• 제목/요약/키워드: construction progress

검색결과 894건 처리시간 0.028초

건설공사 진도관리의 현황 분석에 대한 연구 (Analysis of Construction Schedule Progress Management Practice)

  • 신윤경;윤석현;백준홍
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2010년도 춘계 학술논문 발표대회 1부
    • /
    • pp.207-211
    • /
    • 2010
  • As mega-sized and complex building construction projects are increased, the importance of project scheduling and control is emphasized. Project scheduling and control technic is not used widely yet in Korea, but interests in it is progressively increased. By now, most research projects mainly have focused on scheduling issues. Project progress management is also as much important as project scheduling issues. Current state about project progress management in Korea is analysed and way for improvements are suggested in this paper. At first, research projects undergone and practice are analysed and fields experts are survey about current state about project progress management. This study suggests the progress management method for quantitative and qualitative project progress analysis.

  • PDF

안면인식(Face Recognition)을 활용한 진도관리 자동화 (Automated Progress Measurement and Management using Face Recognition)

  • 김남준;정영수
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2013년도 춘계 학술논문 발표대회
    • /
    • pp.160-161
    • /
    • 2013
  • Progress measurement is one of key tasks for cost and schedule management in construction management. However, there has been shortage of effort to implement for automated progress measurement. This paper proposes to use a face recognition (FR) technology for automated progress measurement and management in construction sites. The FR technology can acquire detailed progress data that includes the in and out information of labors by location. The expected effectiveness of the proposed system is to provide accurate labor information for progress measurement by utilizing automated data acquisition technology (DAT) with high-speed reading face. In addition, it could be applied to real-time safety and quality management by using the camera images.

  • PDF

건설공사의 진도율 산정 방법에 관한 연구 (A study on progress measurement method of a construction project)

  • 박세정;김수용
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2003년도 학술대회지
    • /
    • pp.450-453
    • /
    • 2003
  • 건선 사업에 일어서 초기 계획과 기성의 주기적이고 반복적인 비교 검토는 매우 중요하다. 이를 위해서는 정확한 현장 실적자료가 제공되어야하고, 작업량을 객관적으로 계량화하는 기준 및 진행상황을 정확히 반영한 진도율 산정이 필요하다. 이러한 진도율 산정을 위해서는 전체 사업이 명확한 작업범위를 갖는 단위작업으로 분할되어, 각 단위 작업에 필요한 정보가 할당되어야 한다. 국내 건설 사업에서와 같이 내역중심의 사업관리가 이루어지고 있는 상황하에서는 각 단위작업의 물량, 공사비 둥을 포함한 비용 정보 뿐만 아니라 일정 정보를 반영한 진도율 산정 방법이 필수적이며, 본 연구에서는 두 가지 정보에 의한 가중 진도율 산정방법을 제시하고자 한다.

  • PDF

건설감리 검측데이터 분석을 통한 공사 진행도별 중점관리공종 도출 (A Study on the Derivation of Key Management Works by Construction Progress through the Analysis of Construction Supervision Data)

  • 유나영;김하늘;김하림;조훈희
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2022년도 가을 학술논문 발표대회
    • /
    • pp.131-132
    • /
    • 2022
  • The type and proportion of construction work varies depending on the stage of progress, and the frequency of inspection and defect occurrences are different. If it is determined to be defective after the inspection, a delay may occur, and additional manpower and resources are required. Therefore, it is necessary to prevent these risks by classifying, deriving, and managing key management woks according to the progress. This study aims to contribute to the efficiency of the supervisor's inspection work by identifying the types of construction that should be managed intensively for each construction progress and deriving the time when defects occur frequently in each construction type.

  • PDF

BIM데이터를 활용한 건설공사 일정관리 시스템 개발 연구 (Development of Construction Schedule Management System based on BIM)

  • 박소현;송정화;오건수
    • 대한건축학회논문집:구조계
    • /
    • 제34권3호
    • /
    • pp.61-68
    • /
    • 2018
  • As construction projects become larger, higher and more complex, efficient use of information is increasingly more important. As a result, there is a growing demand to apply BIM data obtained in the design stage to the construction stage. In this study, we propose a BIM-based construction schedule management system in order to promote introduction and application of BIM in the construction stage. Specifically, we provided how to build BIM database to be used for construction schedule management, and proposed how to obtain progress information and enter information based on analysis of progress schedule. We also provided a system of classifying construction works for more systematic use of BIM database, a process of using BIM database in construction projects, and a step-by-step guideline on how to establish the system. The proposed construction schedule management system provides information on particular construction schedule, as well as information and progress chart on delayed parts of the work so that a change in schedule can be managed. Additionally, by linking system database with the BIM model, construction progress can be checked in 3D simulation and a delay in construction schedule can be managed. As a result, using BIM at construction sites contributes to improving project productivity.

WBS-CBS통합정보의 실적수량에 의한 기성 및 진도관리에 관한 연구 (Existing and progress control research of Existing quantity the integrated information Uses WBS-CBS.)

  • 안재홍;이영도
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2009년도 추계 학술논문 발표대회
    • /
    • pp.261-264
    • /
    • 2009
  • Construction projects are managed by focusing on the results of projects. Moreover, cost and schedule are managed separately even though the efficiency of integrated management is very high. This paper proposes existing and progress control research of existing quantity the integrated information uses WBS-CBS. Schedule and cost are most important in construction projects. Specially, progress and cost are relationship of the managing integrated in many construction management. The quantity of materials for the works of construction is the base to create activities and a network. The quantity of materials of materials for the elemens of a building is a base of cost estimation and resource. allocation. This study suggest method for relating the schedule and cost information through the case study of construction field engineers.

  • PDF

성과측정유닛을 활용한 건설 비용 - 일정 통합관리 방안 (Construction Cost-Schedule Integration Management Methodolgy by using Progress Integration Unit)

  • 강남희;최재현
    • 한국건설관리학회논문집
    • /
    • 제18권3호
    • /
    • pp.42-51
    • /
    • 2017
  • 건설 프로젝트의 생산과정에서 성과를 지속적으로 측정하고 평가하는 것은 프로젝트관리의 성공적인 수행을 위한 핵심요소이다. 성과는 일반적으로 목적물에 할당 된 공정과 원가 관련 정보를 정량적으로 평가함으로써 측정되며, 객관적인 성과측정을 위해 공정과 원가가 통합적으로 계획 관리되어야 한다. 본 연구는 공정과 원가의 통합 모델을 통해 성과 측정 방법론을 제안하고 진도관리의 기반을 마련하는데 목적이 있다. 이를 위해 공정계획과 원가계획의 표준화된 업무 프로세스를 개발하였고, EVM과 기존의 통합 모델을 분석하여, 성과측정 유닛을 활용한 WBS와 CBS의 통합 방법론을 제시하였다. 플랜트 프로젝트의 시공단계를 중심으로 공통 성과측정의 대상은 공종으로 선정하여 성과측정 유닛을 규정하고 공정과 비용정보를 연계시켜 성과비율을 산정하였다. 또한 리소스의 적용시 원가요소 중 소모성자원의 비용을 배제하여 진도측정의 객관성을 향상하였다. 본 결과는 실제 플랜트 사례 프로젝트에 적용하여 실증되었으며, 개발된 방법론은 향후 프로젝트의 성과를 보다 객관적인 기준으로 평가할 수 있어 보다 효과적인 진도관리 방법이 될 것으로 판단된다.

대규모 건설프로젝트의 진도율 측정 프레임워크 개발에 관한 연구 (Development of Progress Measurement Framework for Mega Construction Project)

  • 고성진;지석호;김진우;송준호
    • 대한토목학회논문집
    • /
    • 제37권2호
    • /
    • pp.419-425
    • /
    • 2017
  • 다양한 시설의 건설, 다수 이해관계자의 참여, 긴 사업기간 등의 복잡성으로 인해 대규모 건설프로젝트는 이를 관리함에 있어 어려움이 있다. 효과적인 대규모 프로젝트관리를 위해서는 합리적인 진도율 측정이 중요하고, 이를 위한 다양한 방법들이 제안되었다. 하지만 기존의 방법들은 단일 또는 일부 시설의 건설 프로젝트로 한정하였기 때문에 다양한 시설들을 건설하는 대규모 프로젝트에 적용하는 데 한계가 있다. 따라서 본 연구는 대규모 건설프로젝트의 특성을 반영한 진도율 측정 프레임워크를 제안함을 목표로 한다. 프레임워크는 작업분류체계 개발, 주요시설별과 하위시설별 가중치 산정, 통합 진도율 산정으로 총 4가지 단계로 이루어져 있다. 본 프레임워크를 검증하기 위해서 세종시를 대상으로 사례연구를 수행하였고, 활용 가능성을 검증할 수 있었다. 본 연구를 바탕으로 대규모 건설프로젝트의 진도율을 보다 합리적으로 측정할 수 있고 효과적인 프로젝트관리가 이루어질 것으로 기대된다.

UML을 이용한 실시간 진도관리 시스템의 설계 및 구현 - 로봇 크레인 기반 철골공사를 중심으로 - (Design and Implementation of Real-Time Progress Management System Using UML (Unified Modeling Language) - The Focus on Steel Structural Construction -)

  • 박정로;김경환;김재준
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2009년도 춘계 학술논문 발표대회 학계
    • /
    • pp.163-166
    • /
    • 2009
  • All sorts of technique for schedule progress management is being developed recently, These can change and develop the abstractive concept model to a detailed model that describes the visual 3D image about a schedule plan. but, this technique is troublesome, because this requires the handwork by means of connection between 3D-CAD and scheduling Program. In this study, the process of real-time schedule progress control system using the integrated database by 3D-CAD object information system and schedule module is presented. This study present the process of a schedule progress management using UML, and the process of real-time schedule progress management using RFID system. Through this study, we want to realize the rapid generation of estimated schedule information and to simulate and analyze actual schedule information by real-time.

  • PDF

BIM 기반의 시공단계 견적데이터를 활용한 일일 진도관리모델 구축 방안 (A Method to Build Daily Progress Management Model based on BIM Estimate Data in Construction Phase)

  • 정준호;진상윤
    • 한국건설관리학회논문집
    • /
    • 제12권5호
    • /
    • pp.23-34
    • /
    • 2011
  • 건설현장에서 정확한 진도를 관리하기 위해서는 비용정보와 일정정보를 결합한 통합정보가 요구되며 프로젝트의 성과측정을 위한 기초자료가 된다. 그러나 국내 건설공사는 비용과 일정정보를 각각 관리함으로써 객관적인 성과측정이 어려우며 내역서상의 물량을 액티비티에 분개하는 작업을 통해 생산성을 감소시킨다. 한편, BIM을 활용한 연구가 진행되면서 BIM을 통해 보다 효율적으로 진도관리하는 연구가 필요한 실정이며 현장에서는 일일 작업관리에 대한 필요성이 요구되고 있다. 이러한 건설 산업의 흐름에 따라 본 논문에서는 BIM 모델의 위치정보와 BIM기반의 견적데이터를 활용하여 3가지 타입의 진도관리단위를 생성하고 이를 통해 일일 진도율 및 일일 기성액을 파악하는 정보모텔을 제시하고자 한다.