• Title/Summary/Keyword: construction risk

Search Result 1,895, Processing Time 0.028 seconds

A study on the Importance of Risk Factor for Falling Accident in Construction Site (건설현장 추락재해의 위험요인 중요도 분석 연구)

  • Kim, Do-Su;Shin, Yoon-Seok
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2018.11a
    • /
    • pp.63-64
    • /
    • 2018
  • The construction industry is one of the most prolific disaster-prone industries, particularly those that suffer from falling disasters compared to other industries. The safety accident at the construction site leads to social problems caused by massive loss of life and property, so it needs to be extra careful. The reason why falls are the most frequent accidents of the types of construction accidents is due to the analysis of the risk factors of safety accidents and the development of various construction methods. Therefore, in this study, the accident case for the fallen victims of construction site was analyzed and the risk factor was selected. Based on the safety expert survey, an importance analysis was performed. In conclusion, this study analyzes various risk factors that affect the occurrence of falls, identifies the importance of each factor, and presents basic data for safety accident prevention activities.

  • PDF

Risk Analysis in Tender Stage for Successful Construction Project in China (중국건설시장에서의 성공적인 발주를 위한 입찰단계 리스크 분석)

  • Liu, Yue-Fei;Oh, Jae-Hun;Huh, Young-ki
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.05a
    • /
    • pp.140-141
    • /
    • 2015
  • Although the depression of oversea construction market becomes more serious recent years, asian construction market is relatively dynamic, particularly in china. However, few research has been conducted about how to manage construction projects in china as foreign developers. Four important risks are identified from series of surveys using the WBS-RBS method, the result shows that the main risk of tender stage is 'Tender max price error', ' Bill of quantities error', 'Unusual low price' and 'Moral risk' respectively.

  • PDF

Analysis of Primary Internal and External Risk Factors According to the Accident Causes in Construction Site (건설현장의 사고원인에 따른 내·외부 리스크 핵심 요인 분석)

  • Yu, Yeong-Jin;Kim, Taehui;Son, Kiyoung;Lee, Kyoung-Hun;Kim, Ji-Myong
    • Journal of the Korea Institute of Building Construction
    • /
    • v.16 no.6
    • /
    • pp.519-527
    • /
    • 2016
  • The demand of construction risk analysis is rapidly increased to improve the competitiveness of construction companies and the sound management of the construction project. However, estimating the amount and uncertainty of the risk is difficult due to the wide range of risks in the construction industry. Moreover, most of the research on risk management of construction risk is only focused on the causes of risk without separate the internal and external risk. This study statistically analysis the internal risk and external risk based on the accidents cases which are caused at construction sites to define the difference and importances of the risk. An accident cause analysis and T-test analysis are carried out to reach the goal of study. The results of the study are expected to be used as a guideline of construction project risk analysis.

Weight Evaluation of Risk Factors for Early Construction Stage (초기 건설공사 리스크인자의 중요도 산정)

  • Hwang Ji-Sun;Lee Chan-Sik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.2 s.18
    • /
    • pp.115-122
    • /
    • 2004
  • This study identifies various risk factors associated with activities of early construction stage, then establishes the Risk Breakdown Structure(RBS) by classifying the risks into the three groups; Common risks, risks for Earth works, and risks for Foundation works. The Common risks are identified and classified by considering various aspects of the early construction stage such as financial, political, constructional aspects, etc. The risks for Earth works and Foundation works are identified in detail by surveying technical specifications, relevant claim cases and interviewing with experts. These risks are classified based on the Wok Breakdown Structure(WBS) of the early construction stage. The WBS presented in this study classifies the works of early construction stage into four categories; excavation, sheeting works, foundation works, footing works. This study suggests a risk analysis method using fuzzy theory for construction projects. Construction risks are generally evaluated as vague linguistic value by subjective decision making. Fuzzy theory is a proper method to quantify vague conditions of construction activities. Therefore, this study utilizes fuzzy theory to analyse construction risks. The weight of risks is estimated by reflecting the interrelationship among risk factors from absolute weights obtained by fuzzy measure into the relative weights by Analytical Hierarchy Process(AHP). The interrelationship is estimated by Sugeno-fuzzy measure.

The Study on the Risk Assesment of Formwork (거푸집공사 위험성 평가에 관한 연구)

  • 고성석;오준호
    • Journal of the Korean Society of Safety
    • /
    • v.17 no.3
    • /
    • pp.96-101
    • /
    • 2002
  • The object of risk assesment is to prevent the accident from arising. The main reason for risk assesment of construction work is to determine priority order of improvement plan about risky work. Formwork is a complicated process that determines the total duration of apartment construction, and occupies 10∼15% of total construction expense, and 17% of serious accidents occur during formwork. So, formwork occupies very importment roles in work sites, economical efficiency and safety. We need to identify the work type with a high risk of accidents, and to establish suitable safety counterplan and implement intensive safety management.

Risk Assessment and Contingency Prediction considering Work Characteristics for Modular Plant Construction Projects (모듈러 플랜트의 업무특성을 고려한 위험 평가 및 예비비 예측)

  • Kang, Hyunwook;Kim, Jongwook;Kim, Yongsu
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.5
    • /
    • pp.81-89
    • /
    • 2018
  • The purpose of this study is to assess the risk and predict the contingency for modular plant construction projects. Considering the work characteristics of the modular plant, The adapted research method is that suggest models for assessment impact of risk and predict the contingency considering risk. Based on the proposed models, It is selected one modular plant construction project and assessment impact of risk factors and predicted the contingency. The results of this study are as follows: Assessment the probability of occurrence of risk factors and intensity of impact, and extract 15 important risk factors. These are classified as Engineering, Procurement, Fabrication, Transportation, Construction phases to consider the work characteristics of the modular plant. The predicted contingency is that 6.739%(Engineering 2.850%, Procurement 6.225%, Fabrication 6.211%, Transportation 4.165%, Construction 8.168%) to prepare the basic business expense. The model is used as a way to derive quantitative results in the decision-making process for risk management in construction projects.

Analysis of Loss Costs and Risk Reserve due to Risk Events for Aircraft Runway Construction (활주로 건설공사의 위험사건에 따른 손실비용 및 위험예비비 분석)

  • Kang, Hyun Wook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.23 no.3
    • /
    • pp.25-35
    • /
    • 2022
  • The purpose of this study is to derive risk events that occurred during aircraft runway construction and analyze loss costs for project participants. For this purpose, design change data, contracted statement and completed statement were investigated. The results of this study are as follows: There were 12 risk events in the process of construction, 5 design errors and 7 construction errors. The increased construction costs due to such risk events were calculated as KRW 726 million. Of the KRW 726 million that was increased due to risk events, about 52.57% was spent by the ordering agency, and about 47.43% contractors. The increased construction costs due to such risk events are about 4.86% of the direct construction costs of KRW 14.9 billion. Based on the results derived from these case studies, a method for estimating reserve costs and construction costs considering risk events is presented.

A Development of Integrated Risk Management Model of Large Construction Projects (건설분야 통합 리스크관리에 관한 구성 모델)

  • Kim Chang-Hak;Park Seo-Young;Kang In-Seok
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.101-108
    • /
    • 2004
  • The results of the study include a computerized system and a systematic Process model for risk management and analysis. This study analyzes the present status of risk management in the construction industry, and then suggests reasonable methods for improved risk management plans. This study defines risk management procedures as preparation, identification, analysis, response and management to manage potential risks In the construction project. The modules for computerizing this system consist of planning, construction, application of WBS (Work Breakdown Structure) and RBS (Risk Breakdown Structure), and risk analysis. The method logy for analyzing construction risk uses fuzzy theory, and the scope of developed system is focused to the contractors. The risk management system suggested in this study operates on the Internet, for providing contractors with a useful risk management tool by online system, with web-based menus that is helpful for practical application.

  • PDF

An Analysis on the Safety Accident Network and Risk Level of Construction Machine and Equipment (건설기계·장비의 안전재해 네트워크 및 위험도 분석)

  • Shin, Won-Sang;Son, Chang-Baek
    • Journal of the Architectural Institute of Korea Structure & Construction
    • /
    • v.34 no.5
    • /
    • pp.35-42
    • /
    • 2018
  • In order to seek out methods to reduce safety accidents caused by construction machinery and equipment, this study collects data about safety accidents and draws main risk factors by construction from the data, through SNA. It aimed to suggest safety management points to be used in future construction fields, by analyzing risk index of such factors. The finding can be summarized: First, Backhoe Bucket is the risk factor for crash accidents of average workers in earth works; boring machines-maintenance is the risk factor for fall accidents of construction machinery operators in foundation works; bending machine-reinforcing rod processing is the risk factor for jamming accidents of reinforcing rod engineers in frame works; and mobile crane-hook is the risk factor for crash accidents of average workers in lifting works. Second, works can be arranged in turn, according to the risk index: earth, lifting, frame and foundation works. Risk factors can be also arranged according to the risk index: Backhoe in earth works, pile drivers in foundation works, bending machines in frame works and mobile cranes in lifting works. This study has some limits, in that it only analyzed main machinery/equipment, among various kinds of them, for earth, foundation, frame and temporary works (lifting works) and used data collected over three years. Therefore, it is necessary to conduct an analysis using big data, by collecting additional data about a lot of machinery/equipment in future construction fields.

Safety Management Information System in Construction Work - Focus on Apartment Work - (건설공사의 안전관리정보시스템 개발 - 아파트공사 중심으로 -)

  • Park, Jong-Keun
    • Journal of the Korean Society of Safety
    • /
    • v.24 no.6
    • /
    • pp.124-131
    • /
    • 2009
  • In any form of construction work, it is essential that accidents be prevented at every stage, from foundation preparation to build completion. For this, it is necessary to use models that can assess risk and provide instructions for safe work processes so that the risk of accidents is reduced. Currently, however, very few models can perform these tasks. In this paper, we present a model that assesses risk quantitatively by analyzing the risk factors involved in each stage of construction, such as foundation work, temporary work, structural work, equipment work, and finishing work. The model performs assessment based on examples of accidents and by investigating actual conditions during construction. In addition, we present in this paper a safety management system developed to assess risk during construction and to effectively train laborers.