• Title/Summary/Keyword: construction management(CM)

Search Result 440, Processing Time 0.022 seconds

Transition of Domestic Construction Management Market Structure (국내 건설사업관리 시장의 구조적 변화 분석)

  • Yun, Ha-Jung;Kim, Ji-Sun;Lee, Yoon-Sun;Kim, Jae-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.11a
    • /
    • pp.277-278
    • /
    • 2012
  • After the introduction of CM(construction management) for improving productability in construction industry, the CM market was shown to actively grow shape until 2007 but suddenly appears passive movement of the market after in 2008. However, on one hand, the CM corporations has increased, because the construction supervision market come to the CM market area by reduction their work place. Because of this, it was discussed that will intensify competition between companies in the CM market. Therefore, this paper want to analyze to status of the CM market structure for studying about the CM industry status and change during last 3 years. As a result, by decreasing the Market concentration, the CM market competition rate did not too high with business despite that CM market downsize and has been increased the number of companies.

  • PDF

A study on the customer satisfaction measurement of CM services (CM서비스에 대한 고객만족도 측정에 관한 연구)

  • Kwon, Soon-Seok;Park, Yong-Ho;Yu, Jung-Ho;Kim, Chang-Duk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.326-331
    • /
    • 2006
  • The Construction Management(CM) was adopted to the domestic construction industry 10 years ago, but it has suffered from so many problems. Therefore, this study intends to contribute to the development of the CM through suggesting the method which measures the service quality of the CM and the customer satisfaction. The most important thing of this method is SERVQUAL which is a multiple-item scale for measuring consumer perceptions of service quality. In order SERVQUAL which is widely used in the service industry to be applied to the CM field, this study modifies SERVQUAL partially and comes up with the detailed analysis way through the case research and then, finally considers the practical use and the problem of this method.

  • PDF

Development Of a Project Sensitive Matrix Model For CM Fee Calculation (건설사업관리 대가 산출 모델의 방향 설정에 관한 연구)

  • Kee JunHo;Kim ChangDuk;Kim Yea-Sang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.1 no.4 s.4
    • /
    • pp.91-97
    • /
    • 2000
  • Construction Management(CM) has been introduced in Korean Construction Industry for its merits and benefits proven in International Construction Industries. However, many regulations, standards, manuals and details of practices considering its constituents and industry conditions have not yet to be developed. Of these, the standards and details of CM fee calculation should be developed in order to stretch its application toward public construction sectors as well as the private sectors. This research proposes CMFM(Construction Management Fee Model), a project sensitive matric CM fee model for CM fee calculation. The model calculates CM fees for modular services in a two by two matrix taking project phases on one dimension and CM services on the other.

  • PDF

A study on the status and improvement of construction management in Gwangjin-Gu Culture & Sports Center (광진구민회관의 건설사업관리 적용현황과 개선방향에 관한 연구)

  • Jung Jae-Jin;Yoo Byeong-Gi
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.32-39
    • /
    • 2003
  • Owners, local autonumous entities, have a burden on operating project for the lack of their management capacity such as specialty and human resources. In this reason, they want to perform project with CM methods. But there have been only a few case of CM operation and application in a huge construction project. The complex formations of CM and responsible management are used in those project. This situation originates in the lack of CM specialist. Because the CM service used in those case is generally performed as the mixture of responsible management service and design management service, it is not the prototype of CM. The purposes of this study are to present the solutions to the problems concerned with the design development phase management, design phase VE, the application of Fast-Track, PMIS operation and CM execution, etc, and establish the plan to perform CM services efficiently in the public sector through analyzing the case of CM application in Gwangjin-Gu Culture & Sports Center.

  • PDF

A Case Study of the Construction Management Applied to I-Project (I-프로젝트의 건설사업 관리(Construction Management) 적용사례)

  • Kim Jong-Hoon;Seo Bong-Whan
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.102-112
    • /
    • 2001
  • It has been passed $5\~6$ years since Construction Management introduced in Korea, but a few government projects have been presented as CM instances. We performed CM service, on behalf of the foreign Client, in the Insa-dong construction, I-Project. Even though there were many limits in cost, time and other aspects, we have attained satisfaction of the Client and successful businesses of all the construction parties as adopting the advanced management methods. Many advanced construction methods have been applied for the purpose of time reduce, cost save and quality assurance as well as to the webbased project management has been imported to overcome the limits of time and place. They have actualized to increase the productivity of the project by managing the floor to floor cycle and quality systemically pursuant to ISO 9002, and by adopting Real-name construction and completion system (or individual activity. While carrying out this project, it is possible to establish mutual reliability and understanding enable to resolve the issues occurring in the early stage due to insufficient understanding of CM, lack of communications and team work, indistinct work scope through continuos training and conferences. Additionally, we became to share business targets among the parties and promoted the project in confidence. We wish that the success of I- project to be rated as a standard model of CM in Korea.

  • PDF

Analysis of Construction Management Business Survey Index (CM기업경기실사지수 분석에 관한 연구 - 2010년 3분기를 중심으로 -)

  • Lee, Eui-Dong;Kim, Han-Soo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.3
    • /
    • pp.83-90
    • /
    • 2011
  • Although the CM(construction management) market in Korea has shown rapid growth, unlike other market sectors, there has been lack of a system by which the economy trend of the CM market can be analyzed. The objective of the paper is to analyse and identify key characteristics of the CM market as of the third quarter of 2010 by using the CMBSI(Construction Management Business Survey Index) which was proposed in the previous study. In the paper, the CMBSI is used as the main index along with other five supplementary indices. The use of the CMBSI can contribute to enhancing the understanding of CM market situation and prospect, and also to providing information for CM policy and regulations.

Study on Development of Construction Management Module based on Risk factor classification system at Construction Phase (시공단계 위험요소 분류체계 구축을 통한 건설 프로젝트 관리모듈 개발에 관한 연구)

  • Lee, Joo-Sung;Moon, Sung-Kon;Jun, Yeong-Jin;Kim, Ju-Hyung;Kim, Jae-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2009.05b
    • /
    • pp.199-202
    • /
    • 2009
  • Turn-key and CMF(CM for Fee) have been selected as procurement paths of large public projects in Korea. However, recently, researches and discussions on CMR(CM at Risk) have been popular as the Korean government seeks for alternative procurement paths to enhance the performance. In the CMR projects, the part who is responsible for construction management should predict and control the potential risks for guaranteeing benefits. In this research, CMR projects in which a general contractor plays the role as CMr is mainly analyzed. We give attentions to risk management during construction process given that subcontractors, main parts in this phase, work in various ways and thus more chances for faults exist. In this case, CMr manages risks to control the procedure of project. So, potential risk factors can constitute the database, and that database can be matched to following activity. And construction manager can forecast measures of risk using the result of matching. This chain of activities increase efficiency in roles of CMr on CMR(CM at Risk). Furthermore this study will propose one of the solution of Construction Management Module.

  • PDF

A Study on the Role of Construction Management in the Construction Turn-Key Projects (턴키사업과 CM의 역할)

  • Kim Kyung-Nam;Kim Jong-Hoon
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.223-232
    • /
    • 2002
  • The government, in order to settle and activate the use of Construction Management (CM) method, clarified the legal Issues pertaining to infrastructure development and is taking an active role to promote CM through government sponsored pilot projects. However, when a CM method is applied to a turn-key protect, many applicational difficulites are expected. With design and construction are performed under the simple responsibility in a turn-key method, roles of CM's is overlapped. Also, the characteristics of turn-key method are not reflected to the present $\lceil$CM Work Guideline$\rfloor$. Over the years, various problems have been identified from turn-key projects. Korea's $\lceil$CM Work Guideline$\rfloor$ is more inclusive compared to the CM services of CMAA and overlooks the importance of CM's roles in pre-design phase. In this study, CM's roles of pre-construction phase (pre-bidding, bidding, detail design, contracting) in construction turn-key projects were identified and complementary policy for institution was suggested. We further look into dividing the roles of the CM at turn-key project Into professional role and emotional role. Also, we speculate problems of the existing experience in turn-key projects and suggest a rough methodology on how these concepts can be adjusted for improve the turn-key method.

  • PDF

The Method Improving the Productivity of a Project through Construction Management Techniques (CM의 요소기술을 이용한 프로젝트의 생산능력향상)

  • Yoon Tae-Kwon;Chung Jai-Young
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2005.05a
    • /
    • pp.133-136
    • /
    • 2005
  • This study provides the method how to improve the productivity of a project using CM's constitutive methods. Construction industry in Korea was protected by the government and they have been grown with only their construction technology until today. It results Korean Construction is behind the advanced countries in terms of Engineering fields and construction management skills. This study compares the difference between the construction system of Korea and Europe and Asia. And then, it proposes the method how to compete with the other countries. which introduce the CM technique into the construction project in the beginning stage. Hopefully, this study is recognised as the basic strategy to improve the capability of Korean construction management.

  • PDF

Diagnostic Analysis and Influential Factors of CM Fee Estimation (CM 대가 산정방식의 문제점 분석에 대한 연구 -문화예술회관 사례를 중심으로-)

  • Yoo, Byeong-Gi;Jung, Chan-Young;Kim, Jae-Jun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.6
    • /
    • pp.132-140
    • /
    • 2006
  • On December, 1996, Construction Management(CM) was introduced in Korean construction industry due to its managerial efficiency proven in the international construction industries. However, It have had serious problems with many regulations, standards, manuals and details of practices considering its constituents and industry conditions. Especially, there were controversial points in the CM fee estimate; difference between the fee on the owner's view point and that from contractor's that impedes appropriate CM services. Therefore, this paper is to analyze public construction projects into Cm fee calculation such as fee as a percent of construction cost, cost plus fixed fee and contract price, and analyzed what is irrationality and why irrationality is made. So it makes a contribution to a study on standards for paper CM fee calculation.