• 제목/요약/키워드: construction project management system

검색결과 1,505건 처리시간 0.03초

무선측위 기술을 활용한 원전 건설현장 인원 안전관리 시스템 개발 방안 (Development of Safety Management System Based on Location Determination Technology for Construction Workers in Nuclear Power Plant Construction Project)

  • 김우중;이상현
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2016년도 춘계 학술논문 발표대회
    • /
    • pp.239-240
    • /
    • 2016
  • The nuclear power plant construction project is a large-scale project that involved a daily maximum of thousands of workers. many equipment and laborers involved has been required consistently to minimize the need for safety through real-time safety management. But current nuclear power plant construction site is only managed to access of workers and equipments. The purpose of this study is the owner requirements reflects the characteristics of the nuclear power plant construction project integrated safety management system utilizing active RFID and GPS positioning technology.

  • PDF

대형공공공사에 J/V(Joint Venture)시스템의 합리적 도입을 통한 건설사업 효율화 전략 (A Strategy of Construction through Rationally Adapting JV(Joint Venture) in Large Public Constructions)

  • 이태식;김용천;박동찬;선우강;김열규
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2001년도 춘계학술대회 논문집
    • /
    • pp.24-29
    • /
    • 2001
  • Despite of the introduction some sorts of the contract and the bid method like CM(Construction management) that will be efficient to manage the construction project. Korean agencies limit to control project management to do large public constructions. In the case of Taiwan, THSRC is apply J/V system in the public construction project, they are accomplishing that expend optimal the cost and save the construction time. To success J/V it has two factors, one is risk management and another is sharing information of construction project. Therefore, we will study to introduce J/V system to our construction project.

  • PDF

시스템 다이내믹스를 이용한 건설성과 인과지도 개발 (Development of a Construction Performance Causal Map Using System Dynamics)

  • 강진영;박희성
    • 한국건축시공학회지
    • /
    • 제9권2호
    • /
    • pp.63-68
    • /
    • 2009
  • Construction Performance measurement and management has been interested by construction practitioners. However, current construction project management practices are related to short-term improvement plans rather than long-term and systematic approaches based upon performance analysis. AR a result, there is a need for developing of a collaborative plan over project life cycle. Therefore, this paper reviews extensive literature and proposes the construction performance estimating model using a system dynamics. The paper proposes casual maps for planning, design, procurement, and construction phases. Each casual map includes all performance indicators and factors that impact on performance directly or indirectly. These casual maps that were developed by system thinking will enhance the understanding of the relationships among performances and factors. After further data gathering, these models can be used to estimate construction performance and eventually these will save project costs and shorten project schedule.

도심지 소규모 재개발·재건축공사시 흙막이가시설 사고예방을 위한 건설사업관리 방안 연구 : 상도유치원 붕괴사고 중심으로 (A Study on the Management of Construction Project for Preventing Accidents of Reclamation : basic on the collapse of Sangdo Kindergarten)

  • 오세길;박주문
    • 도시과학
    • /
    • 제8권1호
    • /
    • pp.33-44
    • /
    • 2019
  • The purpose of this study is to investigate the cause of repeated accidents through the investigation and analysis of the collapse cases of domestic earthquakes in order to prevent the earthquake disaster in the urban redevelopment and reconstruction. It is designed and constructed to draw out various problem factors and to find solutions to these problems. And the contents related to various laws and systems of the construction project management stage. Especially. In the management of the construction management centered on the safety management and quality control of the technical aspect design, supervision, construction phase through the cause of the accident and improvement measures based on the investigation report of the collapse of the construction site near Sangdo Kindergarten in Seoul. Supervisor. And constructors should be settled on the responsibility and responsibility of God. In order to achieve the purpose of the project, a system is established to link worker-centered occupational safety and health management with technology-based safety construction management, and analysis of how the quality control of the earthquake prevention affects safety construction management The purpose of this study is to prepare the optimum management plan of construction business.As a result of this study, it is aimed to accomplish the purpose of small scale redevelopment and reconstruction construction project by providing optimization method in the stage of construction project management in order to prevent collapse caused by differences in design,Is expected.

A MODEL OF RISK MANAGEMENT PLAN AND SYSTEM FOR THE CONSTRUCTION PHASE

  • Seon-Gyoo Kim;Chan-Jeong Park ;Moon-Serk Yang;Jin-Bong Kim ;Hyung-John Shin
    • 국제학술발표논문집
    • /
    • The 1th International Conference on Construction Engineering and Project Management
    • /
    • pp.341-346
    • /
    • 2005
  • After the IMF shock, some major construction companies in Korea have been motivated to avoid and mitigate various risk factors which could be critical and catastrophic events to corporate revenue and organization internally or externally. It means that they are trying to introduce and set up a risk management plan and system suitable to their organization and culture. L construction co. ltd. is one of major construction companies that have been searching methodologies or technologies to manage various risk factors surrounding corporate marketing and project operation. This paper presents an unique approach to develop a model of risk management plan and system suitable to L construction itself focused on the construction phase.

  • PDF

I-프로젝트의 건설사업 관리(Construction Management) 적용사례 (A Case Study of the Construction Management Applied to I-Project)

  • 김종훈;서봉환
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2001년도 학술대회지
    • /
    • pp.102-112
    • /
    • 2001
  • 국내에 CM이 도입된지 $5\~6$년이 지나 제법 많은 CM사례들이 생겼으나 발표된 사례는 관공사 몇 개 프로젝트에 불과한 실정이다. 본 인사동 I-프로젝트는 외국인 발주자를 대신하여 CM을 수행하는 현장으로 공기 및 공사비 면에서 여러 가지 제약이 있었지만 선진관리기법을 적용하여 발주자의 만족은 물론 모든 프로젝트참여자가 Win-Win할 수 있는 성공적인 결과를 도출해낸 프로젝트이다. CM사는 공기단축, 원가절감 및 품질향상을 위하여 많은 선진기법을 적용하였으며, 특히 지역, 시간의 한계를 극복할 수 있는 Web-based Project Management System의 적용, 층간 Cycle 공정관리의 적용 및 Is09002에 따른 체계적인 품질관리, 공사실명제 및 공정별 준공시스템의 적용으로 프로젝트의 효율을 증대시켰다. 본 프로젝트를 수행하면서 CM에 대한 이해부족, Communication 및 Team Work 부족, 프로젝트 참여자간의 모호한 업무 분장 등으로 초기에는 문제가 발생하였으나 지속적인 교육과 협의를 통하여 상호 이해와 신뢰를 구축할 수 있었으며 프로젝트 참여자간에 목표를 공유하고 신뢰 속에서 업무를 추진할 수 있었다 본 프로젝트의 성공적인 수행이 국내 CM정착에 좋은 사례가 되었으면 한다.

  • PDF

프로젝트 성과, 사용자 만족도 및 재사용의도에 미치는 PMIS의 산업별 영향 비교 (Examining the PMIS Impacts on the Project Performance, User Satisfaction and Reuse Intention among the Project based Industries)

  • 박소현;이아연;김승철
    • 산업경영시스템학회지
    • /
    • 제44권3호
    • /
    • pp.276-287
    • /
    • 2021
  • Project Management Information System (PMIS) is a special purpose information system that is created to provide useful information for project managers and participants to make effective and efficient decision making during projects. The use of PMIS is increasing in project based industries such as construction, defense, manufacturing, software development, telecommunication, etc. It is generally known that PMIS helps to improve the quality of decision making in project management, and consequently improves the project management performance. However, it is unclear what are the difference of PMIS impacts between industries, and still need to be studied further. The purpose of this study is to compare the impact of PMIS on project management performance between industries. We assume that the effects of PMIS will be different depending on the industry types. Five hypotheses are established and tested by using statistical methods. Data were collected by using a survey questionnaire from those people who had experience of using PMIS in various project related industries such as construction, defense, manufacturing, software development and telecommunication. The survey questionnaire consists of 5 point scale items and were distributed through e-mails and google drive network. A total of 181 responses were collected, and 137 were used for analysis after excluding those responses with missing items. Statistical techniques such as factor analysis and multiple regression are used to analyze the data. Summarizing the results, it is found that the impacts of PMIS quality on the PM performance are different depending on the industry types where PMIS is used. System quality seems to be more important for improving the PM performance in construction industry while information quality seems more important for manufacturing industry. As for the ICT and R&D industries, PMIS seems to have relatively lesser impact compared to construction and manufacturing industries.

Critical Success Factors for Project Management Information System in Construction

  • Lee, Seul-Ki;Yu, Jung-Ho
    • Journal of Construction Engineering and Project Management
    • /
    • 제1권1호
    • /
    • pp.25-30
    • /
    • 2011
  • With a focus on different aspects of PMIS in construction projects, various sets of critical success factors (CSFs) have been suggested in the literature such as IS Success Model by various researchers. It is crucial to explore the relative importance and groupings of these factors. This paper aims to identify CSFs associated with Project Management Information System (PMIS) in construction projects, and explore their ranking and underlying relationship. CSFs for PMIS identified through a literature review, and consolidated by interviews and pilot studies with professionals in construction industry. A questionnaire instrument was sent out to experienced users (Construction Manager and Constructor) in Korea, and 253 completed questionnaires were retrieved. To increase the generalizability of the results, the respondents were spread across construction site. Using factor analysis and considering the high importance of the factor, CSFs were grouped into three dimensions. All these three groupings and their relationship were included in a framework for successful PMIS in construction projects. These findings help to clarify what the high prioritized factors are, and could also be used as an assessment tool to evaluate the performance of PMIS and thus help to identify areas for improvement.

CRITIAL SUCCESS FACTORS FOR PROJECT MANAGEMENT INFORMATION SYSTEM IN CONSTRUCTION

  • Jung Ho Yu;Seul Ki Lee
    • 국제학술발표논문집
    • /
    • The 4th International Conference on Construction Engineering and Project Management Organized by the University of New South Wales
    • /
    • pp.498-503
    • /
    • 2011
  • With a focus on different aspects of PMIS in construction projects, various sets of critical success factors (CSFs) have been suggested in the literature such as IS Success Model by various researchers. It is crucial to explore the relative importance and groupings of these factors. This paper aims to identify CSFs associated with Project Management Information System (PMIS) in construction projects, and explore their ranking and underlying relationship. CSFs for PMIS identified through a literature review, and consolidated by interviews and pilot studies with professionals in construction industry. A questionnaire instrument was sent out to experienced users (Construction Manager and Constructor) in Korea, and 253 completed questionnaires were retrieved. To increase the generalizability of the results, the respondents were spread across construction site. Using factor analysis and considering the high importance of the factor, CSFs were grouped into three dimensions. All these three groupings and their relationship were included in a framework for successful PMIS in construction projects. These findings help to clarify what the high prioritized factors are, and could also be used as an assessment tool to evaluate the performance of PMIS and thus help to identify areas for improvement.

  • PDF

THE ROLE OF USING A TABLET COMPUTER FOR MOBILE COMMUNICATION ON CONSTRUCTION SITES

  • Ruvinde R. Kooragamage;John M. Kelsey;Simon Julier
    • 국제학술발표논문집
    • /
    • The 5th International Conference on Construction Engineering and Project Management
    • /
    • pp.531-538
    • /
    • 2013
  • The coordination and control of construction projects is vital if a project is to be a success. Almost all analysis has shown that these can only be achieved if good quality communication can be maintained on a construction site. This research focuses on the role that tablet computers could play in enhancing this communication. The following points are investigated in this paper: (a) Whether a tablet computer can enable users to monitor project progress more efficiently than traditional methods, (b) How the tablet computer fits within the project management iron triangle in construction, (c) The two different psychological impacts of information transmission for the end user using a tablet computer (i) The expectancy to transmit information frequently and rapidly from tablet computer users to project members whilst working onsite (ii) The mode of information transmission to the cognition of the transmitted information to the tablet computer. Through the use of structured interviews and questionnaires, the opinions of individuals within various disciplines in construction were canvassed. The approach adopted in this paper deals with understanding both the soft and hard issues for deploying such a system. This research enabled the authors to develop a base framework incorporating the key factors which are relevant for implementing a tablet computer based on information flows primarily.

  • PDF