• Title/Summary/Keyword: construction methodology

Search Result 1,395, Processing Time 0.034 seconds

A Study on the Physical Properties of Insulation Materials according to the Period of Building Construction (건축물 준공년수 경과에 따른 단열재의 물성변화에 관한 연구)

  • Kim, Hyun-Jin;Choi, Se-Jin
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2018.11a
    • /
    • pp.92-93
    • /
    • 2018
  • This study analyzed the physical properties of insulation materials upon completion of building completion years and found the suitability of the current energy performance analysis methodology to apply the insulation specified in the design drawings to the same thermal conductivity values as the new materials.

  • PDF

Direction for Improving Cost Estimation and Management of Construction Projects : Comparing to Australian System (건설공사 공사비 예측 및 관리기술 발전방향 : 호주 사례를 중심으로)

  • Ji, Sae-Hyun;Park, Moon-Seo;Lee, Hyun-Soo;Yoon, You-Sang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.2
    • /
    • pp.170-181
    • /
    • 2008
  • Cost of construction project have to be estimated based on drawing before execution. Cost estimate and check would be performed numerously for preparing general outline of requirements and determining the budget at conceptual planning stage, for obtaining decision on every matter related to design, specification, construction and cost at design stage, and for predicting bidding cost. Thus, importance of cost estimation cannot emphasize too much in construction. However, there are lack of standard estimation method, process, and cost analysis method, that square foot estimation method is as used as eyer, in Korea. Thus, This research present the direction for improving cost estimation and management in construction; It is demanded that establishing standard data base methodology, multi-level database model CUBE, and standard cost planning process, choosing cost estimation methodology according to objectives and cost planning process, and making more experts.

An Examination of a Risk Assessment Method and Analysis of Defect Types of Apartment Finishing Works (공동주택 마감공사의 하자유형별 분석 및 위험성 평가 방법에 관한 연구)

  • Son, Seunghyun;Lee, Jae-hyeon;Son, Kiyoung
    • Journal of the Korea Institute of Building Construction
    • /
    • v.24 no.2
    • /
    • pp.249-260
    • /
    • 2024
  • In recent years, the proportion of medium and small-sized apartments within the housing market has seen a noticeable increase, alongside a corresponding rise in disputes related to construction defects. Such disputes are most prevalent in the finishing works phase of construction, which not only are frequent in occurrence but also impose significant repair costs. Furthermore, there is a noticeable scarcity of research focused on the quality management of finishing work defects prior to the completion of construction. Addressing this issue necessitates a methodology capable of preemptively identifying defects by analyzing their frequency and associated costs across various defect types. Consequently, the aim of this study is to propose a risk assessment methodology by conducting an analysis of defect cases across 3,299 apartment units, considering aspects such as frequency and severity. The outcomes of this research endeavor are expected to offer practical management strategies to enhance the quality of apartment finishing works and serve as an academic foundation for the enhancement of construction management systems pertaining to apartment finishing works.

An Effective Management of Construction Insurance (건설공사보험의 효율적 관리방법)

  • Yang Jin-Kook;Kim Soo-Yong
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.319-324
    • /
    • 2003
  • There is much more possibilities of encounter of critical problems and uncertain factors in construction project it is very important to analyze various risk factors of the project in its first stage. Because of the uncertainty, we need to study about the construction insurance scheme for risk-transfer within construction management method. This research methodology has been devised through analysis of characteristic of classified domestic construction insurance as well as some related foreign insurance system.

  • PDF

ENVIRONMENTAL ECONOMICS FOR CONSTRUCTION

  • Suk hyun Kwon;Nam Ho Cho;Kyoung Hee Lee;Kyoung Ju Kim
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.280-285
    • /
    • 2011
  • This study aims to propose an assessment model on environmental economics which will provide useful information in making a decision for the implementation of pro-environmental and economical construction projects. To meet the objective, this study suggests a procedure to estimate environmental cost of construction projects. The model combines environmental load assessment and environmental value assessment. The environmental cost of pollutant generated from the construction project was estimated utilizing the Contingent Valuation Method (CVM) which is a value assessment method borrowed from economic science. The devised model is expected to provide a useful methodology that will scientifically support the planning and management of sustainable construction not only in the environmental aspect but also in the economical aspect.

  • PDF

Development of Integrated Cost-Schedule Management Guidelines for EPC Modular Projects (EPC 모듈러 프로젝트의 원가·공정 통합연계관리 지침서 개발)

  • Kim, Donghee;Ha, Minhui;Choi, Jaehyun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.3
    • /
    • pp.76-84
    • /
    • 2020
  • The rate of application of the modular plant in the plant industry is increasing, and for the success of the modularization projects, it is essential to develop and implement a systemized methodology across all phases of the project. However, Korean EPC firms lack project management capability when it comes to apply standardized methodology. Therefore, it is important to establish and systematize the cost/schedule integrated management method which are the two core elements of project management technology. This study was conducted to develop a methodology and guidelines for integrated management process for modular plant projects. The researchers developed a methodology for planning and managing cost and schedule, and integrated by module unit. Integrated cost and schedule methodology and guidelines developed can be used for various EPC modular plant projects to enhance the efficiency of project management.

A Study on the Selection of Construction Method by Decision Making Method (의사결정기법을 통한 건축공법선정에 관한 연구)

  • Yang, Keek-Young;Yoon, Yer-Wan
    • Journal of the Korea Institute of Building Construction
    • /
    • v.2 no.1
    • /
    • pp.147-154
    • /
    • 2002
  • In the Past, The selection of individual method of construction was done by head of construction site or an experienced person very frequently. By doing this, The wrong selection of construction method without exact adjudication of construction site situation lead to increasing of cost and extension of construction term. Finally it will effect all over the construction process. Especially, In case of underground construction in the beginning, there are a lot of a variable factor and it also effect on the entire construction process and it need very careful process. The purpose of this study is to present the best suitable methodology for selection of construction method by considering potential risk of construction method and variables together with external condition for underground construction. The purpose of this study Is to select the most suitable construction method by analysing potential conditions(construction site situation and client request in designing ) To do this, We prepared arrangement rule to arrange the conditions for construction method. And thin make checklist of the analyzing construction method. Though above process, To expect the risk of individual construction method using above risk checklist and using Analytic Hierarchy process among Multiple-Criteria Decision making, the professional opinions is to be adapted. By doing this, it can lead and select the most suitable construction method considering the data which get from risk density test.

A Study on the Selection of Underground Construction Method by Risk Analysis (리스크 분석을 통한 지하 구조체 공법 선정에 관한 연구)

  • 윤여완;양극영;홍성휘
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2001.11a
    • /
    • pp.99-117
    • /
    • 2001
  • In the past, The selection of individual method of construction was done by head of construction site or an experienced person very frequently. By doing this, The wrong selection of construction method without exact adjudication of construction site situation lead to increasing of cost and extension of construction term. Finally it will effect all over the construction process. Especially, In case of Underground construction in the beginning, there are a lot of a variable factor and it also effect on the entire construction process and it need rely careful process. The purpose of this study is to present the best suitable methodology fer selection of construction method by considering potential risk of construction method and variables together with external condition for Underground construction. The purpose of this study is to select the most suitable construction method by analysing potential conditions(Construction site situation and Client. Request in designing) To do this, We prepared arrangement rule to arrangement conditions for construction method. And then make Checklist the analyzing construction method. Though above process, To expect the risk of individual construction method using above risk checklist and using Analytic Hierarchy Process among Multiple-Criteria Decision Making, the professional opinions is to be adapted. By doing this, It can lead and select the most suitable considering method considering the data which get from risk density test.

  • PDF

New methodology to prevent blasting damages for shallow tunnel

  • Ozacar, Vehbi
    • Geomechanics and Engineering
    • /
    • v.15 no.6
    • /
    • pp.1227-1236
    • /
    • 2018
  • From all of the environmental problems, blast-induced vibrations often cause concern to surrounding residents. It is often claimed that damage to building superstructures is due to blasting, and sometimes the building owner files a lawsuit against the company that perform blasting operations. The blast-vibration problem has been thoroughly investigated in the past and continues to be the subject of ongoing research. In this study, a tunnel construction has been performed by a construction company, according to their contract they must have used drilling & blasting method for excavation in tunnel inlet and outlet portal. The population is very condensed with almost tunnel below in the vicinity houses of one or two floors, typically built with stone masonry and concrete. This situation forces the company to take extreme precautions when they are designing blasts so that the blast effects, which are mainly vibration and aerial waves, do not disturb their surrounding neighbors. For this purpose, the vibration measurement and analysis have been carried out and a new methodology in minimizing the blast induced ground vibrations at the target location, was also applied. Peak particle velocity and dominant frequencies were taken into consideration in analyzing the blast-induced ground vibration. The methodology aims to employ the most suitable time delays among blast-hole groupings to render destructive interference of surface waves at the target location.

Real-time Knowledge Structure Mapping from Twitter for Damage Information Retrieval during a Disaster

  • Sohn, Jiu;Kim, Yohan;Park, Somin;Kim, Hyoungkwan
    • International conference on construction engineering and project management
    • /
    • 2020.12a
    • /
    • pp.505-509
    • /
    • 2020
  • Twitter is a useful medium to grasp various damage situations that have occurred in society. However, it is a laborious task to spot damage-related topics according to time in the environment where information is constantly produced. This paper proposes a methodology of constructing a knowledge structure by combining the BERT-based classifier and the community detection techniques to discover the topics underlain in the damage information. The methodology consists of two steps. In the first step, the tweets are classified into the classes that are related to human damage, infrastructure damage, and industrial activity damage by a BERT-based transfer learning approach. In the second step, networks of the words that appear in the damage-related tweets are constructed based on the co-occurrence matrix. The derived networks are partitioned by maximizing the modularity to reveal the hidden topics. Five keywords with high values of degree centrality are selected to interpret the topics. The proposed methodology is validated with the Hurricane Harvey test data.

  • PDF