• Title/Summary/Keyword: construction design

Search Result 11,717, Processing Time 0.036 seconds

Integrated Architectural Engineering Design Process Using BIM Tools (BIM 도구 활용을 통한 건축공학설계의 프로세스)

  • Kang, Da-Young;Shin, Kyoo-Chul
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2010.05a
    • /
    • pp.175-178
    • /
    • 2010
  • Public institutions and owners have been introduced to use Building Information Modeling (BIM) tools. Learning BIM becomes an important factor in design process of undergrad program. The purpose of this study is to demonstrate an integrated architectural engineering design process using BIM tools. BIM education programs are analyzed to compare the level of detail in BIM education. An architectural engineering design class needs to involve BIM to introduce integrated process. An architectural engineering design process needs be based on understanding design, building structure, construction and building services. 3D Modeling helps understanding a building structure and checking environment-friendly element analysis. As a result of this research, new process of design education is proposed under four issues.

  • PDF

A Study on the Improvement of Railway Design Standard (철도부분 설계도서 작성기준의 개선방안에 관한 연구)

  • 이태식;곽동구
    • Proceedings of the KSR Conference
    • /
    • 1999.05a
    • /
    • pp.52-59
    • /
    • 1999
  • As the Korea construction market has recent3y opened, the needs to restructure the design standard for the technical advancement in design is increasing. Therefore, we proposed the design standard of railway according to the direction, which is presented in this study that analyze the present situation of the previous design standard. The new design standard of railway was tried to definite a limit in each service stage. This design standard will improve the design quality and induce the accumulation of technology. In addition, it will solve the organic contradiction of construction service. As a result, this research will bring the improvement in the design standard and contribute to the development of Korea construction industry.

  • PDF

The inspection and seismic design method of electrical facility instated in the building (건축물에 시설되는 수변전설비 내진설계 및 검사 방법에 관한 연구)

  • Kim, Gi-Hyun;Lee, Sang-Ick;Kang, Min-Hee;Bae, Suk-Myong
    • Proceedings of the Korean Institute of IIIuminating and Electrical Installation Engineers Conference
    • /
    • 2009.05a
    • /
    • pp.332-335
    • /
    • 2009
  • Incase of not considered seismic design at transformer vault which is made of many informant electrical facility, facility is damaged, electrical fire breaks out and second damage is able to break out at generating earthquake. But seismic design yet is not applied to at transformer vault in the country. Regard to seismic design method of electrical facility installed in the building internal, we present the seismic design of electrical facility using "Building construction design standard" in internal and "Manual of seismic design and construction for Building Electrical facility" in japan. This paper will be used detail seismic design of pipe and facility. reliability inspection plan for seismic design and construction of electrical facility

  • PDF

SUSTAINABLE AND ENVIRONMENTALLY RESPONSIBLE DESIGN USING BIM: A CASE STUDY OF A RESIDENTIAL PROJECT

  • Hyunjoo Kim;Kwok K. Tam
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.84-87
    • /
    • 2011
  • This paper describes the application of the three sustainable design elements for a residential project in the county of Los Angeles, USA. The first design element is the green building design in which a base model will be created using the Autodesk REVIT MEP program for the analysis by Building Information Modeling (BIM) for the energy analysis modeling process to determine the energy savings for each of the recommended design features. The second element is the Low Impact Development design for the site design using specialty material and structural devices for infiltration and recycling of storm water for reuse. The third element is the application of drought tolerant plant species in the site's landscaping design as a means to conserve water. The construction cost associated with the application of these three elements will be reviewed to determine the practicality and effectiveness of this sustainable design approach.

  • PDF

A Study for the Optimal Expression Level Definition of BIM Model in Construction Phase (시공단계 BIM모델의 적정표현수준 정의를 위한 기초 연구)

  • Noh, Hae-ra;Kim, Ji-yun;Lee, Da-un;Yun, Seok-heon
    • Korean Journal of Computational Design and Engineering
    • /
    • v.21 no.4
    • /
    • pp.378-388
    • /
    • 2016
  • As the needs for the mega-sized, high-rise and irregular shape of building increase, domestic application of BIM in construction industry is increasing in recent years. In this circumstance, interests in BIM modeling and modeling detail level have been also increased. BIM that is based on a three-dimensions, requires a specific and precise building expressions. And model expression level required for each phase such as design, construction, and maintenance of the construction project could be different as its needs. Because that it is not clear to define the criteria for the expression level of construction BIM model, It is difficult to decide how detail and what to model is appropriate in the practical application of BIM model. It could be the reason why the productivity in construction project became lower and lower. In this study we consider the way how to improve the productivity of BIM and analyze the appropriate representation level of construction BIM model through the experts' survey. The results of study could suggest the basis for an appropriate expression level of construction BIM model.

Application of Digital Mock-Up Technology for Detail Design and Construction of Bridge (교량 상세 설계 및 시공을 위한 DMU 기술 적응 방안 연구)

  • Lee, Yoon-Bum;Kim, Min-Seok;Lee, Kwang-Myong;Shin, Hyun-Yang;Park, Kyoung-Lae
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2007.04a
    • /
    • pp.277-282
    • /
    • 2007
  • In recent years, dramatic advances in information technology have motivated the construction industry to improve its productivity. Most construction companies are trying to utilize some new information technologies for enhancing the structure quality, shortening construction time, and reducing the construction cost. Digital Mock-Up (DMU) technology utilizes 3D CAD/CAM system that shows the shape of a structure on the computer screen. By modeling and assembling the structure in 3D dimensional environments, some errors in design can be found before or during construction. In this paper, DMU technology was applied to the detail design and construction of In-Cheon Bridge and its effectiveness was evaluated. All components of a PSC box girder segment were modeled and assembled by using of 3D CAD tools and then, some interferences between components and errors were found and revised appropriately before construction. Consequently, DMU technology would improve the quality of the structure and reduce time and cost for construction.

  • PDF

WHEN CM AT RISK MEETS VIRTUAL DESIGN AND CONSTRUCTION (VDC) IN CONSTRUCTION PHASE: CASE STUDY OF PRACTICIES IN U.S.

  • Joo-Sung, Lee;Sung-Kon, Moon;Ju-Hyung, Kim;Jae-Jun, Kim
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.566-572
    • /
    • 2009
  • Turn-key and CMF(CM for Fee) have been selected as procurement paths of large public projects in Korea. However, recently, researches and discussions on CMR(CM at Risk) have been popular as the Korean government seeks for alternative procurement paths to enhance the performance. In the CMR projects, the part who is responsible for construction management should predict and control the potential risks for guaranteeing benefits. In this paper, CMR projects in which a general contractor plays the role as CMr is mainly analyzed. We give attentions to risk management during construction process given that subcontractors, main parts in this phase, work in various ways and thus more chances for faults exist. In this case, for the general contractor, to recognize potential risks in previous to start construction works of subcontractor by means of virtual design and construction (VDC) must be essential to this end. The case study of practices on VDC in U.S in which CMR has been introduced can provide considerable aspects to implement it in Korea.

  • PDF

Leveraging Reinforcement Learning for Generating Construction Workers' Moving Path: Opportunities and Challenges

  • Kim, Minguk;Kim, Tae Wan
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.1085-1092
    • /
    • 2022
  • Travel distance is a parameter mainly used in the objective function of Construction Site Layout Planning (CSLP) automation models. To obtain travel distance, common approaches, such as linear distance, shortest-distance algorithm, visibility graph, and access road path, concentrate only on identifying the shortest path. However, humans do not necessarily follow one shortest path but can choose a safer and more comfortable path according to their situation within a reasonable range. Thus, paths generated by these approaches may be different from the actual paths of the workers, which may cause a decrease in the reliability of the optimized construction site layout. To solve this problem, this paper adopts reinforcement learning (RL) inspired by various concepts of cognitive science and behavioral psychology to generate a realistic path that mimics the decision-making and behavioral processes of wayfinding of workers on the construction site. To do so, in this paper, the collection of human wayfinding tendencies and the characteristics of the walking environment of construction sites are investigated and the importance of taking these into account in simulating the actual path of workers is emphasized. Furthermore, a simulation developed by mapping the identified tendencies to the reward design shows that the RL agent behaves like a real construction worker. Based on the research findings, some opportunities and challenges were proposed. This study contributes to simulating the potential path of workers based on deep RL, which can be utilized to calculate the travel distance of CSLP automation models, contributing to providing more reliable solutions.

  • PDF

Development and Application of Tunnel Design Automation Technology Using 3D Spatial Information : BIM-Based Design for Namhae Seomyeon - Yeosu Shindeok National Highway Construction (3D 공간정보를 활용한 터널 설계 자동화 기술 개발 및 적용 사례 : 남해 서면-여수 신덕 국도 건설공사 BIM기반 설계를 중심으로)

  • Eunji Jo;Woojin Kim;Kwangyeom Kim;Jaeho Jung;Sanghyuk Bang
    • Tunnel and Underground Space
    • /
    • v.33 no.4
    • /
    • pp.209-227
    • /
    • 2023
  • The government continues to announce measures to revitalize smart construction technology based on BIM for productivity innovation in the construction industry. In the design phase, the goal is design automation and optimization by converging BIM Data and other advanced technologies. Accordingly, in the basic design of the Namhae Seomyeon-Yeosu Sindeok National Road Construction Project, a domestic undersea tunnel project, BIM-based design was carried out by developing tunnel design automation technology using 3D spatial information according to the tunnel design process. In order to derive the optimal alignment, more than 10,000 alignment cases were generated in 36hr using the generative design technique and a quantitative evaluation of the objective functions defined by the designer was performed. AI-based ground classification and 3D Geo Model were established to evaluate the economic feasibility and stability of the optimal alignment. AI-based ground classification has improved its precision by performing about 30 types of ground classification per borehole, and in the case of the 3D Geo Model, its utilization can be expected in that it can accumulate ground data added during construction. In the case of 3D blasting design, the optimal charge weight was derived in 5 minutes by reviewing all security objects on the project range on Dynamo, and the design result was visualized in 3D space for intuitive and convenient construction management so that it could be used directly during construction.

Drive Performance Analysis of Climbing Hydraulic Robots System for Construction Automation (시공자동화를 위한 크라이밍 유압시스템의 구동성능 분석)

  • Kang, Go-Une;Lee, Myung-Do;Lee, Kyu-Won;Cho, Hun-Hee;Kang, Kyung-In
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2010.05a
    • /
    • pp.33-36
    • /
    • 2010
  • The attention in construction Automation is getting higher since it could be the answer to the lack of skilled labor by decrease in construction population and aging which adversely affects productivity and quality in the construction site. We are on the way to develop a construction automation system adequate for domestic circumstances in Korea; it is called RCA(Robotic-crane based Construction Automation)system. Climbing hydraulic robots system is a part of RCA system and makes Construction factory(CF) climb through the guide rail on the core wall. The safety of climbing hydraulic robots system is at issue due to the overloaded weight of CF. Preventing this issue, present study did the design verification through the structural analysis and the simulation. Mock-up test also was done to analyze the drive performance of climbing hydraulic robots system.

  • PDF