International conference on construction engineering and project management
/
2020.12a
/
pp.188-197
/
2020
Due to hazardous working environments at complex, unstructured, and dynamic construction sites, workers frequently face potential safety and health risks throughout the construction process. In this regard, addressing safety challenges remains one of the top priorities. Construction workers' ability to identify and assess risks is acquired through training, which is one of the primary key factors to determine their safety and wellbeing in hazardous working environments. As such, safety managers constantly focus on the effectiveness of the training materials provided to the workers. However, the construction workers are considerably at greater risk of injuries and fatalities compared to the workers in other industries. In this regard, further studies are required to build up a body of knowledge on the conventional safety training approaches as well as their evaluation techniques in order to boost up the adoption by the practitioners in a widespread manner. This paper provides a systematic review of the current safety training approaches and the various techniques for measuring their effectiveness. The attributes of the current safety training methods for construction workers and their evaluation techniques are identified and analyzed. Results indicated that: 1) immersive environment-based training methods are effective than the traditional safety training methods; 2) this effectiveness can be empirically supported by evaluation strategies, but the current techniques are subjective, intrusive, and error-prone. This research offers fresh opportunities to investigate the training strategies by objectively monitoring the physiological responses of construction crews. The results of this study can be used by researchers and practitioners to identify and determine optimal safety training programs that could potentially become ubiquitous in the construction industry.
For the construction safety manager, it is expected that job stress is significantly high due to lack of expertise about new technology, new construction methods, and enlargement of scale as well as due to work intensity and unstable work hours. It is probable that such an increase in job stress not only has bad effects on individual, but also the bad effects spread to construction industry at large, resulting in rise in accident rate, increase in direct and indirect loss cost, and loss of reputation. In this context, methods for controlling construction safety manager's job stress are needed at the levels of both government and company. Therefore, this study investigated and analyzed the effects of construction safety manager's job stress on job satisfaction and job commitment, and proposed methods for relieving job stress. In addition, this study was suggested policies for higher job satisfaction and job commitment at the levels of the government and companies.
Donguk Oh;Younghoon Lee;Ung-Kyun Lee;Nakju Lett Doh;Hunhee Cho;Kyung-In Kang
International conference on construction engineering and project management
/
2009.05a
/
pp.1088-1093
/
2009
To improve construction productivity and quality, and to make the construction environment safe, a new system, Robot-based Construction Automation (RCA), is currently being developed in Korea. To determine whether RCA is an improvement over traditional construction methods (TCMs), an evaluation method, called the Performance Evaluation Index (PEI), is suggested for RCA. The PEI considers the relationships among the factors influencing the performance of the system obtained using the Delphi method and the analytic hierarchy process (AHP). As the evaluation shows, RCA is much better than TCM except for three factors: the rate of work success, quality improvement by learning experience, and construction duration.
Kim, Jang-Ook;Lee, Young-Lae;Hong, Seong-Wook;Doh, Sun-Boong;Lee, Han-Seung
Proceedings of the Korean Institute of Building Construction Conference
/
2012.05a
/
pp.235-242
/
2012
In recently constructed building, It has become fashionable again that the heavy external skin system such as a Stone Finished Envelope. There are Squared Steel Pipe Methods, C-Shaped Steel Pipe Methods, and Aluminum Beam Methods in the structure of a heavy external skin system. The Aluminum Beam Methods is often misunderstood as a Plane Truss Structure, but this method is not appropriate to be called to a truss structure but a beam methods. The Aluminum Beam Methods is the most Eco-friendly methods in terms of Quality assurance, Efficiency, Safety, Construction period, Durability, and Recyclability. And this Methods is also very appropriate in considering the point of Energy conservation, Waste reduction, Long-life architecture, Replacement parts, Environmental protection, Public efficiency, and Building demolition.
Journal of the Korean Institute of Landscape Architecture
/
v.33
no.1
s.108
/
pp.33-48
/
2005
The purpose of this study was to discover the landscape visual image of the slope scene and their harmony with surrounding sceneries. This research utilized the basic study tool of psycho-physics and processed the case study of ten types of slope construction scene along the highway. The analysis was performed by the data obtained from the questionnaires and the photos for the slope construction scene. The questionnaires for analysis the image of the slope construction scene and their harmony with surrounding sceneries were designed using semantic differential scale and 5 point Likert-scale. The major findings were as follows. 1. At the part of the visual preferences analysis, the slope revegetation methods showed high level of preferences generally than on the slope structure methods. While the slope revegetation methods were estimated friendly, continuity, harmonious, soft, light and wide, the slope revegetation methods were estimated unstable, female, static, simple, omnipresent, appeared as policeman of weak inclination. Also the slope structure methods were estimated stable, manly, complicated, steep and healthy but rough, unharmonious, unfamiliar and heavy. 2. Psychological factors, related to the satisfaction for the slope revegetation methods were composed of three factors, aesthetic, individuality and physical character. And the slope structure methods were composed of five factors, aesthetic, individuality, stability, physical character, and complexity. 3. At the part of harmony with surrounding landscapes, the slope revegetation methods were evaluated highly but the slope structure methods received the lowest evaluation. Also the harmony analysis with surrounding view on the slope revegetation methods showed degree of high more than average in all texture, form, color and scale but the slope structure methods showed degree of fewer than average degree in form, scale, color and texture.
Proceedings of the Korean Institute of Building Construction Conference
/
2012.05a
/
pp.205-208
/
2012
Recent the free-formed architecture is smearing as a trend with the development of the digital equipment and technologies. The development of new method based on digital technology is required for the free-formed structure,, because the conventional construction methods are limited to shorten the construction period and to ensure the construction quality. Particularly, the development of the new method for the free-formed concrete structure is important. In this study, the developed method of the T-shape lightweight steel fabricated using CNC can control the geometries of the free-formed concrete structure based on the digital design. Also, new method is effective to ensure the precision of the construction and economic than the conventional construction methods.
International conference on construction engineering and project management
/
2015.10a
/
pp.304-309
/
2015
On construction sites, it is important to monitor the performance of construction equipment and workers to achieve successful construction project management; especially, vision-based detection methods have advantages for the real-time site data collection for safety and productivity analyses. Although many researchers developed vision-based detection methods with acceptable performance, there are still limitations to be addressed: 1) sensitiveness to the shape and appearance changes of moving objects in difference working postures, and 2) high computation time. To deal with the limitations, this paper proposes a detection algorithm of construction equipment based on Integral Channel Features. For validation, 16,850 frames of video streams were recorded and analyzed. The results showed that the proposed method worked in high performance in terms of accuracy and processing time. In conclusion, the developed method can help to understand useful site information including working pattern, working time and input manpower analyses.
Deformational characteristics of subgrade soils are important properties in the mechanistic analysis and design of pavement system. In this study, to evaluate the effect of specimen construction methods on deformational characteristics of subgrade soils in Korea, resonant column tests were performed for specimens constructed by various methods. Specimen construction method affected to the modulus value but the variation in the normalized modulus reduction curve was almost identical. The effects of specimen construction method on modulus are decreased with increasing confining pressure. The average maximum variation in the modulus value with different specimen construction methods was estimated as 16.8%. The differences in the modulus value of the specimens with same water content and dry density conditions that made by gyratory compaction and impact compaction were very small within 5.2%. The impact compaction method was proposed as a specimen construction method for determining the design input parameter testing considering that impact compaction method is much simpler and require less expensive specimen construction equipment and setup than gyratory compaction method.
Korean Journal of Construction Engineering and Management
/
v.8
no.5
/
pp.182-190
/
2007
The minor construction companies in Korea have grown in focusing on the construction operation field. Also, soft field is vulnerable area, and there are not enough delivery systems, therefore, a capacity of the construction industry expansion and productivity is insufficient. Furthermore, the minor construction companies are losing their areas, because the major construction companies having numerous know-how and ample funds are competitive. As the construction industry are more larger and complicated, the design build methods might be increased in the construction industry and the minor construction companies could have more competitive. Hence, this paper analyzes the success factor in minor construction projects by design build methods focusing on instance $company^{\circ}{\phi}s$ case and survey, and critical success factor deduction and importance degree analysis of this factor using AHP analysis. In addition, this paper gives fundamental data how to manage the construction project effectively for minor construction $companies^{\circ}{\phi}s$ expansion in near future.
Journal of the Korea Institute of Building Construction
/
v.7
no.1
s.23
/
pp.99-106
/
2007
Water leakage could be caused deterioration of environmental conditions, user condition, reduction of life span and long term safety in underground concrete structure. Many materials and construction method to repair on these problems have been developed, however, it is not proper to successful repair or raise problem of increasing repair cost However, there are many limitations as practical appraisal methods due to different view of reliability for test methods. Because, it was not enough that the technical objectivity could be lack and also application of environmental condition is inadequate. In this paper, we suggest varied test methods divided to appraisal for property of matter, construction, manufacturing, specification and maintenance, friendly environmental condition. It could be more practical as a objective standard considering various angles. In summery, it should be subdivided and differentiated to accomplish proper application and to select proper materials and construction method for repair even if the synthetical condition is very complicated.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.