• Title/Summary/Keyword: construction demolition

Search Result 240, Processing Time 0.028 seconds

A Study on the Characteristics of Construction Wastes Generated from Demolition of Buildings in the Housing Environment Amelioration District

  • Son, Byeung-Hun;Hong, Won-Hwa
    • Architectural research
    • /
    • v.15 no.1
    • /
    • pp.25-33
    • /
    • 2013
  • The amount of construction waste increased to 176,447 ton/day in 2008 from 28,400 ton/day in 2000, a 6-fold increase in just 10 years. Such dramatic increase in the waste of concrete, asphalt concrete, wood and metals was due to demolition of old buildings as well as a great number of building redevelopment projects and hurried city industrialization. Many buildings targeted for demolition today were built in line with the government policy to provide affordable housing to citizens in the shortest time possible and consequently, said buildings underwent rapid deterioration and required periodic repairs and reconstruction. Based on the above, we predict that construction waste will continue to increase for the foreseeable future. In particular, due to limited availability of suitable space to construct apartments and residential buildings in the city, old buildings are being torn down to make space for new development, further increasing construction waste. In light of that, efforts to recycle as well as reduce generated waste are urgently required.

A Study on the Method Applying Construction Wastes of Construction in Korea (국내 건설 폐기물 활용 현황 및 활성화에 관한 연구)

  • Jang, Jae-Moung;Choi, Hee-Bok;Kang, Kyung-In
    • Journal of the Korea Institute of Building Construction
    • /
    • v.3 no.1
    • /
    • pp.147-154
    • /
    • 2003
  • Recently, the amount of the construction and demolition wastes has rapidly increased due to increasing construction projects. In the past, most of the construction and demolition wastes were buried in the ground of thrown away. Illegally, without any treatment, so various harmful environmental pollution problems were occurred. In this study, the domestic data on the amount of the construction and demolition wastes and the disposal methods were collection and analysed. Specially, the recycling and management systems of the construction and asphalt concrete wastes were studied. A new technology and necessary policy for recycling were suggested. In general, the industrial wastes were produced in the particular place, and the amount and the characteristics of the wastes able to be estimated by the studies on the treatment technology. And the investment of the facilities for the industrial wastes have been made continuously. But little attention has been relatively given to the treatment technology. And system for the construction and demolition wastes for the political support and facilitation on the proper treatment and the recycling, the necessary of information exchange system and the manifest system for treatment of waste on commission were recommended, and also devised methods to develope and support the recycling industry. In the future, the subject of study is going to carry out analysis of economic and market in making products.

Analysis of Basic Capabilities for Building Demolition Experts - Focused on Domestic and International Cases (건축물 해체공사 전문인력을 위한 기본역량 분석 - 국내·외 사례를 중심으로)

  • Lee, Kyung-Koo;Shin, Yong-Seob;Lee, Hyung-Yong;Chun, Jae-Youl
    • Journal of the Korea Institute of Building Construction
    • /
    • v.23 no.6
    • /
    • pp.841-849
    • /
    • 2023
  • The rising number of accidents during building demolition work has significantly heightened interest in this field. This study undertakes a comprehensive analysis of the essential capabilities required for building demolition experts, drawing on both domestic and international examples. This includes an examination of training courses for building demolition inspectors and the competencies mandated for structural demolition roles as per Korea's National Competency Standards(NCS). Furthermore, the study reviews the qualification tests and training programs for building demolition professionals in the United States, Japan, and England. The research concludes that the expertise needed for demolition construction professionals should be categorized into seven key domains: legal, structural, safety, planning, operational, constructional, and environmental aspects. These competencies are further divided across three professional tiers: technician, engineer, and manager.

Integration of Temporary Fences for Demolition and Construction (해체${\cdot}$신축용 가설울타리의 통합방안)

  • Sin Dong-Sung;Jeon Jae-Man;Koo Kyo-Jin;Hyun Chang-Taek
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.258-261
    • /
    • 2003
  • Demolition is mort dangerous than construction and causes a lot of harmful environmental factors. But temporary fences used on demolition sites cannot play out their roles of blocking harmful environmental factors or securing stability and work space. They only block the view from the outside. This study begins with the possibility that the temporary fence can be installed prior to demolition. As a preceding step. we performed research on the actual conditions of using it. We then realized that it can be installed according to our research plan. First, we focused on actualizing the integration of temporary fences for demolition and construction. Here are the results of this study. First, we need to grasp the limiting factors of integration. Second, we ought to revise the Korean Architecture Standard Specification. Third, we should prepare against damage and transformation of fences. Finally, we can expect to reduce harmful environmental factors, cut down expenses, improve the working environment and raise the image of demolition by the integration of these fences.

  • PDF

An Investigation on the Propriety of Ratio-Unit Price Method for Estimating Demolition Cost (해체 공사 원가분석을 통한 비율단가 적용방식의 적정성 검토)

  • Sung Nak-won;Kim Young-suk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.579-583
    • /
    • 2004
  • A new and extendable highway should be planned and budgeted by estimating the total construction cost on the basis of the precise cost data. However, the demolition or disjointing cost could not reflect construction site condition sufficiently because it was simply estimated by multiplying the highway structure installation cost by the regular ratio($10\~70\%$) specified in the Korea Standard Estimate. The regular ratio for estimating of demolition and disjointing cost was calculated by not actual construction cost data but subjective experiences of field manager. Therefore, the reliance of the estimated demolition or disjointing cost has been declined. The primary objective of this study is to purpose the standard for estimating proper demolition or disjointing cost of relevant items through various site analysis and survey, and to investigate on the propriety of ratio-unit price method for estimating demolition and disjointing cost.

  • PDF

Estimation of the Waste Generation in Building Demolition Work using Drone (드론-BIM 기반 건축물 해체공사의 폐기물 발생량 평가)

  • Ryu, Jung Rim;Park, Won-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.05a
    • /
    • pp.309-310
    • /
    • 2021
  • In order to respond to environmental problems and to efficiently recycle resources, it is important to evaluate the amount of construction waste generated. In particular, the estimation of the amount of waste generated in the demolition work was performed based on the basic unit of waste generated per floor area. This study proposes a method using drones as a method for evaluating the amount of demolition waste in a wide area. In the simulated application, the field measurement results and the proposed method were compared, and the effectiveness of the building volume calculation using drones was confirmed. It was confirmed that the building volume can be calculated quickly in the additional pilot application.

  • PDF

A Comparative Analysis of Risk Assessment Models for Asbestos Demolition (석면 해체 작업의 위험성평가모델 비교 분석)

  • Kim, Dong-Gyu;Kim, Min-Seung;Lee, Su-Min;Kim, Yu-Jin;Han, Seung-Woo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2022.11a
    • /
    • pp.99-100
    • /
    • 2022
  • As the danger of exposure to the asbestos has been revealed, the importance of demolition asbestos in existing buildings has been raised. Extensive body of study has been conducted to evaluate the risk of demolition asbestos, but there were confined types of variables caused by not reflecting categorical information and limitations in collecting quantitative information. Thus, this study aims to derive a model that predicts the risk in workplace of demolition asbestos by collecting categorical and continuous variables. For this purpose, categorical and continuous variables were collected from asbestos demolition reports, and the risk assessment score was set as the dependent variable. In this study, the influence of each variable was identified using logistic regression, and the risk prediction model methodologies were compared through decision tree regression and artificial neural network. As a result, a conditional risk prediction model was derived to evaluate the risk of demolition asbestos, and this model is expected to be used to ensure the safety of asbestos demolition workers.

  • PDF

A Study for Felling Impact Vibration Prediction from Blasting Demolition (발파해체시 낙하충격진동 예측에 관한 연구)

  • 임대규;임영기
    • Explosives and Blasting
    • /
    • v.22 no.3
    • /
    • pp.43-55
    • /
    • 2004
  • Use term of tower style construction exceeds recently. Accordingly, according to construction safety diagnosis result, achieve removal or Improvement construction. But when work removal, must shorten shut down time. Therefore, removal method of construction to use blasting demolition of construction is very profitable. Influence construction and equipment by blasting vibration and occurrence vibration caused by felling impact. Is using disadvantageous machine removal method of construction by and economic performance by effect of such vibartion. Therefore, this research studied techniques to forecast vibartion level happened at blasting demolition and vibration reduction techniques by use a scaled model test.

Economic Evaluation of Eco-friendly Demolition Work and Case study in Remodeling Project (친환경 리모델링 철거공사의 경제성 평가 및 사례적용)

  • Kim, Yoon-Duk;Kim, Ki-Hyun;Cha, Hee-Sung;Kim, Kyung-Rai;Shin, Dong-Woo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.2
    • /
    • pp.45-53
    • /
    • 2010
  • When increasing quantity of construction wastes, how to deal with construction wastes and environmental problems relating to disposal of construction wastes are discussed as social issues, treatment of construction waste and subsidiary issues are raised as important problems. The demolition work produce construction wastes most in construction industry. Various researches on eco-friendly treatment of construction wastes, recycling rates and recycled materials were conducted aspect of sustainability in developed countries, however, domestic remodeling projects were performed demolition work with first-demolition and second-classification method which emphasize productivity focused on efficiency. It caused not only environmental problems, but also economical problems such as increasing disposal cost of construction wastes. Solving these problems, the previous study, suggested the process model of eco-friendly demolition work to recycle materials. This paper applied eco-friendly remodeling process to practical projects and economic feasibility on eco-friendly remodeling process. Moreover these results expect to contribute the revitalization of eco-friendly demolition work in remodeling projects.

A Process Model of Eco-friendly Demolition Work for Wall Type Aged Housing Remodeling (친환경 리모델링 철거공사 프로세스 모델 (벽식구조 노후 공동주택을 대상으로))

  • Hwang, Young-Gyu;Kim, Ki-Hyun;Kim, Kyung-Ra;Han, Ju-Yeoun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.6
    • /
    • pp.204-215
    • /
    • 2008
  • Demolition work is a precedence activity that is performed earlier than other remodeling activities. And demolition work is one of the critical path activities. So, demolition work is needed for systematic plan and management. However, contractors of the remodeling project established a rough plan and did not consider recycling wastes, safety of workers and structural stable of building. To improve this problem, a eco-friend process model of remodeling project is needed to be established. The process model is composed of five phases; 1) survey and analysis of general condition of demolition work, 2) prepare documents of demolition work 3) establishing demolition work plan, 4) demolition and inspection, 5) post-demolition management. Especially, demolition documents are based on establishing WBS, selecting the equipment and method, waste management and structure reinforcement. A process model of eco-friend demolition work is developed by using IDEF0 method.