• Title/Summary/Keyword: construction of cable stayed bridge

Search Result 142, Processing Time 0.024 seconds

Experimental Study for Ultimate Behavior of Steel Cable Stayed Bridge Under Construction (실험을 통한 시공 중 강사장교의 극한거동 연구)

  • Lee, Kee Sei;Kim, Seung Jun;Choi, Jun Ho;Kang, Young Jong
    • Journal of Korean Society of Steel Construction
    • /
    • v.24 no.6
    • /
    • pp.683-692
    • /
    • 2012
  • The girders of cable stayed bridge are subjected to not only the bending moments but also additional compressive axial forces due to the horizontal components of cable forces. Because of these axial forces, the stiffness of girder can be decreased, and this problem should be considered especially for under-construction model rather than the full model. Korean domestic design specification suggests the linear elastic eigen value analysis for the stability problem of cable stayed bridges. However, this method cannot be applied to the under construction model because various geometric nonlinear characteristics cannot be considered. Therefore, in this study, 3 models which are assumed to be constructed by balanced cantilever will be considered experimentally and analytically to analyze the behavior of steel cable stayed bridges.

A Nonlinear Analysis of Cable Stayed Bridge including Sway Vibrational Effects using Multiple Cable Elements (다수 케이블요소를 사용한 사장교의 횡방향진동을 포함한 비선형 해석)

  • Seong, Ik-Hyun;Yoon, Ki-Yong
    • Journal of Korean Society of Steel Construction
    • /
    • v.12 no.6
    • /
    • pp.661-670
    • /
    • 2000
  • To investigate the characteristics of the dynamic response of long-span cable-stayed bridges due to various dynamic loadings likes moving traffic loads, two different 3-D cable-stayed bridge models are considered in this study. Two models are exactly the same in structural configurations but different in finite element discretization. Modal analysis is conducted using the deformed dead-load tangent stiffness matrix. A new concept was presented by using divided a cable into several elements in order to study the effect of the cable vibration (both in-plane and swinging) on the overall bridge dynamics. Futhermore case of asymmetric traffic loading clustered in one direction are also considered to study the torsional response of the bridge. The result of this study demonstrates the importance of cable vibration on the overall bridge dynamics.

  • PDF

Probabilistic Risk Assessment of a Steel Composite Hybrid Cable-Stayed Bridge Based on the Optimal Reliabilities (최적신뢰성에 의한 강합성 복합사장교의 확률적 위험도평가)

  • Yoon, Jung Hyun;Cho, Hyo Nam
    • Journal of Korean Society of Steel Construction
    • /
    • v.19 no.4
    • /
    • pp.395-402
    • /
    • 2007
  • Probabilistic risk assessment was conducted on a hybrid cable-stayed bridge consisting of a steel-composite plate girder and a concrete girder with a long span, designed using the working stress design and strength design methods. The component reliabilities of the bridge's cables, pylons, girders, and steel-concrete conjunction were evaluated using the AFOSM(Advanced First Order Second Moment) algorithm and the simulation technique at the critical sections, based on the maximum axial force, shear, and positive and negative moments of the selected sections. For the analysis of system reliability, the hybrid cable-stayed bridge consisting of cables, pylons, and plate girders was modeled into combined failure modes, and for system reliability, the probabilities of failure and reliability index of the structural system were evaluated. Based on the results of this study, the critical failure modes of the hybrid cable-stayed bridge based on the bridge's structural characteristics are suggested, and the efficiency of the partial ETA technique for use in the risk assessment method was confirmed.

Creep and shrinkage effects in service stresses of concrete cable-stayed bridges

  • Lozano-Galant, Jose Antonio;Turmo, Jose
    • Computers and Concrete
    • /
    • v.13 no.4
    • /
    • pp.483-499
    • /
    • 2014
  • Most of the methods presented in the literature to define the target service stresses (Objective Service Stage, OSS) of cable-stayed bridges rarely include the time-dependent phenomena effects. Nevertheless, especially in concrete structures, this assumption might be on the unsafe side because time-dependent phenomena usually modify service stresses. To fill this gap, this paper studies the time-dependent phenomena effects into service stresses of concrete cable-stayed bridges. After illustrating the important role of these phenomena in an asymmetrical cable-stayed bridge without backstay, a new method to include their effects into the OSS is presented. An important issue to be considered in this method is the target time in which the OSS is defined to be achieved. The application of this method to two different structures showed the convenience of defining the OSS to be achieved at early times because that way the envelope of service stresses is reduced.

Determination of Effective Flange Width in Single Plane Cable-Stayed Concrete Bridge (1면 케이블 콘크리트 사장교의 유효플랜지폭 결정에 관한 연구)

  • Lee, Hwan-Woo;Kim, Kwang-Soo;Kang, Ho-Jun
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.23 no.4
    • /
    • pp.343-351
    • /
    • 2010
  • Bending and axial compressive stresses are distributed across the whole upper flange of a box girder bridge which has the span-to-depth ratio (B/L) of below 0.5, according to Korea Bridge Design Specifications (Minister of Land, Transport and Maritime Affairs, 2005). Shear lag phenomenon, however, can take place in the construction phase of cable-stayed bridge, in which stresses combining bending moment due to dead weight and cable vertical compression are induced. This study aims to analyze the effective width of flange over which composite stresses are given, which should be calculated during the construction phase of stiffening girder of single plane cable-stayed box girder bridge. The study results indicate that the full width of stiffening girder can be regarded as the effective flange width when the span-to-depth ratio for the deck is below 0.38. In other words, the area, where shear lag is taken into consideration, is larger than the width of box girder in single plane cable-stayed box girder bridges. Therefore, the current practice of considering the full width as the effective flange width regardless of changes of the span-to-depth ratio during the construction stage can produce an unsafe bridge. If the effective flange width is determined according to the single span structural system in the early stage of construction when the span-to depth ratio for the deck is high and composite stresses of every part expect each end of the bridge are calculated, it can result in a safe structural design. Since the span-to-depth ratio gradually decreases, however, it is appropriate to determine the effective width of flange on the basis of the full width and the cantilever structural system.

Concrete arch bridges built by lattice cantilevers

  • Granata, Michele Fabio;Margiotta, Piercarlo;Recupero, Antonino;Arici, Marcello
    • Structural Engineering and Mechanics
    • /
    • v.45 no.5
    • /
    • pp.703-722
    • /
    • 2013
  • In this paper a study about concrete arch bridges built by lattice cantilevers is presented. Lattice cantilevers are partial structures composed of deck, arch, piers and provisional steel diagonals, organized as reticular cantilever girders, in order to build arch bridges without the use of centrings, supports or temporary towers. Characteristics of this construction methodology with its variants are explained together with their implications in the erection sequence. Partial elastic scheme method is implemented in order to find initial forces of temporary cables and a forward analysis is carried out to follow the actual sequence of construction, by extending a procedure already applied to concrete cable-stayed bridges and to arches built by the classical suspended cantilever method. A numerical application on a case-study of a concrete arch bridge is performed together with a comparison between different methodologies followed for its construction sequence. Differences between erection by lattice cantilevers and cable-stayed cantilevers, are discussed. Results can be useful for designers in conceptual design of concrete arch bridges.

Buckling Stability in the deck Steel Girder of Cable stayed Bridge Considered Nonlinear Behavior of Stay Cable (케이블의 비선형 가동효과를 고려한 사장교 강거더의 좌굴 안전성 평가)

  • Choe Hak-Ze
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2005.04a
    • /
    • pp.129-139
    • /
    • 2005
  • The focused topic according to be slender and longer of cable stayed bridge's main span is as follows (1) Aerodynamic stability (2) Lateral movement of stiffening girder caused by wind force during and after construction (3) Global bucking of stiffening girder caused by axial force Among this, the number 3 has not received much attention in the past due to high buckling safety factor of stiffening girder. However, according to be slender of stiffening girder, the topic of buckling stability of girder is not any more unconcerned subject. The purpose of this paper is to examine the effect of stay cable's nonlinear behavior on the buckling stability of cable-stayed bridge.

  • PDF

Hybrid Deck System for Partially Earth Anchored Cable Stayed Bridges (부분 인장형 사장교 주형의 복합 구조)

  • Cho, Jae-Young;Noh, Junghwi;Kim, Jung Joong
    • Journal of the Korean Society for Advanced Composite Structures
    • /
    • v.4 no.4
    • /
    • pp.30-36
    • /
    • 2013
  • Partially earth anchored (PEA) can improve the structural safety and economic feasibility of multiple span cable stayed bridge (CSB). The PEA-CSB can restrain axial compressive load acting on a tower and reduce the global buckling length of a stiffened girder. For these reasons, structural members subject to axial forces can be effectively utilized and material quantity required for a steel deck can be reduced to save construction cost. In this study, the PEA system was verified for its application on a multiple span CSB. The CSB is a four-tower multi-span bridge which has a main span length of 500 m. As high tensile stress was generated at the top of the bridge decks at the mid-span between two main columns, a hybrid deck system for enhancing the bridge deck sections was proposed. While the composite sections made of concrete and steel were used near to the main columns, steel sections were used at the mid-span between two main columns.

Dynamic analysis of a cable-stayed bridge using continuous formulation of 1-D linear member

  • Yu, Chih-Peng;Cheng, Chia-Chi
    • Earthquakes and Structures
    • /
    • v.3 no.3_4
    • /
    • pp.271-295
    • /
    • 2012
  • This paper presents the solution scheme of using the continuous formulation of 1-D linear member for the dynamic analysis of structures consisting of axially loaded members. The context describes specific applications of such scheme to the verification of experimental data obtained from field test of bridges carried out by a microwave interferometer system and velocimeters. Attention is focused on analysis outlines that may be applicable to in-situ assessment for cable-stayed bridges. The derivation of the dynamic stiffness matrix of a prismatic member with distributed properties is briefly reviewed. A back calculation formula using frequencies of two arbitrary modes of vibration is next proposed to compute the tension force in cables. Derivation of the proposed formula is based on the formulation of an axially loaded flexural member. The applications of the formulation and the proposed formula are illustrated with a series of realistic examples.

New Technical Method in Incheon Bridge (인천대교와 신기술들)

  • Yoon, Man-Keun
    • Journal of the Korean Professional Engineers Association
    • /
    • v.39 no.6 s.189
    • /
    • pp.42-48
    • /
    • 2006
  • This is briefly to introduce about design and construction method newly adopted in Incheon bridge construction site. The Incheon Bridge Project are divided into 3 parts, that is Cable Stayed Bridge. Viaduct Bridge and Approach Bridge. In this paper, we will describe overview and construction sequence of each kind part.

  • PDF