1 |
D. Y. Park "2013 Construction Business View", Industrial Economy the Team Reports of Hana Institute of Finance, pp. 6-9, 2012.
|
2 |
J. B. Lee, "A Study on Quantifying the Risk of Bridge Construction Index", KOSHA Construction Safety Research Project Report, pp. 20-153. 2006.
|
3 |
KOSHA, "Tank Construction of Understanding", Moduletype Material 2010-M-278, pp. 4-28.
|
4 |
KOSHA, "Tank Construction Serious Disaster Case", http://www.kosha.or.kr, 2001.9-2012.6
|
5 |
KOSHA, "Risk Assessment Model in Construction by Type", pp. 12-19. 2007.
|
6 |
J. -B. Lee, J. K. Lee and S. R. Chang, "A Study on the Risk Level of Work Types in Nuclear Power Plant Construction", Journal of the Korean Society of Safety, Vol. 28, No.3, pp. 95-99. 2013.
과학기술학회마을
DOI
|
7 |
S. E. SEO, "A Study on Accident Prevention using Risk Index in the Bridge Construction", PhD Thesis, Myongji University, pp. 46-80. 2009.
|
8 |
M. K. Lee, M. J. Jeong, K. D, Kim, S. J. Choi and S. K. Park, "The Assessment of the Risk Index in the Bridge Construction by the AHP Method "Journal of the Korean Society of Safety, Vol. 24, No.6, pp. 119-123, 2009.
과학기술학회마을
|
9 |
J. -h. Park, "Analysis of Accident Frequency and Accident Severity in the Construction Sites", Thesis for Ph. Doctor Incheon University, Incheon, pp. 64-72, 2010.
|