Browse > Article
http://dx.doi.org/10.21022/IJHRB.2018.7.3.243

Significant Progress in Construction Equipment of Super High-Rise Building  

Zhang, Kun (China Construction Third Engineering Bureau Group Co., Ltd)
Wang, Hui (China Construction Third Engineering Bureau Group Co., Ltd)
Wang, Kaiqiang (China Construction Third Engineering Bureau Group Co., Ltd)
Cui, Jian (China Construction Third Engineering Bureau Group Co., Ltd)
Chen, Bo (China Construction Third Engineering Bureau Group Co., Ltd)
Li, Di (China Construction Third Engineering Bureau Group Co., Ltd)
Publication Information
International Journal of High-Rise Buildings / v.7, no.3, 2018 , pp. 243-253 More about this Journal
Abstract
The construction of rapid developing super high-rise buildings constantly faces great challenges and the innovation of construction equipment is a focus of these challenges. In this paper, three new inventions including the operation platform, tower crane and hoist are put forward around two of the most important issues of super high-rise building construction: vertical transportation and operation environment. Study background, composition of the equipment, working principles and key technologies are introduced in sequence. In the end, the paper summarizes the main problems in the further development of construction equipment.
Keywords
Super high-rise building; Construction equipment; Vertical transportation; Integrated platform;
Citations & Related Records
연도 인용수 순위
  • Reference
1 Ba, X., Li, X., Chen, B., et al. (2017). "Rotating driving system key technology of auto-lifting & rotating multicranes platform used for high-rise building construction." Construction Technology, 46(13), 10-13. (in Chinese)
2 Li, X., Chen, B., Xia, J. S., et al. (2017). "Manufacturing and installation of the auto-lifting & rotating platform with cranes group." Construction Technology, 46(13), 18-22. (in Chinese)
3 Pang, C. L., Quan, W. B., Zhang, W. S., Wang, G. F., and Chen, S. M. (2017). "Technical of the equipment integrated platform of high-rise building." Construction Technology, 46 (16), 1-4. (in Chinese)
4 Wang, H., Huang, G., Wang, K. Q., et al. (2017). "The integrated design of tower crane and integration platform." Construction Technology, 46(13), 23-26. (in Chinese)
5 Wang, K., Q., Chen, B., Li, D., et al. (2013). "Design of variable micro bump support covered intelligent control jacking formwork." Construction Technology, 42(19), 6-11. (in Chinese)
6 Wang, K., Q., Guo, Y., J., Wu, Y., X., et al. (2012). "Design and research of assembled spatial steel truss platform of modularized low-position jacking formwork system." Construction Technology, 41(15), 1-6. (in Chinese)
7 Wang, H., Ren, Z. P., Chen, B., et al. (2017). "Application of the auto-lifting & rotating platform with cranes group in Chengdu Greenland Tower." Construction Technology, 46 (13), 14-17. (in Chinese)
8 Zhang, K., Wang, H., Chen, B., et al. (2017). "Design of the auto-lifting & rotating platform with cranes group." Construction Technology, 46(13), 1-4. (in Chinese)