• 제목/요약/키워드: construction operation management

검색결과 1,055건 처리시간 0.035초

업무 중요도-난이도를 고려한 프로젝트 참여주체별 핵심 환경관리 항목 도출 (Critical Environmental Management Factor by Project Participants for Considering Work Importance and Difficulty)

  • 홍석규;김창원;조훈희;강경인
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2013년도 추계 학술논문 발표대회
    • /
    • pp.214-215
    • /
    • 2013
  • Recently, Construction industry has been trying to reduce environmental impacts reflecting the global trend 'Green Growth'. However most of previous studies focused on operation & maintenance phases and do not have been approached construction phases. In addition, environmental management factors by project participants are assessed with only weight of factors, overlooking these work difficulty. Therefore This study aims to deducted the critical environmental management factors by project participants considering work difficulty in plan, design and construction phase. The basis data is collected through literature reviews and interview targeting each project participant and analyze these data using importance-difficulty analysis(IDA).

  • PDF

건설경기와 건설업체 부실화 간의 관계성 분석 (Analysis of Correlation between Construction Business and Insolvency of Construction Company)

  • 서정범;이상효;김재준
    • 한국건설관리학회논문집
    • /
    • 제14권3호
    • /
    • pp.3-11
    • /
    • 2013
  • 건설경기의 악화에 따른 건설업체 경영상태의 악화는 단순히 건설업체만의 문제가 아니다. 즉, 건설산업은 건설업체뿐만 아니라 공공기관, 금융기관, 가계 등 다양한 시장참여자가 공동으로 관계하고 있기 때문에 심각한 경제적 손실을 야기할 수 있다. 이러한 관점에서 건설경기 변동과 건설업체 부실화 변화 과정 사이의 관계를 살펴보는 것은 중요한 의미를 지니게 된다. 이에 따라 본 논문에서는 건설업체 부실화 정도와 건설경기 간의 관계성을 실증분석하는 것을 목적으로 한다. 본 논문에서는 먼저 KMV 모형을 활용하여 예상부도확률을 측정하고 이를 건설업체 부실화의 대리변수로 활용하였다. 건설경기 변수들의 경우 공사종류별로 세분화하였다. 즉 주거용, 비주거용, 토목용 건설투자액을 공종별 건설경기를 대리하는 변수로 활용하였다. 이러한 변수들을 활용하여 본 논문에서는 벡터오차수정모형(VECM)을 활용하였다. 분석결과를 통해 살펴본 바, 건설업체들은 먼저 사업포트폴리오를 다양화할 필요가 있을 것으로 판단된다. 또한 건설업체의 경영상태가 악화되게 되면 시장상황이 좋아지더라도 이를 원래 상태로 회복하는 것은 상당히 힘든 것으로 판단된다. 즉 건설업체의 경영상태가 양호해지기 위해서는 시장상황즉, 외부환경의 변화도 매우 중요하겠지만 그보다 더 기업내부적인 역량강화가 절실할 것으로 판단된다.

PMBOK Guide 지식영역 적용 사례 -원전종합설계를 중심으로- (A Case on Application of the PMBOK(Project Management Body of Knowledge) Guide in Nuclear Power Plant Architect Engineering)

  • 임재민;김성수
    • 건설관리
    • /
    • 제13권6호
    • /
    • pp.41-45
    • /
    • 2012
  • Nowadays the Project Management is increasingly adapted into almost all the fields in business management processes among leading companies both in Korea and overseas. However its actual practices are rare to be found. Among the Project Life Cycle, this report covers the real cases of the PMBOK knowledge areas in NPP Architect Engineering. The areas of the Construction, Start-up and Operation will be exception of the cases. By way of analyzing the KEPCO ENC's Processes/Procedures/Systems and the ones in PMBOK Guide, this report will show the contents in the PMBOK Guide is rather practical than theoretical. Meanwhile, implications whether the conclusions of this report might be applied to other industries such as general construction, non-nuclear plants, etc. should be left behind to follow-up studies.

건설원전 형상관리를 위한 통합변경프로세스 연구 (Research Integrated Change Process for Configuration Management of Construction Nuclear Power Plant)

  • 박유진
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2016년도 춘계 학술논문 발표대회
    • /
    • pp.231-232
    • /
    • 2016
  • Configuration Management (CM) is a process of identifying and documenting the characteristics of a Structures, Systems and Components (SSCs), and of ensuring that changes to these characteristics are properly assessed, approved, issued, implemented and verified. There are requirement management, change control, facility configuration information management for CM activities. In order to improve safety of Nuclear Power Plant(NPP), it is necessary to manage change item systematically. Existing CM concept is focused on the NPP in operation. On the other hand, NPP under construction is difficult to efficiently manage the change because of different change process from varoius stake-holders. This research considers method of consolidation change process for NPP to ensure that approved changes are accurately reflected in the design requirements, facility configuration information, and the physical configuration.

  • PDF

블록체인과 빅데이터 기술을 이용한 건설 조달 관리 기초 연구 (A Basic Study of Construction Procurement Management using Block Chain & Big Data Technology)

  • 김기호;손승현;김선국
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2019년도 춘계 학술논문 발표대회
    • /
    • pp.127-128
    • /
    • 2019
  • The cost of procurement in construction projects varies depending on the type of project, but the proportion of the cost component is very large. Therefore, efficient procurement system operation affects the success of the project. However, difficulties arise in procurement management due to problems such as availability of data due to limited information, inaccurate scheduling and integration of costs. Therefore, the purpose of this study is to develop a procurement management system to help efficient communication decision by combining Big Data which can analyze a lot of information and Block Chain technology which can secure information and record reliability to satisfy the above requirements. The results of this study are used to develop a system to develop academically improved procurement management system and practically to develop a system to secure business competitiveness and to facilitate rapid communication among project participants.

  • PDF

건설업 안전경영시스템모델 개발 (A Model for Efficient Construction Safety System)

  • 채준석;갈원모;손기상
    • 대한안전경영과학회지
    • /
    • 제3권2호
    • /
    • pp.73-89
    • /
    • 2001
  • Safety management cost, US$ one thousand billion has been input to the construction area from 1995 to 2000 but the management quality is still in the developing country level. The above mentioned increase of accident rate are attributed to the generous code regulation, net fit to the sense, varying with time change, but the more fundamental reason of this is no practical construction safety management system, up to now. Hardware-orienting operation for the system could be a main reason of this problem. In this paper, we developed a model for efficent construction safety system. It was found from the case study that the model result in high efficient with low cost.

  • PDF

A FRAMEWORK FOR SIMULATING CONSTRUCTION PROCESSES FOR OPTIMIZING THE FLOOR CONSTRUCTION CYCLE USING BIM

  • Seung-Jun Ahn;Hyun-Soo Lee;Moonseo Park
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.835-840
    • /
    • 2009
  • Lately, Building Information Modeling (BIM) emerges as the most promising technology, now is expected to bring a great deal of improvement of productivity in every aspect of the construction industry. One of the BIM based scheduling is to use BIM model as a base for applying to schedule analysis and simulation tools. This type of tools may incorporate a various types of information such as the building model, construction method information, resource information, productivity information, rules and constraints to optimize activity sequencing. This paper proposes a framework of BIM based simulating system which can be used to optimize construction processes, especially for the floor construction cycle. For the purpose, all of the necessary components of the system will be defined and represented, and next an algorithm will be introduced to demonstrate the principle of simulating operation. The benefits of this technique are basically two : to test and optimize construction methods in respect of the construction duration and to reduce the floor construction cycle.

  • PDF

ERP 시스템의 효율적 운영을 위한 적정 조직 설계에 대한 실증적 연구 (An Empirical Study on Setting Up of an Appropriate Organization for Efficient Operation of ERP Systems)

  • 남호기;박상민;김종현
    • 대한안전경영과학회지
    • /
    • 제12권4호
    • /
    • pp.117-125
    • /
    • 2010
  • Today, many companies have introduced an ERP system - an enterprise resources planning - in order to improve corporate credibility through transparent management and for quick responses to market situations through quick decision making. After the construction of an ERP system, many companies are having difficulty in calculating the appropriate number of personnel required for running the system because of a lack of standard for doing so, as well as a lack of pertinent procedures. As a result, the companies are having to resort to a trial-and-error approach. Therefore this paper studied a model for calculating the appropriate number of personnel required for efficiently running an ERP system after its construction, as well as for constantly meeting its performance targets. The developed model was applied empirically to calculate an appropriate number of personnel required, and an organization was set up according to this. Therefore, the purpose of this study was to present an optimized model for calculating the number of personnel required for operating an ERP system, that which addresses problems of existing models, in order to help companies organize the operation personnel and its size, as well as to provide more objectivity to the calculated number of personnel required and to improve credibility.

크레인 컨트롤러에서의 전도방지를 위한 디스플레이 콘텐츠 개발 (Development of Display Content for Overload Prevention in the Crane Controller)

  • 이상영
    • 디지털산업정보학회논문지
    • /
    • 제8권3호
    • /
    • pp.87-95
    • /
    • 2012
  • Up to now, industrial cranes play important roles as the effective machines to carry heavy loads in the manufacturing premise, in the construction field and so on. And, a crane is widely used not only to daily work but also to carry heavy materials efficiently in a construction site for prevention of accident. However, the crane operation is highly complicated even for experts. In this paper, we developed the content of the crane mounted on the controller. This content overload conditions in the operating environment for the crane operator to warn, and the operation of equipment has the capability to limit automatically. The content for crane controller is to alert the operator overload and to limit the operation of equipment for stabilizing capabilities. The content of the flexible algorithm is based on stabilizing controllers, PLC (Programmable Logic Controller) to connect for using the equipment and electrical control systems to ensure the safety of workers and to improve the ability to work possible.

SCRAPER EARTH-MOVING FLEET OPTIMIZATION VIA SPREADSHEET-BASED MODELING

  • Borinara Park
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.658-668
    • /
    • 2009
  • Earth-moving operation has a great impact on the overall budget and schedule of any heavy civil projects. More often than not, the operational decisions are made largely based on field personnel's experience and judgment. In particular, decisions on earth moving operations by scraper-dozer fleets have been heavily influenced by the following belief: "The longer a dozer pushes a scraper for loading, the better earth-moving productivity is gained by the fleet." Even though there is some truth to this notion, scraper-dozer earth moving operations involve a much complex process that requires a systematic analysis for predicting the maximum production. To this end, this paper presents a spreadsheet-based scraper-dozer fleet operation model for its production optimization. Various optimization techniques, including a genetic-algorithm method, are presented for comparison and each technique's pros and cons are discussed.

  • PDF