• Title/Summary/Keyword: construction planning

Search Result 2,717, Processing Time 0.027 seconds

A methodology for an effective utilization of construction equipment for highway construction projects (도로공사 공정계획을 위한 공정 로직 및 건설장비 효율화 방안)

  • Song, Hojeong;Choi, Jaehyun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.6
    • /
    • pp.26-34
    • /
    • 2014
  • Highway construction is a combination of linear, repetitive, and highly equipment intensive operations. Various types of construction equipment are deployed to ensure undisrupted performance of construction, and thus productivity improvement and cost-saving can be achieved through well-thought-out planning. The selection of construction equipment is dependent upon construction sequence, site conditions, and construction methods. In the process of planning, management should consider various types of construction methods per each type of construction operation. Also, management should map out proper construction equipment operation plan that takes the construction duration and cost measures into consideration. However, limited availability of historic data from the similar types of operations has been a stumbling block to proper construction planning, making the operations performed based upon experience and intuition guided by rules-of-thumb. As a consequence, the planing phase rarely provided an adequate validity in the implementation phase. The researchers developed a process logic for each construction type that management can utilize from early phase of highway construction planning process. Moreover, derived the construction equipment combination optimized for efficiency by using the process simulation technique. The developed method is expected to be useful for the decision-making process that aims to evaluate efficiency of various process plans and to ensure optimal selection of construction equipment for highway construction projects.

A Study on the Analysis and Estimation of the Construction Cost by Using Deep learning in the SMART Educational Facilities - Focused on Planning and Design Stage - (딥러닝을 이용한 스마트 교육시설 공사비 분석 및 예측 - 기획·설계단계를 중심으로 -)

  • Jung, Seung-Hyun;Gwon, Oh-Bin;Son, Jae-Ho
    • Journal of the Korean Institute of Educational Facilities
    • /
    • v.25 no.6
    • /
    • pp.35-44
    • /
    • 2018
  • The purpose of this study is to predict more accurate construction costs and to support efficient decision making in the planning and design stages of smart education facilities. The higher the error in the projected cost, the more risk a project manager takes. If the manager can predict a more accurate construction cost in the early stages of a project, he/she can secure a decision period and support a more rational decision. During the planning and design stages, there is a limited amount of variables that can be selected for the estimating model. Moreover, since the number of completed smart schools is limited, there is little data. In this study, various artificial intelligence models were used to accurately predict the construction cost in the planning and design phase with limited variables and lack of performance data. A theoretical study on an artificial neural network and deep learning was carried out. As the artificial neural network has frequent problems of overfitting, it is found that there is a problem in practical application. In order to overcome the problem, this study suggests that the improved models of Deep Neural Network and Deep Belief Network are more effective in making accurate predictions. Deep Neural Network (DNN) and Deep Belief Network (DBN) models were constructed for the prediction of construction cost. Average Error Rate and Root Mean Square Error (RMSE) were calculated to compare the error and accuracy of those models. This study proposes a cost prediction model that can be used practically in the planning and design stages.

Developing an Optimization Model and Program for Planning the Earthwork Based Upon Transportation Theory (수송모형이론에 의한 토공 운반 최적화 모델 및 프로그램 개발)

  • Lee, Seunghak;Son, Jaeho;Pyeon, Jaeho;Lee, Seunghyun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.1
    • /
    • pp.101-109
    • /
    • 2016
  • During road construction, minimizing haul and return distances as well as keeping a balance between cut and fill quantities are two of the key tasks for earthmoving operation planning. The result of the earthwork planning has a significant impact on the construction cost and duration. Although there have been research efforts regarding optimized earthwork planning using linear programming, the current practice of selecting earthwork planning methods typically depends on a field manager's intuitive and/or experimental knowledge. Furthermore, there is no system considering earthwork influential field factors including the transportation distance, the earthwork quantity, and the recycling ratio of earth volume. Therefore, this research focuses on the development of such a model for planning the optimized earthwork to increase the efficiency of a road construction. The proposed model is developed based upon the transportation problem method which is a part of Linear Programming. The application result of optimization model on a case study shows that the duration and cost for earthwork ha sbeen reduced approximately 19% and 11% respectively

ACTIVITY-BASED STRATEGIC WORK PLANNING AND CREW MANAGEMENT IN CONSTRUCTION: UTILIZATION OF CREWS WITH MULTIPLE SKILL LEVELS

  • Sungjoo Hwang;Moonseo Park;Hyun-Soo Lee;SangHyun Lee;Hyunsoo Kim
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.359-366
    • /
    • 2013
  • Although many research efforts have been conducted to address the effect of crew members' work skills (e.g., technical and planning skills) on work performance (e.g., work duration and quality) in construction projects, the relationship between skill and performance has generated a great deal of controversy in the field of management (Inkpen and Crossan 1995). This controversy can lead to under- or over-estimations of the overall project schedule, and can make it difficult for project managers to implement appropriate managerial policies for enhancing project performance. To address this issue, the following aspects need to be considered: (a) work performances are determined not only by individual-level work skill but also by the group-level work skill affected by work team members, each member's role, and any working behavior pattern; (b) work planning has significant effects on to what extent work skill enhances performance; and (c) different types of activities in construction require different types of work, skill, and team composition. This research, therefore, develops a system dynamics (SD) model to analyze the effects of both individual-and group-level (i.e., multi-level) skill on performances by utilizing the advantages of SD in capturing a feedback process and state changes, especially in human factors (e.g., attitude, ability, and behavior). The model incorporates: (a) a multi-level skill evolution and relevant behavior development mechanism within a work group; (b) the interaction among work planning, a crew's skill-learning, skill manifestation, and performances; and (c) the different work characteristics of each activity. This model can be utilized to implement appropriate work planning (e.g., work scope and work schedule) and crew management policies (e.g., work team composition and decision of each worker's role) with an awareness of crew's skill and work performance. Understanding the different characteristics of each activity can also support project managers in applying strategic work planning and crew management for a corresponding activity, which may enhance each activity's performance, as well as the overall project performance.

  • PDF

A Knowledge-based Approach to Plant Construction Process Planning (지식 기반 플랜트 건설 공정 계획 시스템의 개발)

  • 김우주
    • Journal of Intelligence and Information Systems
    • /
    • v.7 no.1
    • /
    • pp.81-95
    • /
    • 2001
  • Plant construction projects usually take much higher uncertainty and risks than the projects from other domains. This implies the importance of plant construction project management should be more emphasized than the other domain. Especially, the overall successes of the projects often depend on the performance of process planning and scheduling performed at the initial stage of the project. However, most plant construction projects suffer great difficulties in establishing proper process planning and scheduling timely because of unstructureness and dynamicity of environment of the project itself In this paper, we propose a knowledge-based process planning and scheduling approach in a plant construction domain to cope this problem. First, we modulize process planning knowledge and present the knowledge representation scheme. Second, we propose an inferencing mechanism to build a process planning for plant construction based on the represented process planning knowledge. Since our approach automate the initial process planning, which was usually done by manual way, it can improve the correctness and also completeness of the process plan and schedule by reducing the time to plan and allowing simulations on the various situation. We also design and implement this our approach as a real working system, and it is successfully applied to real plant construction cases from a leading construction company in Korea. Based on this success, we expect our approach can be easily applied to the projects of other areas, while contributing to enhancement in productivity and quality of project management.

  • PDF

Safety Management Priority Classified by Participants in Planning & Design Stages (국내 건설공사 초기단계에서의 참여주체별 중점안전관리항목 조사연구)

  • Song, Do-Heom;Yeo, Sang-Ku;Go, Seong-Seok
    • Journal of the Korean Society of Safety
    • /
    • v.25 no.1
    • /
    • pp.50-56
    • /
    • 2010
  • The safety accidents of domestic construction happened more than other industries is performed only under the construction stage. In the foreign countries, however, owners and designers play an important role on safety in an early stage. Therefore, numerous studies were carried out by getting rid of accident risks and institutionalizing prevention activities in an construction stages. Accordingly, this study have performed to deduce the pivotal point of safety management items classified by the subject suitable for construction by introducing of safety conception of domestic and international design and suggested the improvement methods of safety management plans of the planning design stage so as to perform more efficient safety management.

A Study on the Housing Development Building by User's Participation (사용자(使用者) 참여(參與)에 의한 주거단지(住居團地) 건축(建築)에 대(對)한 조사(調査) 연구(硏究))

  • Oh, Young-Sik;Choi, Hyo-Seung
    • Journal of the Korean Institute of Rural Architecture
    • /
    • v.4 no.1
    • /
    • pp.37-44
    • /
    • 2002
  • There are some studies about user's participation to reflect their desire and value on the planning of house by this time. These were constitution of unit space focused on the apartments, which is mostly theoretical. However, till completion of a construction work, it goes through various processes of some steps such as, buying building site, site planning, architectural planning and construction. In architectural planning process, it takes time for continuous discussion and revision between architects and users. Also changes of plan must of necessity be so because of in or outside conditions. So, right user's participation has its meaning that they take part in each step and portion of process faithfully on whole architectural processes. In this case, tenants of single house were decided and they already buy building site and lay out rules jointly. With this circumstance I've researched a kind of test the reflection on various desires and its acceptance in each steps through completion of a construction work, which is based on their participation.

  • PDF

Ontology-based Safety Risk Interactions Analysis for Supporting Pre-task Planning

  • Tran, Si Van-Tien;Lee, Doyeop;Pham, Trang Kieu;Khan, Numan;Park, Chansik
    • International conference on construction engineering and project management
    • /
    • 2020.12a
    • /
    • pp.96-102
    • /
    • 2020
  • The construction industry remains serious accidents, injuries, and fatalities due to it's unique, dynamic, and temporary nature. On workplace sites, Safety pre-task planning is one of the efforts to minimize injuries and help construction personnel to identify potential hazards. However, the working conditions are complicated. Many activities, including tasks or job steps, are executing at the same time and place. It may lead to an increase in the risks from simultaneous tasks. This paper contributes to addressing this issue by introducing a safety risk interaction analyzing framework. To accomplish this objective, accident reports of the Occupational Safety and Health Administration (OSHA) are investigated. The pairs of task incompatibility, which have time-space conflicts and lead to incidents, are found. Ontology technology is applied to build the risk database, in which the information is acquired, structuralized. The proposed system is expected to improve pre-task planning efficiency and relieve the burdens encountered by safety managers. A user scenario is also discussed to demonstrate how the ontology supports pre-task planning in practice.

  • PDF

A Study on Analyzing the Factors Affecting Environmental Loads in the Planning Stage of Korean National Highway Projects

  • Park, Jin-Young;Park, June-Seok;Kim, Myeong-Jin;Kim, Sang-Ryong;Kim, Byung-Soo
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.508-512
    • /
    • 2015
  • Carbon emission calculation guidelines provided by the Korean Ministry of Land, Infrastructure and Transportation (MOLIT) and existing environmental load assessment studies have suggested a method for estimating based on the volume determined after the design development. Therefore they are not being helpful in the decision making of the environmental economics of road facilities in the planning stage in which specific information on construction output volume is lacking. Based on literature analysis of existing studies and consultation from a group of construction environmental professionals, 12 types of property information considered to be related to environmental load were selected from an inventory of information that will be available in the road planning stage. In addition, multiple regression analysis was performed based on the environmental load computed through the life cycle assessment (LCA) of 40 national highway project cases of Korea to deduce five impact factors of environmental load in the road facilities planning stage.

  • PDF

Road Construction Cost Estimation Model in the Planning Phase Using Artificial Neural Network (인공신경망을 적용한 기획단계의 도로건설 공사비 예측 모델)

  • Han, Hyeong Dong;Kim, Jeong Hwan;Yoon, Jung Ho;Seo, Jong Won
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.31 no.6D
    • /
    • pp.829-837
    • /
    • 2011
  • Construction cost estimation in planning phase which calculates the cost for performing construction tasks is used for various ways. Meanwhile, in the case of road construction, the existing cost estimating method in early phase based on numerical mean value of the past is not accurate to be used. This paper propose neural network model for estimating road construction cost in planning phase to solve the limit of current cost estimating method. The model was designed using past road construction bidding records, and variables of model were optimized through trial and error. The estimation result of the model was compared with regression analysis and government's standard and it was verified that the model is better in accuracy. It is expected that the proposed model will be used for road cost estimation in planning phase.