Browse > Article
http://dx.doi.org/10.5516/NET.2011.43.1.089

DEVELOPMENT OF AN IMPROVED INSTALLATION PROCEDURE AND SCHEDULE OF RVI MODULARIZATION FOR APR1400  

Ko, Do-Young (Nuclear Engineering & Technology Institute)
Publication Information
Nuclear Engineering and Technology / v.43, no.1, 2011 , pp. 89-98 More about this Journal
Abstract
The construction technology for reactor vessel internals (RVI) modularization is one of the most important factors to be considered in reducing the construction period of nuclear power plants. For RVI modularization, gaps between the reactor vessel (RV) core-stabilizing lug and the core support barrel (CSB) snubber lug must be measured using a remote method from outside the RV. In order to measure RVI gaps remotely at nuclear power plant construction sites, certain core technologies must be developed and verified. These include a remote measurement system to measure the gaps between the RV core-stabilizing lug and the CSB snubber lug, an RVI mockup to perform the gap measurement tests, and a new procedure and schedule for RVI installation. A remote measurement system was developed previously, and a gap measurement test was completed successfully using the RVI mockup. We also developed a new procedure and schedule for RVI installation. This paper presents the new and improved installation procedure and schedule for RVI modularization. These are expected to become core technologies that will allow us to shorten the construction period by a minimum of two months compared to the existing installation procedure and schedule.
Keywords
RVI Modularization; Installation Procedure; Installation Schedule; APR1400; RVI Mockup;
Citations & Related Records

Times Cited By Web Of Science : 0  (Related Records In Web of Science)
Times Cited By SCOPUS : 0
연도 인용수 순위
  • Reference
1 Lee, Y.-Y., Kim, D.-G., Development of combined modularization technology for APR+ (Advanced Power Reactor) in Korea, Report of international conference on opportunities and challenges for water cooled reactors in the 21 century, Vienna, Austria, 2009.
2 Do-Young Ko, Jae-Gon Lee, Development of a Remote Measurement System for the gap between RV and CSB for RVI-modularization, Nuclear Engineering and Design 240, pp. 2912-2918, 2010.
3 Mun, T.-Y., Kim, K.-K., Sun, W.-S., Kim, T.-Y., Hwang, G.-H., Design development of steel plate concrete modularization for the advanced PWR in Korea, The 16th pacific basin nuclear conference, Tokyo, Japan, 2008.
4 Noh, S.-H., Lee, H.-W., Kim, C.-H., Development of the SC module construction for nuclear power plants in Korea, The 16th pacific basin nuclear conference, Tokyo, Japan, 2008.
5 Ricciuti, R., Fairclough, N., Hiebert, L., Elgohary, M., Yu, S.K.W., ACR constructability : increasing confidence in project objectives, The 12th international conference on nuclear engineering, Arlington, Virginia, United States, 2004.
6 Ijichi, H., Yamashita, T., Tsutagawa, M., Mori, H., Ooshima, N., Miura, J., Kanechika, M., Miura, N., Development of Advanced Concept for Shortening Construction Period of ABWR Plant, The 10th international conference on nuclear engineering, Arlington, Virginia, United States, 2002.
7 Elgohary, M., Fairclough, N., The ACR : Advanced design features for a short construction schedule, The 17th international conference on structural mechanics in reactor technology, Brno, Czech Republic, 2003.
8 Elgohary, M., Choy, E., Yu, S.K.W., Advanced construction methods in ACR, Canadian Nuclear Society Bulletin, Vol. 23 Issue 4, pp. 33-36, 2002.
9 Korea Electric Power Research Institute, Construct ability Improvement for Nuclear Power Plants, TR-95ZJ02-97-41, Korea Electric Power Research Institute, 1997.
10 Sieradzki, F. H., Optoelectronic inventory system for special nuclear material, SAND-93-2750, Sandia National Labs., Albuquerque, NM, United States, 1994.
11 Yee, F., Byrne, J., Soulard, M., Moleschi, R., Akagi, K., Report of ACR-1000-Designed for constructability, International conference on opportunities and challenges for water cooled reactors in the 21 century, Vienna, Austria, 2009.
12 Korea Hydro & Nuclear Power Company, Construction Study Report for Development of Next Generation Reactor, TR.A99NJ13.P2002.Shin2, pp. 633-672, Korea Hydro & Nuclear Power Company, 2002.
13 ABB-CE, Support Work Agreement Work Order Delivery, H-4, Korea Electric Power Corporation, 1995.
14 Jae-Gon Lee, Do-Young Ko, Yong-Chul Kang, A Study on the Remote Measuring Scheme for Modularization, Korea Nuclear Society Autumn Meeting, Kyeongju, 2006.
15 Do-Young Ko, Jae-Gon Lee, Yong-Chul Kang, Sung-Hwan Kim, Development of a measurement system of gap between CSB and RV to shorten a nuclear reactor installation period, Nuclear Engineering and Design 239, pp. 495-500, 2009.   DOI
16 Mun, T.-Y., Sun, W.-S., Kim, K.-K., Lee, U.-K., A Study on the Construct ability of Steel Plate Concrete Structure for Nuclear Power Plant, Proceedings of the Korean Nuclear Society Spring Meeting, Daejeon, Korea, 2008.
17 Korea Hydro & Nuclear Power Company, The Development of Modularization Technology for Reactor Internals, TR-S05NJ02-J2009-58, pp. 26-135, Korea Hydro & Nuclear Power Company, 2009.