• 제목/요약/키워드: construction equipment operation

검색결과 375건 처리시간 0.024초

초고층 골조공사의 통합 장비 운영을 위한 장비 간의 간섭요소 분석 (Analysis of Interference Elements for the Integrated Equipment Operation in Tall Building Construction)

  • 이동윤;임현수;김백중;조훈희;강경인
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2013년도 춘계 학술논문 발표대회
    • /
    • pp.173-175
    • /
    • 2013
  • In tall building construction, the equipment operation plans have an effect on productivity. Equipment, used in tall building construction, has operating plans of each it and restrictively operate owing to the first placed equipment operation. Therefore the interference of equipment was occur frequently. As it, the productivity is less effective and the construction delay occurs. This research was analysis the interference elements between the equipment for constructing the efficient equipment associated operational processes. The interference elements between the equipment derive through expert advice and analysis using IPA. Through the IPA, this research deducted the interference elements located 'Concentrate Here' which is the highest importance and the lowest performance.

  • PDF

에너지 절감을 위한 건설장비 조합 최적화 방법 연구 (Construction Equipment Fleet Optimization for Saving Fuel Consumption)

  • 이창용;이홍철;이동은
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2015년도 춘계 학술논문 발표대회
    • /
    • pp.198-199
    • /
    • 2015
  • Construction equipment is a major energy consumption source in construction projects. If 10% reduction of the diesel fuel usage is achieved in the construction industry, it may reduce 5% of the total energy usage. Energy saving operation is a major issue in equipment-intensive operations (e.g., earthmoving or paving operations). Identifying optimal equipment fleet is important measure to achieve low-energy consumption in those operations. This study presents a system which finds an optimal equipment fleet by computing the low-energy performance of earthmoving operations. It establishes construction operation model and compares numerous combinations using alternative equipment allocation plans. It implements sensitivity analysis that facilitates searching the lowest energy consumption equipment fleet by enumerating all cases.

  • PDF

Optimization of Earthwork Operation for Energy-saving using Discrete Event Simulation

  • Yi, Chang-Yong;Lee, Dong-Eun
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.537-539
    • /
    • 2015
  • considerate operation is a major issue in the equipment-intensive operation. Identifying an optimal equipment combination is important to achieve low-energy operations. An Earthwork operation planning system, which measures the energy consumption of construction operations by taking into account construction equipments' engineering attributes (e.g., weight, capacity, energy consumption rate, etc.) and operation conditions (e.g., road condition, attributes of materials to be moved, geometric information, etc.), is essential to achieve the low-energy consumption. This study develops an automated computerized system which identifies an optimal earthmoving equipment fleet minimizing the energy consumption. The system imports a standard template of earthmoving operation model and compares numerous scenarios using alternative equipment allocation plans. It finds the fleet that minimizes the energy consumption by enumerating all cases using sensitivity analysis. A case study is presented to verify the validity of the system.

  • PDF

다목적 복합 센서를 이용한 건설 장비 성과율 측정 알고리즘 개발 (Development of Algorithm for Measuring Performance Rate of Construction Equipment using a Multipurpose Composite Sensor)

  • 권재범;김춘학;김창원;조대구;조훈희
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2012년도 추계 학술논문 발표대회
    • /
    • pp.9-10
    • /
    • 2012
  • Efficient operation of construction equipment has become more and more important in the competitive construction environment. Accurate measurement of performance rate of construction equipment is a critical factor for a construction project planning. However, it might be quite difficult to measure the performance rate due to diverse practical limitations such as continuously variable performance rate of construction equipment, considerable indirect cost, large construction field, and so on. Therefore, the purpose of this paper is to propose an automatic algorithm that measures a performance rate of construction equipment with a multipurpose composite sensor. It is expected that the algorithm compiles database on construction equipment and in advance, facilitates efficient operation of construction equipment.

  • PDF

Attributes for Developing a Database for Construction Information Interface

  • Moon, Sungwoo;Cho, Kyeongsu
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.673-673
    • /
    • 2015
  • Earthwork is an operation that provides space for structures, and it takes up a large portion of the construction costs in a construction project. In large-scale earthwork, numerous types of construction equipment are used in the operation. The types of equipment should be selected based on the field conditions and the construction methods. These construction vehicles are constantly changing positions during the earthwork operation. Therefore, the equipment operators require effective communication to ensure the efficiency of the earthwork operation. All equipment operators should exchange information with the other equipment operators. Information should be exchanged continuously to support decision making and increase productivity during the earthwork operation at the construction site. This paper investigates the attributes required for an information interface between construction vehicles during an earthwork operation. This paper 1) discusses the importance of an information interface for construction vehicles in order to increase productivity during an earthwork operation, 2) analyses the types of attributes that need to be communicated between construction vehicles, and 3) provides a database that has been built for attribute control. The database built for the information interface between construction vehicles will enhance communication between vehicle operators. Table I shows the typical attributes that should be shared between the excavator operator and the dump truck operator. This information needs to be shared among the operators, as it helps them to plan the earthwork operation in a more efficient manner. A database has been developed to store this information in an entity relation diagram. A user-interface display environment is also developed to provide this information to the operators in the construction vehicles. The proposed interface can help exchange information effectively and facilitate a common understanding during the earthwork operation. For example, the vehicle operators will be aware of the planned volume, excavated volume, transportation time, and transportation numbers. As a part of this study, mobile devices, such as mobile phones and google glasses, will be used as hands-on communication tools.

  • PDF

건설기계 조립 라인 투입 순서를 고려한 제관 공정 생산 스케줄링에 관한 연구 (A Study on the Body Welding Operation Scheduling Considering the Assembly Line's Input Sequence in Construction Equipment Manufacturing)

  • 김기동;최호식
    • 산업기술연구
    • /
    • 제27권A호
    • /
    • pp.69-76
    • /
    • 2007
  • The body of an excavator, one sort of the construction equipment, consists of mainframe part, track frame part, boom part and arm part. The all parts are manufactured in the body welding operation. The scheduling in the body welding operation of a construction equipment manufacturing is to take all the various constraints into consideration. The offset time, due date, daily capacity of operations, daily jig's capacity, precedence relation, outsourcing, alternative resource and all of the shop floor environment should be considered. An APS(Advanced Planning & Scheduling) system is a proper and efficient system in such circumstance. In this paper, we present an APS system, the optimal scheduling system for the construction equipment manufacturing specifically for the body welding operation, using ILOG Solver/Scheduler. ILOG Solver/Scheduler is a general purposed commercial software which supports to find a feasible or optimal solution using object oriented technique and constraints satisfaction programming, given constraints and objectives.

  • PDF

고속철도 횡단 강거더 설치공사에서의 BIM 기반 가상건설 장비운영 시뮬레이션의 적용 (BIM-Based Virtual Construction Simulation for Steel Girder Installation Crossing the High-Speed Railway)

  • 박준원;이상호;김성훈;원정훈;윤영철
    • 한국안전학회지
    • /
    • 제33권2호
    • /
    • pp.76-85
    • /
    • 2018
  • The interest in the Building Information Modeling (BIM) technology has risen remarkably due to the effects on construction work period reduction, cost reduction, work safety improvement, and other factors. In civil engineering field, BIM applications mainly focus on data modeling and virtual construction. In this study, we present the BIM-based virtual construction and analyze the effects of BIM for the railway facilities so that the conventional approach to the equipment operation plan can be improved in order to prevent safety accidents which can result from unclear information during the operation plan. The BIM-based virtual construction technology is applied to establish the construction plan for the site with constraints, the installation of steel girder needs to be completed, avoiding interference with the existing high-speed railway operation within a given limited time. A virtual construction model consisting of topography, structures, equipments, and avatar was built and more detailed model, including safety guard rails, was then created. Specifications of the construction equipment were input as a database, and the virtual construction model was manipulated in the equipment operation planning. Through the BIM-based virtual construction, including the verification of alternative construction method, 311 million won was saved and the construction period was shortened by 87 days compared to the original plan. In addition, it was shown that the interest and participation of the construction workers can be increased by providing the 3D virtual scene for real construction work and various safety hazards occurring during equipment operation can be effectively removed in advance by the interactive worker education.

Significant Progress in Construction Equipment of Super High-Rise Building

  • Zhang, Kun;Wang, Hui;Wang, Kaiqiang;Cui, Jian;Chen, Bo;Li, Di
    • 국제초고층학회논문집
    • /
    • 제7권3호
    • /
    • pp.243-253
    • /
    • 2018
  • The construction of rapid developing super high-rise buildings constantly faces great challenges and the innovation of construction equipment is a focus of these challenges. In this paper, three new inventions including the operation platform, tower crane and hoist are put forward around two of the most important issues of super high-rise building construction: vertical transportation and operation environment. Study background, composition of the equipment, working principles and key technologies are introduced in sequence. In the end, the paper summarizes the main problems in the further development of construction equipment.

친환경 공정계획 수립을 위한 굴착기의 배기가스 계측 데이터 분석 (Analysis of Exhaust Gas Measurement Data in Excavators for Environment-friendly Construction Operation Planning)

  • 고지은;이진우;채윤병;한승우
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2018년도 추계 학술논문 발표대회
    • /
    • pp.100-101
    • /
    • 2018
  • Environmental problems caused by air pollution have been considered as serious critical issues in global perspectives. Controlling greenhouse gases has become one of the major environmental problems in construction fields as well. However, similar studies were mainly focused on suggestion of various methodologies for measuring CO2 emissions of construction equipment and calculating emissions. This study aims to analyze the correlation between the CO2 emissions and RPMs of equipment by the construction process based on row data collected from construction equipment actually operated in job sites. This study allows site personnels to determine the amount of emitted CO2 under particular construction equipment under specific conditions during the targeted construction operations. The research findings expect to be used as fundamental informations for establishing environment-friendly construction operation planning.

  • PDF

효율적인 토공작업을 위한 건설장비 운영시스템 개발 (Development of an Equipment Operating System for Effective Earthwork Operations)

  • 안서현;김성근;임소영
    • 대한토목학회논문집
    • /
    • 제37권1호
    • /
    • pp.153-166
    • /
    • 2017
  • 최근 건설공사는 개선된 건설장비의 투입과 기계화 시공에 적합한 시공법을 적용하여 경제적인 시공을 추구하고 있다. 하지만 많은 경우에 공사관리자의 직관과 전통적인 방식으로 건설장비를 운영함으로써 생산성 및 경제적 측면에서 효과를 증대시키지 못하고 있는 실정이다. 최근의 각종 건설장비의 성능은 급속도로 발전되고 있지만 기계화 시공을 위한 관리방법 및 운영방법이 뒷받침되지 않는다면 기계화 시공으로 인한 효과를 최대한으로 누리지 못하게 된다. 전문가 설문에 따르면 전통적인 건설장비 운영방법의 문제점은 공종에 적합하지 못한 건설장비의 투입과, 실시간 작업상황을 반영하지 못하는 건설장비의 조합, 건설장비 운전자의 숙련도 저하와, 필요한 작업정보의 실시간 이용불가로 나타났다. 본 연구에서는 이러한 문제점을 해결하기 위한 건설장비 운영시스템을 제안하고자 한다. 건설장비 운영시스템은 현장상황을 고려하여 필요할 때마다 건설장비 할당계획을 수립하고 이러한 정보를 실시간으로 건설장비 운전자에게 전달함에 따라 건설장비군의 작업시간율을 최대화할 수 있도록 하는 방법을 제공한다. 궁극적으로 건설장비 운영시스템의 현장적용을 통하여 작업생산성 향상과 연료사용량을 감소함으로써 탄소배출도 저감할 수 있을 것이다.