Collaborative Process to Facilitate BIM-based Clash Detection Tasks for Enhancing Constructability

  • Seo, Jung-Ho;Lee, Baek-Rae;Kim, Ju-Hyung;Kim, Jae-Jun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.12 no.3
    • /
    • pp.299-314
    • /
    • 2012
  • One of reasons for introducing Building Information Modeling (BIM) is to support clash detection tasks by means of a 3D product model. In the conventional construction project process, clashes have been found during construction phase. However, it can cause cost overrun and time delay. In order to investigate and correct clash detections at design phase, relevant business process and guide for this task should be provided. This study aims to identify hindrances in clash detection tasks at the design phase and analyze its current process using IDEF0 model. Despite the convenience of IDEF0 as a systems analysis tool, professional participants might have difficulties to understand their own tasks according to business process. For this reason, in this research, Business Process Model and Notation (BPMN) is introduced to provide ideal process and required decision making governance. The provide BPMN model will provide insights for a BIM-based collaborative environment to enhance the constructability through the construction project.

Enhancing Seismic Performance of Exterior R.C. Beam-Column Connections Using Headed Bars (헤디드 바를 사용한 외부 철근콘크리트 보-기둥 접합부의 내진성능 향상)

  • Shin, Hyun Oh;Yang, Jun Mo;Yoon, Young Soo
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.15 no.3
    • /
    • pp.186-194
    • /
    • 2011
  • The reinforced concrete beam-column connections are in lack of constructability and are likely to show anchorage failure because of the complex details of joint regions. Under seismic loads, a destruction of the column or the beam-column joint leads to collapse of the whole structures. For this reason, the safety of structures has to be guaranteed by following procedures which are based on the strong column-weak beam design concept: 1) failure of beam by generating plastic hinge in the beam maintained a certain distance from the surface of column, 2) failure of column or beam-column joint. In this study, headed bars were used as longitudinal reinforcements of beam and joint reinforcements in order to improve the strength and constructability of joint and to relocate plastic hinge. The finite element analyses (FEAs) were performed to the reinforced concrete beam-column joints utilizing headed bar reinforcements. To verify the availability of the analysis models, the FEAs for experimental tests performed by previous researchers were conducted and compared with the experimental results. Additional variables are also considered to confirm the excellence of headed bars. Analysis results indicate that the constructability of beam-column connections can be improved by using headed bars for the full anchorage of longitudinal reinforcements of beam under similar structural performance. In addition, the plastic hinge was relocated to the intended place by using headed bars as joint reinforcements. Under cyclic displacement loading, the energy dissipation capacity and ultimate stress were increased and the decrease in stiffness was minimized.

An Analysis of Constructability and Economic Efficiency for Pipe Work using Insert & Coupling Joint Method (일체형 삽입식 신속 연결구를 이용한 건축 배관 연결 공법의 시공성 및 경제성 분석)

  • Kim Tae-Hoon;Kim Dae-Won;Suk Sung-Joon;Park Chul;Lee Jun-Seo;Kang Kyung-In
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2006.05a
    • /
    • pp.189-194
    • /
    • 2006
  • The internal construction industry is not situation of cost reduction based on low wages anymore by the increase in wages as insufficient supply of stilled workers. Recently remodeling constructions that only need to change facilities as to stay the existing structures are on the increase. Now the method of piping facility used to remodeling construction needs stilled workers, large work space and a variety of tools. These complex construction process have a difficulty of high-quality and economical construction. In addition it have the hish incidence of warranty and a problem of cost increase as a commitment of manpower by warranty repair. In order to solve these problems it is necessary for appropriate new technology to the internal construction environment. Piping fittings by Insert & Coupling Joint is a method that unskilled workers can be easily constructed though one touch set up and it is convenient to maintain for repair work of piping facility. This technology show the effect of 3 percentages labor cost reduction as compared with piping fittings by press joint on apartment 500 households. Therefore this technology is supposed that attain a cost reduction though the technical and economical construction and a client satisfaction though the high-quality construction on the present construction market.

  • PDF

A SIMULATION MODEL FOR DECIDING AN OPTIMIZED 3D SHAPE OF CONSTRUCTION WORKSPACE CONSIDERING RESOURCES IN BIM ENVIRONMENT

  • Hyoun Seok Moon;Hyeon Seung Kim;Leen Seok Kang;Byung Soo Kim
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.163-168
    • /
    • 2013
  • A construction workspace is considered as a critical factor to secure constructability and safety of a project. Specially, optimized size of each workspace helps to minimize any conflicts between workspaces, works and resources within a workspace in the construction site. However, since an existing method for making a decision workspace's size depends on generally experiences of managers and work conditions of activity, it is difficult to perform safe works considering feasible workspace size. The workspace size is changed according to the quantity of resources allocated into each activity as time progresses. Accordingly, it is desirable that optimized workspace size considering input size of resources is determined. To solve these issues, this study configures an optimized model for deciding standard size of workspaces by simple regression analysis and develops a visualized scenario model for simulating the optimized workspace shape in order to support BIM (Building Information Modeling) environment. For this, this study determines an optimized resource shape size considering maximum working radius of each resource and constructs its visual model. Subsequently, input size of resources for each activity is estimated considering safety execution area of resources and workspaces. Based on this, an optimized 3D workspace shape is generated as a VR simulation model of a BIM system based on the suggested methodologies. Moreover, operational feasibility of the developed system is evaluated through a case study for a bride project. Therefore, this study provides a visualized framework so that project managers can establish an efficient workspace planning in BIM environment. Besides, it is expected that constructability, productivity and safety of the project will be improved by minimizing conflicts between workspace and congestions between resources within a workspace in the construction phase.

  • PDF

A Study of Field Construction Process Analysis and Economic evaluation of Ready-mixed Shotcrete (레디믹스트 숏크리트의 현장 시공프로세스 분석 및 경제성 평가)

  • Kim, Dong-Min;Ma, Sang-Joon
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2010.09a
    • /
    • pp.1322-1327
    • /
    • 2010
  • Ready-mixed shotcrete mixed with high quality materials and can be controled shotcrete quality is producted in plants and transported to construction fields, so do not need a field batch plant. In this study, the field construction system that can be applied Ready-mixed Shotcrete to construction fields was proposed, and the all-in-one silo that was the key component of the field construction system was design. It was performed to evaluate the constructability that the field construction process analysis in case of applying a field batch plant and the all-in-one silo, the cost analysis of the material production and transport in a road tunnel was also performed to evaluate the economic feasibility of Ready-mixed shotcret.

  • PDF

Deformability and Confinement of Structural Wall with Boundary Element (단부횡보강된 구조벽의 변형능력 및 보강방법)

  • 강수민;박홍근
    • Proceedings of the Earthquake Engineering Society of Korea Conference
    • /
    • 2003.03a
    • /
    • pp.349-361
    • /
    • 2003
  • For performance-base design using nonlinear static analysis, it is required to predict the inelastic behavior of structural members accurately. In the present study, nonlinear numerical analysis was performed to develop the method describing the moment-curvature relationship of structural wall with boundary confinement. Through the numerical analysis, variations of behavioral characteristics and failure mechanism with the arrangement of vertical reiforcement and the length of boundary confinement were studied. Based on the findings, moment-curvature curves and curvature capacity for walls with a variety of re-bar arrangement was developed. By equalizing curvature capacity to demand, a design method which can determine the length of boundary confinement, was developed and for the effectiveness of boundary confinement and constructability, boundary confinement detail was proposed.

  • PDF

Corner Steel plate-Reinforced Core Wall System

  • Park, Hong-Gun;Kim, Hyeon-Jin;Park, Jin-Young
    • International Journal of High-Rise Buildings
    • /
    • v.8 no.3
    • /
    • pp.193-199
    • /
    • 2019
  • For better structural performance and constructability, a new composite core wall system using steel plate columns at the corners of the core section was developed. Using the proposed core wall, nonlinear section analysis and 3-dimensional structural analysis were performed for the prototype core wall section and super high-rise building, respectively. The analysis results showed that, when compared to traditional RC core wall case, the use of the corner steel plate columns provided better structural capacity, which allows less wall thickness and re-bars. Further, due to such effects, the construction cost and time can be reduced despite the use of steel plate columns.

The Application of the AHP Analysis Method to Prepare the Selection Standards for the Target Site of Check Dams (사방댐 대상지 선정 기준마련을 위한 AHP 분석기법의 적용)

  • Bea, Hyun-Seok;Lee, Kwang-Youn;Choi, Young-Jin;Lee, Jin-Ho;Woo, Choong-Shik;Chun, Kun-Woo
    • Journal of Korean Society of Forest Science
    • /
    • v.109 no.4
    • /
    • pp.446-453
    • /
    • 2020
  • By applying the Analytic Hierarchy Process(AHP) method, we calculated the weight of factors related to the selection of check dam sites and generated basic data related to the selection of the target site. As a result of the AHP classification, three evaluation items(Susceptibility, Vulnerability, and Constructability), 12 evaluation factors (Susceptibility 10, Vulnerability, and Constructability 1), and two-six evaluation criteria in each evaluation factor were selected. After calculating the relative importance by using the selected evaluation items, evaluation factors, and criteria, the vulnerability items such as medical facilities, facilities for the aged, educational facilities, and private homes were found to be higher than the other items. When the relative weight for deciding qualified sites was applied to the forest watersheds in the Gangwon region, 8,601 forest watersheds(35.2 % of the total forest watersheds) were found to be suitable for the installation of check dams.

A case study on efficient non pilot 2-Arch Tunnel in the urban (도심지에서 효율적인 무도갱 2-Arch 터널의 설계사례)

  • Yoon, Il-Byung;Kang, Hee-June;Kim, Hong-Dae;Kim, Dong-Sik
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2010.03a
    • /
    • pp.543-552
    • /
    • 2010
  • Due to increase in urban tunnelling as urban population and traffic volume increase, problems related with site security and civil appeal also increase. This paper presents a comparative analysis between conventional 2-arch tunnel method and non-pilot 2 arch tunnel method, which were performed in the basic design of Wie-Rae region. According to the analysis results, non-pilot 2-arch tunnel method is more efficient in terms of stability, constructability, and economic aspect. It is authors' wish that design procedure and method presented in this paper could help the design and construction of non-pilot 2-arch tunnel that should be planned in the near future.

  • PDF