1 |
DM Engineering (2003), "Analysis of Composite Cable Stayed Bridge using Program SES," IABSE.
|
2 |
ARUP (2010), "LongSpanBridgeResearch".
|
3 |
ARUP (2011), "LongSpanBridgeResearch-Phase2".
|
4 |
Niels J. Gimsing, Christos T. Georgakis, (2012), "Cable Supported Bridge," 3rdEdition, pp. 239-265, pp. 346-351.
|
5 |
DM Engineering (2011), "Design of FCM- Anchored Hybrid Cable-Stayed Bridge in New Millennium LOT1," KIABSE.
|
6 |
DM Engineering (2006), "The Composite Girder Design of Busan-Geoje Fixed Link Cable Stayed Bridge," ISSS.
|