• 제목/요약/키워드: connection bar

검색결과 163건 처리시간 0.027초

DIFFERENTIAL GEOMETRIC PROPERTIES ON THE HEISENBERG GROUP

  • Park, Joon-Sik
    • 대한수학회지
    • /
    • 제53권5호
    • /
    • pp.1149-1165
    • /
    • 2016
  • In this paper, we show that there exists no left invariant Riemannian metric h on the Heisenberg group H such that (H, h) is a symmetric Riemannian manifold, and there does not exist any H-invariant metric $\bar{h}$ on the Heisenberg manifold $H/{\Gamma}$ such that the Riemannian connection on ($H/{\Gamma},\bar{h}$) is a Yang-Mills connection. Moreover, we get necessary and sufficient conditions for a group homomorphism of (SU(2), g) with an arbitrarily given left invariant metric g into (H, h) with an arbitrarily given left invariant metric h to be a harmonic and an affine map, and get the totality of harmonic maps of (SU(2), g) into H with a left invariant metric, and then show the fact that any affine map of (SU(2), g) into H, equipped with a properly given left invariant metric on H, does not exist.

PS 강봉으로 일체화된 강합성 라멘교의 개발을 위한 실험연구 (Experimental Study for Development of the Steel-Concrete Composite Rigid-Frame Bridge Integrated with PS Bar)

  • 안영수;정지승
    • 한국안전학회지
    • /
    • 제27권4호
    • /
    • pp.50-61
    • /
    • 2012
  • In recent years, various research and developments to introduce composite bridges of new concept have been performed. The types of integral bridge and portal rigid frame bridge are having advantages in bridge maintenance and structural efficiency by eliminating expansion joints and bridge supports. However, the detail of typical girder-abutment connection has problems such as complexity of construction and increase of the construction cost. A new type of bridge, called prestress integral composite girder(PIC girder) bridge, is proposed in this study, which decreases the cost of construction and improves the efficiency of construction by simplifying the detail of construction for girder-abutment connection. PIC girder bridge has the connection detail in which the steel girder and the abutment are integrated by using the PS bar installed in the connection. In this study, finite element analysis and mock-up load test are conducted to evaluate the propriety of design, the effective of fabrication and structural safety for PIC girder bridge. The adequacy of the PIC giredr bridge is verified by the results of static/dynamic load test and finite element analyses.

Cyclic behavior of connection between footing and concrete-infilled composite PHC pile

  • Bang, Jin-Wook;Hyun, Jung Hwan;Lee, Bang Yeon;Kim, Yun Yong
    • Structural Engineering and Mechanics
    • /
    • 제50권6호
    • /
    • pp.741-754
    • /
    • 2014
  • The conventional PHC pile-footing connection is the weak part because the surface area and stiffness are sharply changed. The Composite PHC pile reinforced with the transverse shear reinforcing bars and infilled-concrete, hereafter ICP pile, has been developed for improving the flexural and shear performance. This paper investigates the cyclic behavior and performance of the ICP pile-footing connection. To investigate the behavior of the connection, one PHC and two ICP specimens were manufactured and then a series of cyclic loading tests were performed. From the test results, it was found that the ICP pile-footing connection exhibited higher cyclic behavior and connection performance compared to the conventional PHC pile-footing connection in terms of ductility ratio, stiffness degradation and energy dissipation capacity.

반복하중을 받는 프리캐스트 콘크리트 보-기둥 접합부의 거동 연구 (Performance of Precast Concrete Beam-Column Connections Subjected to Cyclic Loading)

  • 김규리;박홍근
    • 한국콘크리트학회:학술대회논문집
    • /
    • 한국콘크리트학회 2004년도 추계 학술발표회 제16권2호
    • /
    • pp.619-622
    • /
    • 2004
  • In this study, a moment resisting precast concrete beam-column connection is proposed. An experimental study was carried out to investigate the connection behavior subjected to cyclic loading. Three precast beam-column interior connections and one monolithic connection were tested. Variable included the detailing used at the joint to achieve structural constructability and the location of mild steel reinforcement and high strength bar. During specimen fabrication, the joint details enables ease and speed of construction. Connection performance is evaluated on the basis of ductility, energy dissipation capacity, connection strength, and drift capacity. Based on test results, the precast concrete beam-column connection is capable of matching or exceeding the performance of the monolithic connection.

  • PDF

초고강도 철근이음의 경제성 평가모델 개발에 관한 연구 (A Study on the Economic Evaluation Model of Splice of Reinforcement Bar(SD500))

  • 김재엽;김대원
    • 한국건축시공학회지
    • /
    • 제8권1호
    • /
    • pp.71-76
    • /
    • 2008
  • Recently, the high-rise apartment housings have become a prototype of the urban residential dwelling in Korea and the numbers of one have steadily been increasing. According to this trend, the strength of the construction materials is also fortified to assure the stability and durability of the buildings. Specially, Re-bar of SD500 type is largely used at the construction sites of high-rise building. This study analyzes the current usage of SD500 high-strength re-bar at domestic construction sites. Through the result of this analysis, we develop Economic Evaluation Model that measure economic efficiency of lap splice and coupler splice, which are most commonly used in connection SD500. The evaluation method was applied to construction sites in Seoul in December 2006, and the result revealed that coupler splice is relatively superior in terms of cost efficiency when the re-bar diameter is longer and the concrete strength is lower.

반복하중을 받는 외부 보-기둥 접합부에서 작은 헤드를 사용한 Headed Bar적용 (Application of Headed Bars with Small Head in Exterior Beam-Column Joints Subjected to Reversed Cyclic Loads)

  • 하상수;최동욱;이창호
    • 콘크리트학회논문집
    • /
    • 제19권4호
    • /
    • pp.411-420
    • /
    • 2007
  • 본 연구는 반복 수평 하중을 받는 외부 보-기둥 접합부에서 작은 헤드를 사용한 headed bar의 사용성을 검증하기 위해 $90^{\circ}$ 표준갈고리로 정착한 실험체와 headed bar로 정착한 접합부 실험체를 제작하여 각각의 실험 결과를 비교하였다. 또한, headed bar 정착 성능에 영향을 주는 헤드 단면적, 단조 및 반복 가력 여부, 헤드와 보강근의 용접 여부등의 headed bar 인발 성능에 관한 영향을 구명하기 위한 인발실험을 병행하였다. 인발실험의 결과, headed bar의 인발강도는 헤드 면적 증가에 따라 증가하였고, 헤드와 보강근의 용접 유무, 가력 조건 (단조하중 및 반복하중)은 실험 결과에 큰 영향을 미치지 않는 것으로 나타났다. 외부 보-기둥 접합부 실험의 결과, $90^{\circ}$ 표준갈고리로 정착한 실험체와 headed bar로 정착한 실험체가 초기 균열, 균열의 발생 등 모두 거의 비슷한 양상이었으나, 최종 파괴 시에는 headed bar로 정착된 실험체가 $90^{\circ}$ 표준갈고리로 정착된 실험체에 비해 최대 강도 도달 이후 연성 거동, 연성비 및 변형 성능, 에너지소산 면적 등에서 우수한 거동을 보여주었다. 따라서 ACI 352 위원회의 설계지침을 따라서 제작된 접합부 상세와 동일한 조건으로 표준갈고리 대신 상대적으로 작은 headed bar를 사용할 수 있을 것으로 판단된다.

프리캐스트 콘크리트 벽체 수직접합부의 광폭형 연결방식 개발 (Development of Wide Connection Method for Vertical Joints of Precast Concrete Walls)

  • 최은규;신영수
    • 콘크리트학회논문집
    • /
    • 제21권5호
    • /
    • pp.549-556
    • /
    • 2009
  • 이 연구에서는 프리캐스트 콘크리트 구조시스템에서 기존에 사용되고 있는 벽체의 수직접합부의 시공 및 문제점을 최소화하기 위해 접합부의 폭을 100 mm에서 150 mm로 증가시키고 연결방식을 3가지로 하여 구조적 성능 및 적용성에 대해 분석하였다. 또한, 해석적으로 구조적 성능을 파악하기 위해 비선형 유한 요소 해석법으로 분석하였다. 분석 결과, 광폭형 연결부를 가진 접합부를 적용하였을 때, PC벽체에 가해지는 하중을 더 효율적으로 철근이 분담하여 내력이 증가하고 연성적인 거동을 하는 것으로 나타났다. 또한, 접합부 루프근의 단면적이 커질수록 그리고 철근 개수가 증가할수록 최대내력이 증가하며 광폭형 접합부 형식 중에 용접형-링형-C형의 순서로 내력이 큰 것으로 나타났다. 용접형의 경우 현장조건에 따른 변화가 발생할 수 있으므로 광폭형 연결 부위를 링형 접합부로 하는 것이 안정적인 거동을 하며 현장 용접의 철저한 품질관리가 필요하다.

배관 해석 프로그램을 통한 해수담수화 플랜트 수압 시스템 분석 (Analysis of hydraulic system for seawater desalination plant through piping analysis program)

  • 최지혁;최용준;양흥식;이상호;최준석
    • 상하수도학회지
    • /
    • 제34권3호
    • /
    • pp.221-230
    • /
    • 2020
  • In actual seawater desalination plant, the pressure loss due to frictional force of pipe is about 3~5 bar. Also, the pressure loss at pipe connection about 1~3 bar. Therefore, the total pressure loss in the pipe is expected to be about 4~8 bar, which translates into 0.111 to 0.222 kWh/㎥ of energy when converted into the Specific Energy Consumption(SEC). Reducing energy consumption is the most important factor in ensuring the economics of seawater desalination processes, but pressure loss in piping is often not considered in plant design. It is difficult to prevent pressure loss due to friction inside the pipe, but pressure loss at the pipe connection can be reduced by proper pipe design. In this study, seawater desalination plant piping analysis was performed using a commercial network program. The pressure loss and SEC for each case were calculated and compared by seawater desalination plant size.