Abstract
Since the size of the construction project has become massive, complicated and specialized, the use for a substantial amount of information provided from diverse participants is considered important. Schedule information obtained from a variety of sources is key during the construction project. Misunderstanding of schedule management information causes delay of construction period and low quality of construction. Currently, interest in BIM (Building Information Modeling) that produces the necessary data for the entire life cycle of the building process is rising. The study is to construct the BIM-base-information system in order to systematically manage schedule information of the construction work. For this purpose, the study established a BIM-base-schedule-management-business process and drew a classification system for the work for schedule-information construction. The study also drew information that can be extracted from the BIM model among properties required to build certain information. The schedule is made upon consideration of information needed for schedule management, and information required to schedule a timeline of the construction project by process is established.
최근 건설 프로젝트가 대형화, 복잡화, 전문화되면서 다양한 참여자들 사이에서 발생하는 방대한 양의 정보 활용이 중요해 지고 있다. 발생되는 다양한 정보 중 일정정보는 건설프로젝트의 중심적인 정보이다. 건설현장 관련 참여자간 일정정보교환 미흡은 공기지연, 품질하자와 같은 건설생산성 저해 요인을 유발한다. 현재, 건설 산업에서는 건축물의 전 생애 주기 동안 필요한 데이터를 생산하고 관리하는 BIM(Building Information Modeling)에 대한 관심이 높아지고 있다. 본 연구는 BIM을 기반으로 건설공사의 일정정보를 체계적으로 관리 할 수 있는 일정관리 정보 체계를 구축하는 것이다. 이를 위해 BIM적용 일정관리 업무 프로세스를 구축하였으며, 일정정보를 구축하기 위한 작업분류체계를 도출 하였다. 또한 일정정보 구축에 필요한 속성 중 BIM모델에서 추출 할 수 있는 정보를 도출하고, 일정관리에 필요한 속성정보와 연계하여 일정을 생성 하고 공사 진행 시점별 일정관리를 위한 필요 정보를 제시한다.