Development of Safety Management System Based on Location Determination Technology for Construction Workers in Nuclear Power Plant Construction Project (무선측위 기술을 활용한 원전 건설현장 인원 안전관리 시스템 개발 방안)

  • KIM, WooJoong;Lee, Sang-Hyun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2016.05a
    • /
    • pp.239-240
    • /
    • 2016
  • The nuclear power plant construction project is a large-scale project that involved a daily maximum of thousands of workers. many equipment and laborers involved has been required consistently to minimize the need for safety through real-time safety management. But current nuclear power plant construction site is only managed to access of workers and equipments. The purpose of this study is the owner requirements reflects the characteristics of the nuclear power plant construction project integrated safety management system utilizing active RFID and GPS positioning technology.

  • PDF

A Strategy of Construction through Rationally Adapting JV(Joint Venture) in Large Public Constructions (대형공공공사에 J/V(Joint Venture)시스템의 합리적 도입을 통한 건설사업 효율화 전략)

  • 이태식;김용천;박동찬;선우강;김열규
    • Proceedings of the KSR Conference
    • /
    • 2001.05a
    • /
    • pp.24-29
    • /
    • 2001
  • Despite of the introduction some sorts of the contract and the bid method like CM(Construction management) that will be efficient to manage the construction project. Korean agencies limit to control project management to do large public constructions. In the case of Taiwan, THSRC is apply J/V system in the public construction project, they are accomplishing that expend optimal the cost and save the construction time. To success J/V it has two factors, one is risk management and another is sharing information of construction project. Therefore, we will study to introduce J/V system to our construction project.

  • PDF

Development of a Construction Performance Causal Map Using System Dynamics (시스템 다이내믹스를 이용한 건설성과 인과지도 개발)

  • Kang, Jin-Young;Park, Hee-Sung
    • Journal of the Korea Institute of Building Construction
    • /
    • v.9 no.2
    • /
    • pp.63-68
    • /
    • 2009
  • Construction Performance measurement and management has been interested by construction practitioners. However, current construction project management practices are related to short-term improvement plans rather than long-term and systematic approaches based upon performance analysis. AR a result, there is a need for developing of a collaborative plan over project life cycle. Therefore, this paper reviews extensive literature and proposes the construction performance estimating model using a system dynamics. The paper proposes casual maps for planning, design, procurement, and construction phases. Each casual map includes all performance indicators and factors that impact on performance directly or indirectly. These casual maps that were developed by system thinking will enhance the understanding of the relationships among performances and factors. After further data gathering, these models can be used to estimate construction performance and eventually these will save project costs and shorten project schedule.

A Study on the Management of Construction Project for Preventing Accidents of Reclamation : basic on the collapse of Sangdo Kindergarten (도심지 소규모 재개발·재건축공사시 흙막이가시설 사고예방을 위한 건설사업관리 방안 연구 : 상도유치원 붕괴사고 중심으로)

  • Oh, Se-kil;Park, Joo-Moon
    • Journal of Urban Science
    • /
    • v.8 no.1
    • /
    • pp.33-44
    • /
    • 2019
  • The purpose of this study is to investigate the cause of repeated accidents through the investigation and analysis of the collapse cases of domestic earthquakes in order to prevent the earthquake disaster in the urban redevelopment and reconstruction. It is designed and constructed to draw out various problem factors and to find solutions to these problems. And the contents related to various laws and systems of the construction project management stage. Especially. In the management of the construction management centered on the safety management and quality control of the technical aspect design, supervision, construction phase through the cause of the accident and improvement measures based on the investigation report of the collapse of the construction site near Sangdo Kindergarten in Seoul. Supervisor. And constructors should be settled on the responsibility and responsibility of God. In order to achieve the purpose of the project, a system is established to link worker-centered occupational safety and health management with technology-based safety construction management, and analysis of how the quality control of the earthquake prevention affects safety construction management The purpose of this study is to prepare the optimum management plan of construction business.As a result of this study, it is aimed to accomplish the purpose of small scale redevelopment and reconstruction construction project by providing optimization method in the stage of construction project management in order to prevent collapse caused by differences in design,Is expected.

A MODEL OF RISK MANAGEMENT PLAN AND SYSTEM FOR THE CONSTRUCTION PHASE

  • Seon-Gyoo Kim;Chan-Jeong Park ;Moon-Serk Yang;Jin-Bong Kim ;Hyung-John Shin
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.341-346
    • /
    • 2005
  • After the IMF shock, some major construction companies in Korea have been motivated to avoid and mitigate various risk factors which could be critical and catastrophic events to corporate revenue and organization internally or externally. It means that they are trying to introduce and set up a risk management plan and system suitable to their organization and culture. L construction co. ltd. is one of major construction companies that have been searching methodologies or technologies to manage various risk factors surrounding corporate marketing and project operation. This paper presents an unique approach to develop a model of risk management plan and system suitable to L construction itself focused on the construction phase.

  • PDF

A Case Study of the Construction Management Applied to I-Project (I-프로젝트의 건설사업 관리(Construction Management) 적용사례)

  • Kim Jong-Hoon;Seo Bong-Whan
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.102-112
    • /
    • 2001
  • It has been passed $5\~6$ years since Construction Management introduced in Korea, but a few government projects have been presented as CM instances. We performed CM service, on behalf of the foreign Client, in the Insa-dong construction, I-Project. Even though there were many limits in cost, time and other aspects, we have attained satisfaction of the Client and successful businesses of all the construction parties as adopting the advanced management methods. Many advanced construction methods have been applied for the purpose of time reduce, cost save and quality assurance as well as to the webbased project management has been imported to overcome the limits of time and place. They have actualized to increase the productivity of the project by managing the floor to floor cycle and quality systemically pursuant to ISO 9002, and by adopting Real-name construction and completion system (or individual activity. While carrying out this project, it is possible to establish mutual reliability and understanding enable to resolve the issues occurring in the early stage due to insufficient understanding of CM, lack of communications and team work, indistinct work scope through continuos training and conferences. Additionally, we became to share business targets among the parties and promoted the project in confidence. We wish that the success of I- project to be rated as a standard model of CM in Korea.

  • PDF

Examining the PMIS Impacts on the Project Performance, User Satisfaction and Reuse Intention among the Project based Industries (프로젝트 성과, 사용자 만족도 및 재사용의도에 미치는 PMIS의 산업별 영향 비교)

  • Park, So-Hyun;Lee, Ayeon;Kim, Seung-Chul
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.44 no.3
    • /
    • pp.276-287
    • /
    • 2021
  • Project Management Information System (PMIS) is a special purpose information system that is created to provide useful information for project managers and participants to make effective and efficient decision making during projects. The use of PMIS is increasing in project based industries such as construction, defense, manufacturing, software development, telecommunication, etc. It is generally known that PMIS helps to improve the quality of decision making in project management, and consequently improves the project management performance. However, it is unclear what are the difference of PMIS impacts between industries, and still need to be studied further. The purpose of this study is to compare the impact of PMIS on project management performance between industries. We assume that the effects of PMIS will be different depending on the industry types. Five hypotheses are established and tested by using statistical methods. Data were collected by using a survey questionnaire from those people who had experience of using PMIS in various project related industries such as construction, defense, manufacturing, software development and telecommunication. The survey questionnaire consists of 5 point scale items and were distributed through e-mails and google drive network. A total of 181 responses were collected, and 137 were used for analysis after excluding those responses with missing items. Statistical techniques such as factor analysis and multiple regression are used to analyze the data. Summarizing the results, it is found that the impacts of PMIS quality on the PM performance are different depending on the industry types where PMIS is used. System quality seems to be more important for improving the PM performance in construction industry while information quality seems more important for manufacturing industry. As for the ICT and R&D industries, PMIS seems to have relatively lesser impact compared to construction and manufacturing industries.

Critical Success Factors for Project Management Information System in Construction

  • Lee, Seul-Ki;Yu, Jung-Ho
    • Journal of Construction Engineering and Project Management
    • /
    • v.1 no.1
    • /
    • pp.25-30
    • /
    • 2011
  • With a focus on different aspects of PMIS in construction projects, various sets of critical success factors (CSFs) have been suggested in the literature such as IS Success Model by various researchers. It is crucial to explore the relative importance and groupings of these factors. This paper aims to identify CSFs associated with Project Management Information System (PMIS) in construction projects, and explore their ranking and underlying relationship. CSFs for PMIS identified through a literature review, and consolidated by interviews and pilot studies with professionals in construction industry. A questionnaire instrument was sent out to experienced users (Construction Manager and Constructor) in Korea, and 253 completed questionnaires were retrieved. To increase the generalizability of the results, the respondents were spread across construction site. Using factor analysis and considering the high importance of the factor, CSFs were grouped into three dimensions. All these three groupings and their relationship were included in a framework for successful PMIS in construction projects. These findings help to clarify what the high prioritized factors are, and could also be used as an assessment tool to evaluate the performance of PMIS and thus help to identify areas for improvement.

CRITIAL SUCCESS FACTORS FOR PROJECT MANAGEMENT INFORMATION SYSTEM IN CONSTRUCTION

  • Jung Ho Yu;Seul Ki Lee
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.498-503
    • /
    • 2011
  • With a focus on different aspects of PMIS in construction projects, various sets of critical success factors (CSFs) have been suggested in the literature such as IS Success Model by various researchers. It is crucial to explore the relative importance and groupings of these factors. This paper aims to identify CSFs associated with Project Management Information System (PMIS) in construction projects, and explore their ranking and underlying relationship. CSFs for PMIS identified through a literature review, and consolidated by interviews and pilot studies with professionals in construction industry. A questionnaire instrument was sent out to experienced users (Construction Manager and Constructor) in Korea, and 253 completed questionnaires were retrieved. To increase the generalizability of the results, the respondents were spread across construction site. Using factor analysis and considering the high importance of the factor, CSFs were grouped into three dimensions. All these three groupings and their relationship were included in a framework for successful PMIS in construction projects. These findings help to clarify what the high prioritized factors are, and could also be used as an assessment tool to evaluate the performance of PMIS and thus help to identify areas for improvement.

  • PDF

THE ROLE OF USING A TABLET COMPUTER FOR MOBILE COMMUNICATION ON CONSTRUCTION SITES

  • Ruvinde R. Kooragamage;John M. Kelsey;Simon Julier
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.531-538
    • /
    • 2013
  • The coordination and control of construction projects is vital if a project is to be a success. Almost all analysis has shown that these can only be achieved if good quality communication can be maintained on a construction site. This research focuses on the role that tablet computers could play in enhancing this communication. The following points are investigated in this paper: (a) Whether a tablet computer can enable users to monitor project progress more efficiently than traditional methods, (b) How the tablet computer fits within the project management iron triangle in construction, (c) The two different psychological impacts of information transmission for the end user using a tablet computer (i) The expectancy to transmit information frequently and rapidly from tablet computer users to project members whilst working onsite (ii) The mode of information transmission to the cognition of the transmitted information to the tablet computer. Through the use of structured interviews and questionnaires, the opinions of individuals within various disciplines in construction were canvassed. The approach adopted in this paper deals with understanding both the soft and hard issues for deploying such a system. This research enabled the authors to develop a base framework incorporating the key factors which are relevant for implementing a tablet computer based on information flows primarily.