• Title/Summary/Keyword: construction problems

Search Result 4,587, Processing Time 0.03 seconds

CONSTRUCTION COST INDEX FOR APPLYING INDEX ADJUSTMENT RATE IN THE ROAD PROJECT

  • Jin-Young Chun;Sungkwon Woo
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.1112-1117
    • /
    • 2005
  • Construction cost index is generally used to estimate the new project cost based on past construction data and to adjust contract cost when the price change of various articles and items of expenditure composing the contract occurs. In Korea, it is mostly used for adjustment of construction contract cost due to fluctuation of prices. However index adjustment rate which is used for adjustment of construction contract cost had some problems in calculating cost index of each expenditure item that could not reflect properly the change of construction cost. For supplementing these problems, the research of developing construction cost index has been executed. Through the precedent research, these problems were partially resolved but still remain. Therefore this research proposes method of making cost index that utilizes representative items of labor, material, and equipment by analyzing bill of quantity of road construction, through analysis and comparison of precedent study. By using this method, it is expected to solve problems which were not reflected in precedent studies.

  • PDF

Problems Related to Construction and Building Materials in Libya

  • Salah, Abuzaid;Bloomer, Steve
    • Journal of Construction Engineering and Project Management
    • /
    • v.4 no.4
    • /
    • pp.1-8
    • /
    • 2014
  • The broad aim of this paper is to provide a detailed understanding of the post-war problems associated with materials for reconstruction in Libya, and to identify key problems and obstructions. Theoretical and empirical studies are being conducted in Libya. The theoretical study focuses on materials for construction and the key issues such as sources, transport and storage of materials, as well as their impact on the national economy, the nation's socio-economic development and the environment. This empirical study employed questionnaires, observations and a series of interviews with researchers, academics, suppliers and manufacturers, supported by the researcher's three decades of experience of working in the construction industry and its associated processes and operations. The empirical study illustrated that materials for post-disaster reconstruction in Libya suffer from external problems related to policies and decision-making in terms of availability of materials, fluctuation of prices of materials, specifications, building codes, legislation and regulations, and internal problems related to the construction and building material's key players: construction companies, consultancy firms, manufacturers and suppliers.

A Study on Solving Triangle Construction Problems Related with Radius of Escribed Circle Using Algebraic Method (대수적 방법을 이용한 방접원에 관련된 삼각형 작도문제의 해결 연구)

  • Gong, Seon-Hye;Han, In-Ki
    • Journal of the Korean School Mathematics Society
    • /
    • v.11 no.3
    • /
    • pp.399-420
    • /
    • 2008
  • In this paper we solve various triangle construction problems related with radius of escribed circle using algebraic method. We describe essentials and meaning of algebraic method solving construction problems. And we search relation between triangle construction problems, draw out 3 base problems, and make hierarchy of solved triangle construction problems. These construction problems will be used for creative mathematical investigation in gifted education.

  • PDF

Design and Construction Problems of NATN Tunnel Emerged from Seoul Subway Construction (서울 지하철 건설에서 조명된 NATM 터널의 설계 및 시공상의 문제점)

  • 정명근;박광준
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 1993.03a
    • /
    • pp.15-20
    • /
    • 1993
  • NATM becomes one of the major methods of tunnel construction, such as that of subways and highways. However, a number of design and construction problems have been noticed and reported from the recent large-scale tunnelling projects. Some of them are presented and discussed in this report in order to call an attention to these problems and provide a sound basis for the improvement of current problems.

  • PDF

The Study on Problems in Bidding Guideline and Suggestion for Improvement in Architectural Turnkey project in Construction - Focused on Preventing Claim- (건축턴키공사 입찰안내서의 문제점과 개선방안에 관한 연구 - 클레임예방을 중심으로 -)

  • Yoon Jun-Seon
    • Journal of Arbitration Studies
    • /
    • v.15 no.3
    • /
    • pp.303-324
    • /
    • 2005
  • Turnkey project in construction which accounts for about $10\%$ of the total annual construction orders in the nation is expected to grow in size as an effort to strengthen international competitiveness and improve quality of construction work. However, problems of turnkey project in construction raise concern for many possible cases of possible claims. Based on the understanding that bidding guidelines which plays a critical role in turnkey project in construction actually contain some unequal clauses and causes for problems which undermine development of turnkey construction and further create possible cases of claims, the paper aims to identify and analyze the unequal clauses and problems contained in the guidelines in order to make suggestions for improvement. Among all the turnkey construction orders that has been placed since 2000 when domestic turnkey project in construction became relatively formulated, 13 constructions costing more than 50 billion won were selected for this study since their construction scale were large enough that the bidding guidelines for them were regarded as containing little difference among one another. In order to enhance construction technology and to prevent claims while trying to achieve the original purpose of Turnkey system, the parties involved in or schedule to take part in Turnkey project including ordering institution, Construction Company and Design Company should make an effort to have more reasonable bidding guidelines drawn up.

  • PDF

Deployment of Appropriate Architectural Construction Engineers to Solve Quality and Safety Problems at Construction Sites (건설현장의 품질·안전문제 해결을 위한 적정 건축시공기술자의 배치 관련 연구)

  • Kim, Hyunjun;Kim, Jin-Dong;Shin, Yoonseok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.25 no.4
    • /
    • pp.15-23
    • /
    • 2024
  • Recently, quality problems, such as the collapse of apartment structures under construction, has emerged as a social issue. Although there are various causes of quality problem and the impact of each problem may be different, the problems from the perspective of construction engineer of construction company are investigated. Therefore, this study aim to investigate the adequacy of construction engineer's experience, number of field engineer, timing of engineer deployment at construction sites, etc. in order to resolve quality and safety problems. In this study, a questionnaire survey was conducted targeting construction managers to obtain objective opinions. The results showed that the number of construction engineers in construction companies should be increased and that intermediate construction engineers should be increased to enable practical site management for resolving quality and safety problems. In addition, it was found that there was a need to reduce the number of non-regular employed field construction engineers in construction site and at the same time systematically regulate the number of on-site construction engineers, similar to safety managers and quality managers.

SOME PROBLEMS IN DESIGN AND CONSTRUCTION OF TEMPORARY RETAINING STRUCTURES

  • Chung, Hyung-Sik
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 1990.10a
    • /
    • pp.87-96
    • /
    • 1990
  • Even though the number of construction cases of temporary retaining structures in urban area are increasing, there still are many problems to be solved in design and construction of temporary retaining structures. In this paper the current design methods are reviewed and their problems are analyzed. Some critical mistakes made by site technicians and engineers are also discussed.

  • PDF

The Analysis Textbooks and Instruction Activities of Construction Contents in 7th Mathematics Curriculum (7차 수학과 교육과정 작도 영역의 교과서와 수업사례 분석)

  • 조완영;정보나
    • School Mathematics
    • /
    • v.4 no.4
    • /
    • pp.601-615
    • /
    • 2002
  • This paper analyzed <7-나> and <8-나> textbooks and teacher instruction activities in classrooms, focusing on procedures used to solve construction problems. The analysis of the teachers' instruction and organization of the construction unit in <7-나> textbooks showed that the majority of the textbooks focused on the second step, i.e., the constructive step. Of the four steps for solving construction problems, teachers placed the most emphasis on the constructive order. The result of the analysis of <8-나> textbooks showed that a large number of textbooks explained the meaning of theorems that were to be proved, and that teachers demonstrated new terms by using a paper-folding activities, but there were no textbooks that tried to prove theorems through the process of construction. Here are two alternative suggestions for teaching strategies related to the construction step, a crucial means of connecting intuitive geometry with formal geometry. First, it is necessary to teach the four steps for solving construction problems in a practical manner and to divide instruction time evenly among the <7-나> textbooks' construction units. The four steps are analysis, construction, verification, and reflection. Second, it is necessary to understand the nature of geometrical figures involved before proving the problems and introducing the construction part as a tool for conjecture upon theorems used in <8-나> textbooks' demonstrative geometry units.

  • PDF

A Study on Solving Triangle Construction Problems Given by a Midpoint of Side and Other Two Points (한 변의 중점과 다른 두 점이 주어진 삼각형 작도문제의 해결에 대한 연구)

  • Han, In-Ki;Lee, Jeong-Soon
    • Journal of the Korean School Mathematics Society
    • /
    • v.12 no.4
    • /
    • pp.365-388
    • /
    • 2009
  • In this paper we solve various triangle construction problems given by three points(a midpoint of side and other two points). We investigate relation between these construction problems, draw out a base problem, and make hierarchy of solved construction problems. In detail we describe analysis for searching solving method, and construction procedure of required triangle.

  • PDF

Classification problems of the unit modular housing through reviewing design drawings (도면검토를 통한 유닛 모듈러 주택의 문제점 유형분류)

  • Lee, Yu-ri;Kim, Kyoon-tai;Park, Nam-cheon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.05a
    • /
    • pp.160-161
    • /
    • 2014
  • This paper describes the classification problems of the unit modular housing through reviewing design drawings. Modular construction is a new industrialized homebuilding technology that uses large, factory produced modules. In general, more than 70% of construction processes in unit modular construction method are produced in factory after that the modular, which is completed is lifted on site and assembled. This research considers categorization in which the design drawing of the unit module housing can have problems. There are 17 types of construction method and 14 types of design approach as a result of the classification.

  • PDF