• 제목/요약/키워드: construction project management system

검색결과 1,505건 처리시간 0.024초

Creating Knowledge from Construction Documents Using Text Mining

  • Shin, Yoonjung;Chi, Seokho
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.37-38
    • /
    • 2015
  • A number of documents containing important and useful knowledge have been generated over time in the construction industry. Such text-based knowledge plays an important role in the construction industry for decision-making and business strategy development by being used as best practice for upcoming projects, delivering lessons learned for better risk management and project control. Thus, practical and usable knowledge creation from construction documents is necessary to improve business efficiency. This study proposes a knowledge creating system from construction documents using text mining and the design comprises three main steps - text mining preprocessing, weight calculation of each term, and visualization. A system prototype was developed as a pilot study of the system design. This study is significant because it validates a knowledge creating system design based on text mining and visualization functionality through the developed system prototype. Automated visualization was found to significantly reduce unnecessary time consumption and energy for processing existing data and reading a range of documents to get to their core, and helped the system to provide an insight into the construction industry.

  • PDF

시설물 유지관리를 위한 BIM데이터 전달의 문제점 (The problem of using BIM data for facility management)

  • 안효경;이슬기;유정호
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2012년도 춘계 학술논문 발표대회
    • /
    • pp.139-140
    • /
    • 2012
  • Facility Management (FM) is a project phase to maintenance and to increase the qualities of product which is planned on the design phase and ensured on the construction phase. In addition, since the approximate time occupied in operation and maintenance phase is the longest from construction project as total approximate cost is about 85% of whole the project, it could be managed and realized primarily. The information of facility is not created on the specific point of project, but it might be created on the whole process of subject project widely. Thus, as the information could not be lost and it can be delivered into computer aided facility management system, it is necessary to manage the facility information. This paper proposed the necessities and the problems of BIM-based data interoperability on the Korean construction projects.

  • PDF

공종분류체계를 활용한 도시철도 시설물 유지관리시스템 개발 (The Development of Urban Metro Maintenance Facility System Using Construction Classification System Management)

  • 현지훈;양병수;문성우
    • 한국건설관리학회논문집
    • /
    • 제13권4호
    • /
    • pp.69-77
    • /
    • 2012
  • 건설정보를 효과적으로 관리하기 위해서는 데이터 생성부터 유지관리까지 전 과정을 관리해야 한다. 그러나 사업관리정보시스템 (PMIS, Project Management Information System)은 설계를 포함하여 시공단계에서 사업관리를 중심으로 운영하고 있어서 유지관리와의 연계가 부족하다. 본 논문에서는 유지관리분류와 도시철도시설물 공종분류를 활용하여 시공단계에서 발생하는 데이터를 유지관리 활동에 활용하는 프로세스를 제시한다. 유지관리분류와 공종분류를 연계함으로써 시공정보와 유지관리정보를 일괄적으로 추적할 수 있으며, 유지관리 시 필요한 시공정보를 손쉽게 활용할 수 있다. 또한 사업관리정보시스템과 유지관리정보시스템(MMIS, Maintenance Management Information System)을 연동할 수 있으며, 시공정보를 건설사업의 라이프싸이클 정보를 관리할 수 있게 하여 생애비용을 추적관리 할 수 있도록 돕는다. 본 논문에서는 유지관리정보시스템 프로토타입을 개발했으며, 업무적용 시 타당성이 있음을 보여줬다.

린(Lean) 건설 개념을 도입한 TPMS 시스템에 대한 소개 (Introducing TPMS on applying Lean Construction)

  • 박찬정;정희원;김상철
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2006년도 정기학술발표대회 논문집
    • /
    • pp.150-153
    • /
    • 2006
  • GS건설은 업계 최초로 EVMS(Earned Value Management System) 관리기법을 바탕으로 공정과 손익을 관리하는 통합 공사관리 시스템인 PMS (Project Management System)을 개발, 1997년부터 전 현장에 적용하여 왔으며, 최근에는 현장업무를 중심으로 일 단위 공정관리 기법 적용과 자재, 인력, 장비의 적시 투입(JIT, Just in Time)을 통하여 보다 효과적인 공사관리를 할 수 있도록 시스템의 지원을 실현하기 위해 TPMS(Total Project Management System)로 확대 구축 중에 있다. TPMS는 린 건설의 주요 사상인 Shielding(할 수 있는 일만 지시하라)과 Make-Ready Process(할 수 있는 일이 많아지도록 "사전준비"를 철저히 하라)를 구현하고 있으며, 이를 통해 현장에서 실제로 진행하고 있는 하루하루의 업무를 시스템에서 계획하고 관리할 수 있도록 구축하고, 그날의 업무진행에 관계된 자재, 인력, 장비의 계획과 실행을 지원하여, 비 가치창출 과정을 최소화하는 역할을 담당하고 있다. 본 자료는 GS건설에서 현재 구축한 TPMS의 개념을 소개하고, 이를 실제 구축한 사례를 보여줌으로써, 새로운 건설문화를 선도하고, 건설산업의 경쟁력을 높이는 데 일조 하고자 한다.

  • PDF

CM의 요소기술을 이용한 프로젝트의 생산능력향상 (The Method Improving the Productivity of a Project through Construction Management Techniques)

  • 윤태권;정재영
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2005년도 춘계 학술기술논문발표대회 논문집
    • /
    • pp.133-136
    • /
    • 2005
  • This study provides the method how to improve the productivity of a project using CM's constitutive methods. Construction industry in Korea was protected by the government and they have been grown with only their construction technology until today. It results Korean Construction is behind the advanced countries in terms of Engineering fields and construction management skills. This study compares the difference between the construction system of Korea and Europe and Asia. And then, it proposes the method how to compete with the other countries. which introduce the CM technique into the construction project in the beginning stage. Hopefully, this study is recognised as the basic strategy to improve the capability of Korean construction management.

  • PDF

건설 프로젝트 리스크 관리 효율성 향상을 위한 성과측정시스템(PPMS) 개발 (Development of Construction Project Performance Management System(PPMS) Considering Project Characteristics)

  • 차희성;김기현
    • 한국건설관리학회논문집
    • /
    • 제14권1호
    • /
    • pp.82-90
    • /
    • 2013
  • 건설 산업의 속성상 프로젝트의 성과를 정량적으로 분석하기 위해서는 다양한 영향인자에 대한 고려가 필수적이다. 프로젝트의 특성과 성과와의 관계를 파악하고, 프로젝트에 가장 적합한 관리기법을 적용시켜서 프로젝트의 성과를 향상시키기 위해서는 성과관련 정보를 축적시켜 관리하기 위한 시스템적인 접근이 요구되고 있다. 그럼에도 불구하고 많은 성과관련 시스템들은 성과결과의 분석에만 치중하여 프로젝트의 특성이나 관리기법 등 성과에 영향을 미치는 인자에 대한 심도 있는 분석방법과 접근방식에 대한 고려 부족으로 인해 성과시스템의 활발한 적용을 기대할수 없었다. 이에 본 연구는 건설 프로젝트의 특성을 고려하여 성과를 사전에 예측하고 성과체계를 정량적으로 모델링할수 있는 성과정보시스템을 개발하는 데 목적을 두었다. 이를 위해 실제 사례프로젝트의 성과관련 정보를 바탕으로 성과결과와 프로젝트 특성, 관리기법 간의 상관관계를 분석함으로써 해당 프로젝트에 가장 적합한 관리기법을 도출할수 있는 방안을 수립하였다. 그 결과, 성과영역별로 다양한 관점에서 프로젝트의 성과비교가 가능할 수 있는 정량화 방안을 정립하였고, 상관관계 분석을 통해 성과예측이 가능한 모델을 제안하였으며, 기존 데이터 분석을 통해 최적 관리기법을 선정할수 있는 시스템을 개발하였다. 웹기반 프로그램으로 구축된 시스템은 향후 데이터베이스의 지속한 관리와 보완을 통해서 성과정보의 양을 확대시킨다면 통계적으로 유의미한 결과를 바탕으로 신뢰성 있는 프로젝트 성과 관리를 도모할수 있을 것으로 사료된다.

DEVELOPMENT OF BIM-BASED DECISION-MAKING SUPPORT SYSTEM FOR APARTMENT REMODELING

  • Dong-Gun Lee;Sik Kim;Hee-Sung Cha;Ju-Yeoun Han
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.1117-1123
    • /
    • 2009
  • Compared with other industries, the construction Industry has many parties(A/E/C) as well as many types of construction activities. Especially, as for the remodeling project, the owner group the remodeling union consists of various stakeholders union and requiring the additional activities of demolition except for the existing new building construction project. Like this, the remodeling project has its own characteristics different from a new building construction project. As for the remodeling project, the Owner's decision making for a remodeling alternative has to be preceded, and other parties are required to propose a remodeling alternative which satisfies the Owner's requirements. However, because of time constraints, many types of problems occur during the decision-making process. In consideration of this, in this research, the authors would like to suggest a decision-making support system to help the Owner's decision-making in the early stage of a remodeling project. For this paper purpose of a remodeling decision-making framework based on Building Information Modeling(BIM) was suggested to help with the Owner's decision-making for each remodeling item and the decision-making support system was evaluated through Case Study.

  • PDF

Industrialized Building Systems for the Kingdom of Saudi Arabia

  • Santoso, Try P.;Trigunarsyah, Bambang;Hassanain, Mohammad A.;Tuffaha, Firas
    • 국제학술발표논문집
    • /
    • The 7th International Conference on Construction Engineering and Project Management Summit Forum on Sustainable Construction and Management
    • /
    • pp.73-79
    • /
    • 2017
  • Rapidly expanding population in the Kingdom of Saudi Arabia has a massive impact to put pressure on the shortage of housing and existing infrastructure. With average population growth rate of 1,9% yearly, the population in Saudi Arabia is projected to increase from 31 million in 2015 to 37 million in 2025. According to the housing ministry, Saudi Arabia needs to provide 3.3 million units to meet the demand in 2025, which is about 300,000 unit a year. In the past 40 years, using the conventional construction method, the Saudi construction industry was only able to build about 150,000 units per year. To meet the demand gap for the housing shortage, a new approach and innovation in construction methods are needed. Industrialized construction as an approach in construction methods has been studied and implemented in some countries that experienced similar corncerns. Industrialized construction can be defined as the implementation of manufacturing methods to construction-related activities to improve quality, reduce cost and project duration. Compared to the conventional construction method, prefabrication as industrialized construction methods has reduced construction labor on-site by 9.5%, construction project duration by 20%, and construction waste by 56%. It improves the quality, durability and cost saving not only for construction project owners, but also construction contractors. This paper discusses the possibility of 'industrialization' of building system in the Kingdom of Saudi Arabia as a solution for the housing shortage. It is an initial part of a study aims to develop a framework to develop industrialized building system in the Kingdom of Saudi Arabia. The is paper based on extensive literature review and case studies.

  • PDF

건설산업의 물류관리 체계 개선을 위한 차세대 지능형 건설 물류관리 시스템 개발 현황 (An Introduction of Development for Next Generation Logistics Management System in Construction Project)

  • 권순욱;진상윤;김예상
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2008년도 정기학술발표대회 논문집
    • /
    • pp.99-105
    • /
    • 2008
  • 초대형 건설공사에서 건설자재에 대한 물류관리는 성공적인 프로젝트 수행에 결정적 역할을 한다. 비효율적인 물류관리는 엄청난 비용의 자재 손실, 품질저하, 재시공 원인제공, 공기연장, 클레임 발생 등 여러 가지 리스크를 야기 시켜 결국 발주자와 시공사 모두에게 손해를 끼칠 뿐만 아니라 국가적으로도 큰 손실을 발생시킬 수 있지만, 효과적인 물류관리체계를 구축한다면 설계안이 까다롭고 발주자의 설계변경이 빈번하다 할지라도 프로젝트 리스크를 최소화시켜 자재 손실율을 최소화하고, 품질에 부합한 시공과 공기단축 등을 통해 발주자와 시공사 모두에게 상호 성공적인 프로젝트가 될 수 있을 것이다. 이에 본 연구에서는 도심지 초고층 건설과 같은 초대형 건설공사에서의 물류관리 문제점을 해결하기 위해 수행되고 있는 차세대 지능형 건설 물류관리 자동화 체계개발 연구에 대한 연구진행 주요 내용을 소개하고, 향후 건설산업에서 물류관리 방안의 비전을 제시하는 것에 그 연구의 목적이 있다.

  • PDF

Development of a methodology for analysing and quantifying the impact of delay factors affecting construction projects

  • Shebob, Abdulhamid;Dawood, Nashwan;Shah, Raj K.
    • Journal of Construction Engineering and Project Management
    • /
    • 제2권3호
    • /
    • pp.17-29
    • /
    • 2012
  • Delays are one of the biggest problems facing by the construction industry and they have significant financial and social impact in construction projects. The paper presents a framework of Delay Analysis System (DAS) with the aim of analysing the impact of delay factors in Libyan construction projects. The system has designed by integrating the possible delay factors, critical activities of a project using@risk simulator. A case study of building project was demonstrated to identify the impact of delays and the sensitivity of delay factor. The case study result showed that the project might be delayed by 97 to 103 days in comparison to the planned duration. The developed DAS is a tool for analysing and identify the impacts of delay factors and assist to construction manager to take necessary measure in reducing the delay impact. The paper provides a methodology for analysing the possible delay impact in a construction project and informing to construction manager in advance of the possible delay factors.