• 제목/요약/키워드: construction case

검색결과 6,337건 처리시간 0.031초

철골공사 현장조사를 통한 설계프로세스 개선방안 (The Improvement Plan of Design Process by Case Study of Steel Structural Work)

  • 방성원;오승준;김진호;임남기
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2003년도 학술.기술논문발표회
    • /
    • pp.121-126
    • /
    • 2003
  • Steel frame construction is divided into subsidiary materials with column, beam, girder and bracing. After these are processed in factory for using installing in construction field. These prefabricated furniture is very important in accordance with design drawing about processing and prefabricating. In the case of design process using information transmission in blueprint, omission of material number, processing measure and finishing material, or discordance of each structure drawing and selecting incongruent structural material generated an error in the process of design. These error caused delaying tine and increasing cost and increasing safety accident in the steel-structure work operating process. therefore, design process should consider problem of operating process.

  • PDF

낙동강 하구 화전지구 연약지반에 작용하는 피압수압 측정사례 (A Design Case Study Considering the Artesian Pressure in Hwa Jean Site of Nakdong Delta Area)

  • 김태형;유재명;이명재;배기현;정두석
    • 기술발표회
    • /
    • 통권2006호
    • /
    • pp.311-319
    • /
    • 2006
  • Artesian Pressure exists in Hwa Jeon Project Site of Nakdong Delta Area. Maxium value of the pressure ranges between 06 tonf/m2 and 1 3 tonf/m2 in the design site. This paper presents a design case study considering the Artesian Pressure to calculate the consolidation settlement of the deep marine clay.

  • PDF

건설공사 유지보수품셈 사례조사 연구 (Case Study on the Construction Standard Production Rate for Operation and Maintenance Technology)

  • 안방율;박태일
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2019년도 춘계 학술논문 발표대회
    • /
    • pp.250-251
    • /
    • 2019
  • Lots of infrastructures have been newly constructed through the rapid economic growth of 1970's. Since the infrastructures has mostly deteriorated and this circumstance makes the need for maintenance and rehabilitation(M&R) of infrastructures to obtain the convenience and safety of users even more essential. Although markets for M&R project become larger, the construction standards for cost estimation of M&R work are insufficient. Thus, the purpose of this study is to examine the present state of standards for cost estimation of M&R works using case studies. Finally, this work could be utilized as the basis for the development of national standard for estimation of M&R work.

  • PDF

개량 강관네일링 공법을 이용한 사면 보강사례 연구 (A Case Study on the Slope Reinforcement by Improved Steel Pipe Nailing)

  • 최동남;임희대;송영수;이규환
    • 한국안전학회지
    • /
    • 제22권1호
    • /
    • pp.54-60
    • /
    • 2007
  • This paper describes typical design and construction practice for in-situ ground reinforcement technique using improved steel pipe pressure grouting. A case history is presented to illustrate the benefit gained by application of the technique. This technique was applied to cut slopes developed in the construction of auxiliary spillway of 00 dam. Applicable conditions, method of survey, slope stability analysis and construction are given in this parer. As for the construction method, a procedure is given and the main points are the control of construction work. As a result of the pull-out test, it is shown that seel pipe nailing is particularly useful for stabilizing rock slope.

현장조사를 통한 철골공사 설계프로세스 개선방안 (The Improvement Plan of Design Process by Case Study of Steel Structural Work)

  • 방성원;김진호;임남기
    • 한국건축시공학회지
    • /
    • 제3권2호
    • /
    • pp.111-118
    • /
    • 2003
  • Steel frame construction is divided into subsidiary materials with column, beam, girder and bracing. After these are processed in factory for using installing in construction field. These prefabricated furniture is very important in accordance with design drawing about processing and prefabricating. In the case of design process using information transmission in blueprint, omission of material number, processing measure and finishing material, or discordance of each structure drawing and selecting incongruent structural material generated an error in the process of design. These error caused delaying time and increasing cost and increasing safety accident in the steel-structure work operating process. therefore, design process should consider problem of operating process.

CONSTRUCTABILITY REVIEWS: A STRATEGIC PROCESS IN DESIGN DEVELOPMENT

  • Patrick T.I. Lam;Franky W.H. Wong
    • 국제학술발표논문집
    • /
    • The 2th International Conference on Construction Engineering and Project Management
    • /
    • pp.1-8
    • /
    • 2007
  • Construction designs are often produced with insufficient considerations on the constructability aspects. Poor constructability has resulted in delay, cost increase, disputes, safety hazards and inconvenience to the public. Increasingly, there has been a call for more systematic input of construction knowledge in the planning and design processes of modern day's infrastructure development. In some countries, notably the US, the practice of constructability reviews is on the rise, with concomitant benefits. It is advocated that construction plans and designs be subject to constructability reviews as early as possible. It should be made part of the project management strategy driven by the client. This paper outlines the constructability review process and benefits, whilst drawing lessons from a number of case studies.

  • PDF

지하층 합벽 무지주 시스템 거푸집의 적용성에 관한 연구 (A Study on the Applicability of Non-Supporting System Forms for Single Face Walls in Underground Construction)

  • 김재엽;안성훈;손영진
    • KIEAE Journal
    • /
    • 제8권2호
    • /
    • pp.87-92
    • /
    • 2008
  • Underground building constructions are recently more important because the ratio of underground area is increasing in the huge and high-rise building construction projects. For reducing the total building construction periods, it is required to reduce not only the over-ground structural work periods but also the underground structural work periods. Therefore, this study is proposed the non-supporting system forms for single face walls in underground building construction by one of the methods for reducing the underground structural work periods and investigated the applicability of the non-supporting system forms by analyzing the case-study in civil construction project. In regard of construction duration, the results of analyzing the case-study showed that the non-supporting system forms are better than the euro forms with soldier system for single face walls in underground building construction. In addition, it is showed that the cost of these two forms is similar and usage the working space and safety in non-supporting system forms are better that those of the euro forms with soldier system, too.

지하공사 사례를 기반으로 한 터파기 공법 선정프로세스 분석 (Case Analyses of the Selection Process of an Excavation Method)

  • 박상현;이강;최명석;강현정;임홍철
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2007년도 춘계학술논문 발표대회
    • /
    • pp.101-104
    • /
    • 2007
  • As the proportion of underground construction increases, the impact of inappropriate selection of a underground construction method for a construction size increases. The purpose of this study is to develop an objective way of selecting an excavation method. There have been several attempts to achieve the same goal using various data mining methods such as the artificial neural network, the support vector machine, and the case-based reasoning. However, they focused only on the selection of a retaining wall construction method out of six types of retaining walls. When we categorized an underground construction work into four groups and added more number of independent variables (i.e., more number of construction methods), the predictability decreased. As an alternative, we developed a decision tree by analyzing 25 earthwork cases with detailed information. We implemented the developed decision tree as a computer-supported program called Dr. underground and are still in the process of validating and revising the decision tree. This study is still in a preliminary stage and will be improved by collecting and analyzing more cases.

  • PDF

Understanding Technology-Enhanced Construction Project Delivery: perspective from expansive learning and adaptive expertise

  • Sackey, Enoch;Kwadzo, Dzifa A.M.
    • Journal of Construction Engineering and Project Management
    • /
    • 제7권3호
    • /
    • pp.26-38
    • /
    • 2017
  • The architecture, engineering, and construction (AEC) industry is yet to formulate a holistic strategy to realign the evolving technological infrastructures with organisational ambitions and adaptive knowledge of the workforce. This study attempts to create an understanding of the underlying processes adopted by technology-enhanced construction organisations to disseminate and maintain knowledge within the workforce in order to keep pace with the evolving construction technologies. The study adopted expansive learning and adaptive expertise constructs to help better explain workplace learning support structures for organisational effectiveness in a turbulent situation. The two theories were tailored to empirically evaluate three case study construction organisations that have embarked on technology-enabled organisational changes. The study concluded on the creation of a facilitating workplace learning environment to enable the workforce to adapt into and resolve any inherent contradictions and cognitive ambiguities of the changing organisational conditions. This could ensure that novel and conflicting features of the emerging technologies can be adapted across the myriad multi-functional project activities in order to expand the frontiers of the technological capabilities to address the eminent issues confronting the AEC sector.

RFID Technology Applications with PMIS for Managing RMC Truck Operations

  • Kim, Seung-Ho;Kim, Sang-Yong
    • 한국건축시공학회지
    • /
    • 제11권5호
    • /
    • pp.468-481
    • /
    • 2011
  • This research presents a strategy and information system to manage the logistics of delivery ready mixed concrete (RMC) under the integrated environment of PMIS+RFID. PMIS is system tool and technique used in construction sectors to delivery information. Information that can be extracted electronically in real time is more valuable than data gathered and maintained manually. RFID technology can help to improve data accuracy through supply chains and by identifying products and objects at specific points through automatic identification. The objectives of these two implementations can be able to improve the efficiency of logistics management for RMC truck process, and to verify the technical and practical feasibility of PMIS+RFID application in construction industry. This may be realistic given the dynamics of daily activities on construction sites. This research is focused on examples on real world case study, applications and research theme related and connected to PMIS+RFID technology. It demonstrated that PMIS+RFID technology has been automatically implemented and has shown process information about the RMC truck and the overall status information about it, both quickly and accurately. As a result, the construction site where needs 300 $m^3$ pouring (50 RMC trucks) per day can be reduced total 250 minutes. Moreover, this time saving is related to the labour cost saving. From the case studies, RFID+PMIS system was proven in terms of effectiveness rather than current method.