software. The tool is implemented by VBA in Microsoft Project, and enables field managers of a construction project to make schedules and to help to predict risks.

  • PDF