• Title/Summary/Keyword: construction analysis

Search Result 15,939, Processing Time 0.047 seconds

A Study on the Comparison of the Indices of Hazard Analyses for the Construction of Heat Accumulator (축열조 공사의 위험분석지수 비교에 관한 연구)

  • Lee, Sang-Wook;Maeng, In-Young;Yi, Young-Seop
    • Journal of the Korean Society of Safety
    • /
    • v.29 no.5
    • /
    • pp.166-171
    • /
    • 2014
  • This study is conducted to compare three methods of hazard analyses and to propose the control for the accidents arising under construction of heat accumulator of group energy projects(co-generation plants). The analysis of fatal accidents and the Analytic Hierarchical Process(AHP) using by the questionnaire survey for the workers engaged in the construction of heat accumulator and the quantitative questionnaire survey of expert group has been carried out. In order to analyze the fatal accidents, the 115 cases of accidents from 2001 to 2012 published by Korean Occupational Safety and Health Agency(KOSHA) and workers suffered from industrial accidents are collected and analyzed. The AHP is applied and analyzed for 66 persons of the construction site managers, safety engineers and construction engineers and the questionnaire survey of expert group is carried out and analyzed for the 51 persons of contractors and construction inspectors. The analyses of the types of accidents and the jobs of the suffered workers and the hazardous construction processes which are occurred accidents frequently are shown. The results of the analysis of fatal accidents and the AHP as well as the questionnaire of expert group are shown similar results.

Development and application of construction monitoring system for Shanghai Tower

  • Li, Han;Zhang, Qi-Lin;Yang, Bin;Lu, Jia;Hu, Jia
    • Smart Structures and Systems
    • /
    • v.15 no.4
    • /
    • pp.1019-1039
    • /
    • 2015
  • Shanghai Tower is a composite structure building with a height of 632 m. In order to verify the structural properties and behaviors in construction and operation, a structural health monitoring project was conducted by Tongji University. The monitoring system includes sensor system, data acquisition system and a monitoring software system. Focusing on the health monitoring in construction, this paper introduced the monitoring parameters in construction, the data acquisition strategy and an integration structural health monitoring (SHM) software. The integration software - Structural Monitoring/ Analysis/ Evaluation System (SMAE) is designed based on integration and modular design idea, which includes on-line data acquisition, finite elements and dynamic property analysis functions. With the integration and modular design idea, this SHM system can realize the data exchange and results comparison from on-site monitoring and FEM effectively. The analysis of the monitoring data collected during the process of construction shows that the system works stably, realize data acquirement and analysis effectively, and also provides measured basis for understanding the structural state of the construction. Meanwhile, references are provided for the future automates construction monitoring and implementation of high-rise building structures.

A study on the Causes Analysis and Preventive Measures by Disaster types in Construction Fields (건설현장에서의 재해유형별 원인 분석 및 예방대책에 관한 연구)

  • Jo, Jae-Hwan
    • Journal of the Korea Safety Management & Science
    • /
    • v.14 no.1
    • /
    • pp.7-13
    • /
    • 2012
  • Recently, carelessness on safety management in construction sites has caused a sharper upward trend in accidents and disasters, compared to the past. Therefore, this study analyzes the causes of accidents that occurred on construction sites in the year of 2007, and proposes preventive measures. The construction industry had a heavy death rate with 279 out of 418 deaths from falls in all industrial sites, accounting for 66.7%. And the causation analysis found a particularly high incidence of temporary structure-related accidents, with falling off scaffolding as the most common cause of accidents. According to the causation analysis of fall-down accident cases, accidents induced by protrusion on construction sites are a big contributor resulting in the deaths of 312, accounting for 74.8%, which is deemed to be due to site disorderliness. And to remove floor protrusions and to secure workers' traffic line and safety, neat and thorough site arrangement is necessary. Against collision, efforts must be made to prevent equipment-pedestrian crashes on site, which necessarily requires emergency lamps, alarm bells, and safety poles and blocks to be installed, lighting systems to be improved, obstacles to be removed, site supervisors to be assigned to construction equipment works, and workers to be more intensely trained and supervised.

A Study of Field Construction Process Analysis and Economic evaluation of Ready-mixed Shotcrete (레디믹스트 숏크리트의 현장 시공프로세스 분석 및 경제성 평가)

  • Kim, Dong-Min;Ma, Sang-Joon
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2010.09a
    • /
    • pp.1322-1327
    • /
    • 2010
  • Ready-mixed shotcrete mixed with high quality materials and can be controled shotcrete quality is producted in plants and transported to construction fields, so do not need a field batch plant. In this study, the field construction system that can be applied Ready-mixed Shotcrete to construction fields was proposed, and the all-in-one silo that was the key component of the field construction system was design. It was performed to evaluate the constructability that the field construction process analysis in case of applying a field batch plant and the all-in-one silo, the cost analysis of the material production and transport in a road tunnel was also performed to evaluate the economic feasibility of Ready-mixed shotcret.

  • PDF

An Effect Analysis of Lead Time Changes on Investment Evaluation of a Nuclear Power Plant Construction : A Trade-Off Analysis Between a Construction Cost and Lead Time (원자력발전소 건설 리드타임의 변화가 투자프로젝트 평가에 미치는 효과분석: 발전소 건설비용과 리드타임 간의 상쇄효과분석)

  • Kim, Gyu-Tai;Lee, Byung-Gook;Oh, Chi-Jae
    • IE interfaces
    • /
    • v.12 no.3
    • /
    • pp.414-423
    • /
    • 1999
  • A nuclear power plant requires a huge amount of initial investment and long construction lead time. As we expect that there may exist a relationship between investment and construction lead time, a number of researchers have reported that nearly a half of investments is incurred due to time factors such as the time value of money and inflation or escalation rates. Therefore, we investigated in this paper a relationship between the initial investment and the construction lead time of a nuclear power plant construction, and proposed a method for a trade-off analysis between the annual equivalent worth and the investment alternatives to reduce the construction lead time. Finally, we presented a real case to numerically explain the steps of the method presented in this paper.

  • PDF

Development of Selection Criteria for Composite Method Using Half-PC Slab (하프슬래브를 이용한 PC 복합공법의 선정기준 개발)

  • Park, Byeong-Hun;Kim, Jae-Yeob
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2016.05a
    • /
    • pp.103-104
    • /
    • 2016
  • Most of studies on PC method aim at the structural analysis and development of PC members, and studies on the construction management aspect are insufficient. This study is a basic research in the construction management aspect regarding 'composite method using hollow-PC column' (HPC method), and is intended to develop assessment standards for the benefit·cost analysis of HPC method. Assessment standards for the benefit·cost analysis were composed of main-factors and sub-factors through interview with 4 experts. It was possible to classify main-factors into 4 major categories, i.e,. structural performance, construction performance, construction duration and construction cost. Sub-factors were composed of factors which were of high importance in assessing the two methods. And factors judged to be repeated or of little importance were excluded.

  • PDF

A study on the Research & Analysis of the Health and safety Managing's Understanding for practical Application of Construction Industry Risk Assessment - Focus on worker - (건설업 위험성평가 실무적 적용을 위한 안전보건 인식도 조사 연구 -근로자를 중심으로-)

  • Choe, Su-Hwan;O, Tae-Geun;Lee, Yeon-Su;Lee, Jin-Seop
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2013.04a
    • /
    • pp.445-456
    • /
    • 2013
  • According to Department of labor guideline "2012-104 (2012.9.26.)" This study is to suggest the basic information and the improvement for the application of risk assessment on a construction site by group interview & survey of construction worker who is the practice of the subject and then numerical analysis about awareness and action plan of Safety and health. The result of group interview and survey of construction worker, most of construction worker feel the danger during the work. Then construction worker analysis results that risk assessment helps to change & raise awareness of safety and reduce an industrial disaster. Easy Safety management activity such as TBM & safety education active will be necessary for safe worksite and then I suggest the TBT(tool box talk) active which combines TBM & safety education.

  • PDF

Development of Measurement Method of Musculoskeletal Load for Construction Workers using Wearable Motion Recognition Sensor (웨어러블 장비를 이용한 건설 근로자 근골격계 부하 측정방안 제시)

  • Pyo, Ki-Youn;Lee, Dong-Min;Cho, Hun-Hee;Kang, Kyung-In
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.05a
    • /
    • pp.123-124
    • /
    • 2019
  • In the labor-intensive construction site, potential threats of the musculoskeletal diseases mainly caused by various repetitive physical tasks, vulnerable environment, and the aging of the labor worker exist. However, quantitative measuring method of construction labor worker's work posture has not been improved yet. This study proposed musculoskeletal measuring method by using wearable motion recognition sensor for quantitative evaluation and analysis of working posture of construction workers. This method is expected to be used as a basic data for posture analysis and prevention construction safety accidents, as well as physical workload and labor productivity analysis by labor work type.

  • PDF

Study on the Satisfaction Analysis for Development of Construction Estimating Manager based on 3D Data (BIM기반 건축적산 매뉴얼 개발을 위한 만족도 분석에 관한 연구)

  • Choi, Chang-Hoon;Lee, Junbok;Han, Choong-Hee;Soh, Ji-Yoon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.11a
    • /
    • pp.222-223
    • /
    • 2014
  • According to the improvement of IT technology, an enhanced efficiency of management system in the construction industry is expected since a quotation system with BIM (Building Information Modeling) technique effectively estimates construction materials. For an enhanced efficiency of management system, related guidelines, standards, and manuals based on BIM are required, but the lack of this information causes difficulty to utilize in practice. In the paper, the satisfaction analysis was performed in order to promote the completeness of construction estimating manager that can be presented criteria and details of BIM-based quantity-takeoff, classification criteria.

  • PDF

Work Time of Basement Composite Wall Form Assembly by Work Time Analysis (작업분석을 통한 합벽거푸집 구성 요소별 작업소요시간에 관한 연구)

  • Heo, Kyoung-Moo;Kim, Myoung-Hyun;Kim, Tae-Hui;Kim, Jae-Yeob;Kim, Gwang-Hee
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2009.11a
    • /
    • pp.9-13
    • /
    • 2009
  • Recently, construction in downtown is often done closely at the adjacent building. In this case, underground construction need to Basement Composite Wall(BCW) construction. However, generally, during the construction process of BCW form works have many problems that are narrow working space and inefficient time consuming. Despite of these problems, there was no quantitative research for the work time of BCM assembly. Therefore, in this study, work time of CBW form assembly in underground construction is identified by the work analysis. The results of this study reveal that buttress work of basement form take lots of time in the entire work process of Basement Composite Wall form assembly.

  • PDF