• Title/Summary/Keyword: construction project management system

Search Result 1,505, Processing Time 0.035 seconds

IMPLEMENTATION OF TRL TOOLS TO KOREAN NATIONAL CONSTRUCTION AND TRANSPORTATION R&D PROJECTS FOR IMPROVING PRACTICAL USE

  • Namgyun Kim;Byungho An;Jaehong Choi;Hyunseok Lee;Sanghyuk Park;Yeasang Kim
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.608-615
    • /
    • 2013
  • The major countries including Korea extend the national investment on R&D and implement the business performance diffusion policy as the knowledge based competition age arrives recently. The necessity for risk management and systematic management system for R&D achievement have been appeared to prevent the failure as the R&D scale becomes larger as it was said. For this matter, the organization such as NASA and DoD in USA defines the Technology Readiness Level (TRL) as a quantitative accomplishment management index and utilize the Technology Readiness Assessment (TRA) system as a criterion. Such tool is evaluated as very effective in the R&D project purposed the practicalization. It is expected that the disadvantage of evaluation system which is oriented to the academic accomplishment in its contents of current research and to contribute greatly to the practicalization of outcomes when such technology readiness level concept is applied to Korean national construction and transportation R&D project. Accordingly, this study analyzed the concept of TRL·TRA, the characteristics and current evaluation management system of Korean national construction and transportation R&D project and suggested the construction and transportation R&D project TRL·TRA performance model to accomplish the practicalization purpose.

  • PDF

FUZZY APPROACH TO PROJECT DELIVERY SYSTEM SELECTION

  • F. Nasirzadeh;N. Naderpajouh;A. Afshar;A. Etesami
    • International conference on construction engineering and project management
    • /
    • 2007.03a
    • /
    • pp.662-671
    • /
    • 2007
  • Since variety of construction projects with their individual specifications could be handled through different procurement systems, selection of the most appropriate project delivery system is a vital step towards more efficient project execution. The appropriate selection of project delivery system may also ensure more competent management of the project. Its impacts are not only limited to the first stages of the project, as it could also influence pre-construction, construction and operational phases of the project. Among different approaches exerted for this purpose, none has taken uncertainty into account, despite the fact that during first stages of the project most of the selection factors are still uncertain and not clearly defined. This paper, hence, aims to provide a fuzzy insight into the project delivery system selection. Through this approach more tangible model of the evaluation process may be presented. Proposed fuzzy method is indeed a multi criteria decision making model, based on the group of criteria, assigned for the evaluation procedure. A case study is also conducted, based on the opinion of an invented group of the experts.

  • PDF

The Study of Project Management Information System Establishment for Construction (건설사업관리 정보시스템(PMIS)구축에 관한 연구)

  • Yoon Jae-Ho;Moon Young-Il
    • Korean Journal of Construction Engineering and Management
    • /
    • v.3 no.4 s.12
    • /
    • pp.132-138
    • /
    • 2002
  • Recently, utilization of PMIS(Project Management Information System) is in high demand as it is desired to advance the construction market through cost reduction and quality improvement within the given schedule. However, PMIS developed by individual projects are mostly evolving around construction progress status due to the temporary nature of development period and use of the system by project executers is no more than perfunctory that results in limiting the effective communication between the project owner, project manager and constructor. Therefore, the purpose of this paper is to review the PMIS developed so far, and present the direction for an effective PMIS.

Strategies for Facilitating Post-Construction Evaluation and Management System (건설공사 사후평가 제도 활성화 방안 수립)

  • Lee, Kang-Wook
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.379-380
    • /
    • 2023
  • The Post-Construction Evaluation and Management System has been operated over the past 20 years not only to analyze the performance of large-scale construction projects, and but also to provide useful reference data for future similar projects. Although the Post-Construction Evaluation and Management Center has been legally designated and operated since 2020, various problems have been occurring in the operation of the system. Accordingly, this study proposes strategies for facilitating Post-Construction Evaluation and Management System in terms of the following three aspects: (1) improving the implementation rate of post-construction evaluation; (2) improving the information management system related to post-construction evaluation; (3) improving the utilization of post-construction evaluation outcomes. Based on the results of this study, a specific action plan will be prepared, which is expected to contribute to the efficiency of construction project performance management in the future.

  • PDF

A STUDY ON ANALYSIS OF DELIVERY & CONTRACT SYSTEM FOR INTRODUCTION OF THE INTEGRATED PROJECT DELIVERY (IPD) TO KOREA - Focusing on Delivery and Contract of Public Works -

  • Sulmin Song;Seong-Ah Kim;Yea-Sang Kim;Sangyoon Chin
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.142-148
    • /
    • 2011
  • Recently, much attention has been increasingly paid to the efficiency of the delivery system in order to manage construction project in a smooth and effective way. The integrated plan in consideration of the life cycle of building is required for the effective and integrated management of information in a huge amount. To this end, collaboration between each field is indispensable from the beginning of project. But there is a limitation that the designer and the constructor sign the contract separately in the conventional delivery system. In the US, the recent trend is that the Integrated Project Delivery (IPD) has been introduced to improve the effectiveness of project management in an increasing number of the cases where project is implemented by utilizing the IPD. In Korea, there is also an increasing need to introduce the IPD for the integrated project management. Consequently, the purpose of this study is to examine and analyze the laws and the contracts that are applied to domestic cases of placing order and signing contract based on the concept and principle of the IPD before the actual introduction of the IPD. Based on such examination and analysis, this study intends to figure out the constraints to the introduction of the IPD. It is expected that the results of this study will be used as basic data for IPD-related study in the future.

  • PDF

Development of Major Functions of Visualization System for Construction Schedule Data in Plant Project (플랜트공사 관리 효율화를 위한 공정정보 시각화 시스템의 주요 기능 구성방안)

  • Kang, Leen-Seok;Moon, Hyoun-Seok;Ji, Sang-Bok;Lee, Tae-Sik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.1
    • /
    • pp.66-76
    • /
    • 2008
  • Plant project is a complex project that consists of civil engineering, building, mechanical and electronic works. The schedule management is one of important factors in plant project because the construction duration of the project is very short comparing with the other construction projects. Specially, 4D CAD system needs to visualize construction schedule information in those complex projects. This study suggests methodologies for improving 4D CAD functions by considering those project characteristics. To develop a plant 4D CAD system, this study includes to develop new functions by analyzing actual schedule information from the plant construction sites.

A Study on the Development of Project Management Information System for Mega Project (대형 건설사업에서의 사업관리정보시스템 구축에 관한 연구)

  • 윤은상;이화기
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.22 no.50
    • /
    • pp.243-255
    • /
    • 1999
  • A mega project such as an international airport construction generally consists of a number of sub-projects. Successful completion of this mega project requires project management information system(PMIS) because control and link of a number of component sub-projects is inevitable. Therefore, the role of PMIS should be more emphasized as the project is processed and managed by fast track concept where the design and construction work is performed concurrently. This study investigates and analyzes the present PMIS developed for the construction project of Inchon International airport. Based on this study, we can suggest the direction of PMIS for a mega project management and how to improve this kind of management information system.

  • PDF

THE RESEARCH ON CONCEPTUAL MODEL OF LNG PLANT PROJECT PLANNING EXPERT SYSTEM

  • Moon-Sun Park;Young-Ai Kim;Seung-Wook Lee;Sung-Ryul Bae;Hyun-Wook Kang;Byoung-Jun Min;Yong-Su Kim
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1570-1575
    • /
    • 2009
  • The purpose of this research is to propose the conceptual model of Scenario-based Project Planning Expert System which has not been used in domestic LNG plant industry. This research examines data on the plant project planning expert system of domestic and oversea, analyzes the components of project planning expert systems and benchmark excellent cases. The conceptual model of LNG plant project planning expert system is established through the procedure as has been noted above. The results of this research are as follows: First, this research draws out such components of LNG plant project planning expert system as feasibility, cost control, contract management and risk management. Second, this research proposes the conceptual model of LNG plant project planning expert system which core module is consist of feasibility evaluation, life cycle cost evaluation and decision making. Finally, each module of LNG plant project planning expert system would be integrated into the Scenario-based Project Planning Expert System.

  • PDF

10-10 Project Campaign: 10 Input Measures Influencing Project Outcomes

  • Choi, Jiyong;Kang, Youngcheol;Yun, Sungmin;Mulva, Stephen;Oliveira, Daniel
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.200-204
    • /
    • 2015
  • This paper presents 10 input measures influencing project outcomes. Construction Industry Institute (CII), a consortium of more than 130 project owner and contractor companies, has collected project-level data for over 20 years. Recently, CII has developed a new system measuring project-level performance and factors presumably influencing project performance. The system, called 10-10, collects data for 10 input and 10 output measures for capital projects. The input measures include planning, organizing, leading, controlling, design efficiency, human resources, quality, sustainability, supply chain, and safety. This paper provides theoretical background for these measures. Although the input measures have been known to impact on project outcomes such as cost and schedule, there has been no study quantitatively evaluating how they are operated in the construction industry. This study contributes to revealing the current status of their uses, which will be helpful in establishing strategies improving construction project performance.

  • PDF

A Development of Project Performance Predicting System(PPS) considering Construction Project Characteristics (건축 프로젝트의 특성을 고려한 성과 난이도 예측 시스템 개발)

  • Ko, Young-Jin;Cha, Hee-Sung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.1
    • /
    • pp.62-72
    • /
    • 2011
  • Currently, The failure of construction project is increasing to be caused by a changing construction environment. According to this circumstances, Researches of project success factors affecting performance have been presented to develop strategies for efficient construction project management in the construction industry. However, Conducting efficient construction project management is difficult because project manager could not know which project success factors can be improved or not. Especially, although the project characteristics were derived the level of difficulty for performance, research of the project characteristics which could not be improved as influence factor to performance is lacking. Therefore, This paper has developed the Performance Predicting System(PPS) with Fuzzy set theory to establish. PPS has been developed to establish efficient project management strategies and to save time and effort. As Contractor inputs the project characteristics, PPS can predict the level of difficulty of performance.