References
- Ba, X., Li, X., Chen, B., et al. (2017). "Rotating driving system key technology of auto-lifting & rotating multicranes platform used for high-rise building construction." Construction Technology, 46(13), 10-13. (in Chinese)
- Li, X., Chen, B., Xia, J. S., et al. (2017). "Manufacturing and installation of the auto-lifting & rotating platform with cranes group." Construction Technology, 46(13), 18-22. (in Chinese)
- Pang, C. L., Quan, W. B., Zhang, W. S., Wang, G. F., and Chen, S. M. (2017). "Technical of the equipment integrated platform of high-rise building." Construction Technology, 46 (16), 1-4. (in Chinese)
- Wang, H., Huang, G., Wang, K. Q., et al. (2017). "The integrated design of tower crane and integration platform." Construction Technology, 46(13), 23-26. (in Chinese)
- Wang, K., Q., Chen, B., Li, D., et al. (2013). "Design of variable micro bump support covered intelligent control jacking formwork." Construction Technology, 42(19), 6-11. (in Chinese)
- Wang, K., Q., Guo, Y., J., Wu, Y., X., et al. (2012). "Design and research of assembled spatial steel truss platform of modularized low-position jacking formwork system." Construction Technology, 41(15), 1-6. (in Chinese)
- Wang, H., Ren, Z. P., Chen, B., et al. (2017). "Application of the auto-lifting & rotating platform with cranes group in Chengdu Greenland Tower." Construction Technology, 46 (13), 14-17. (in Chinese)
- Zhang, K., Wang, H., Chen, B., et al. (2017). "Design of the auto-lifting & rotating platform with cranes group." Construction Technology, 46(13), 1-4. (in Chinese)