• 제목/요약/키워드: connected bridge

검색결과 431건 처리시간 0.031초

레일이음매에 의한 주행면 불규칙성을 고려한 판형교의 동적거동 (Dynamic Behavior of a Open-Deck Steel Bridge considering Surface Irregularities of Rail Joints)

  • 김성일;김현민;오지택
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2004년도 추계학술대회 논문집
    • /
    • pp.1028-1033
    • /
    • 2004
  • The open deck steel bridge is the most common type in railway bridges. Steel I-shaped girders are connected with sleepers directly without ballast and moving train loads are transmitted directly to the girder, so this bridge has weak characteristics on impact. Therefore, considerable accelerations can cause unsatisfactory dynamic behavior of the open deck steel bridge. Especially, Impact created at rail joints can increase the dynamic response of the bridge and this phenomenon would be injurious to passenger comfort. In the present study, dynamic behavior of the open deck steel bridge which has a rail joint is estimated through experimental studies and bridge-train interaction analysis considering surface irregularities by rail joints.

  • PDF

일체형 가로보를 이용한 임시교량의 구조적 거동특성 (The Characteristics of Structural Behavior of Temporary Bridge Using Continuous Cross Beam)

  • 주형중;이영근;이동혁;윤순종
    • 한국강구조학회 논문집
    • /
    • 제24권5호
    • /
    • pp.559-569
    • /
    • 2012
  • 기존 임시교량은 대부분 거더의 횡-비틀림좌굴을 방지하고 시공의 효율성을 확보하기 위해 가로보를 설치하고 있다. 이 가로보는 볼트로 연결되며, 중력방향 하중에 대한 저항성능이 매우 작은 것으로 평가되고 있다. 그러나 최근 일체화된 가로보를 사용함으로써 가로보를 하중저항요소로 이용한 임시교량이 최근 개발된 바 있다. 이 연구는 새롭게 개발된 임시교량에 대한 구조적 거동 및 하중전달능력을 실험 및 구조해석 등을 통해 조사, 분석하였다. 일체로 연속된 가로보를 이용한 임시교량은 가로보의 휨강성을 통해 하중을 인접거더로 분산하여 거더에 발생하는 최대휨응력을 감소시키고, 거더의 휨강성을 증대시키는 것으로 확인되어 장경간 임시교량에서도 유리할 것으로 판단된다.

스카이브릿지 설치위치에 따른 고층건물의 진동제어 성능평가 (Performance Evaluation of Vibration Control According to Installation Location of a Sky-bridge)

  • 김현수;박용구;고현;이의현;이동근
    • 한국공간구조학회논문집
    • /
    • 제10권3호
    • /
    • pp.65-74
    • /
    • 2010
  • 본 연구에서는 스카이브릿지 설치위치 및 연결된 구조물의 고유진동주기 차이에 따른 전체 구조물의 진동제어 효과를 분석하였다. 이를 위하여 스카이브릿지로 연결된 40층과 50층 구조물을 예제 구조물로 사용하였고, 등가모형화기법을 이용하여 예제 모델을 구성하였다. El Centro 및 Taft 지진을 사용하여 경계비선형 시간이력해석을 수행하였고 구조물의 동적거동과 진동제어 효과를 분석하였다. 해석결과 변위응답은 스카이브릿지를 상부층에 설치할수록 더 효과적으로 제어할 수 있었고 가속도응답은 구조물의 중간층부근에 설치할 때 더 효과적으로 저감시킬 수 있었다.

  • PDF

스마트 스카이브릿지를 이용한 인접건물의 진동제어 (Vibration Control of Adjacent Buildings using a Smart Sky-bridge)

  • 강주원;채승훈;김현수
    • 한국공간구조학회논문집
    • /
    • 제10권4호
    • /
    • pp.93-102
    • /
    • 2010
  • 본 연구에서는 MR 감쇠기와 FPS를 사용하여 구성된 스마트 스카이브릿지를 제안하였으며 스마트 스카이브릿지로 연결된 인접건물의 지진응답 제어성능을 분석하였다. 이를 위하여 스마트 스카이브릿지로 연결된 10층과 20층 구조물을 예제 구조물로 선택하였고 근거리 (near fault) 및 원거리 (far fault) 지진의 특성을 가지는 El Centro 지진과 Kobe지진을 사용하여 시간이력해석을 수행하였다. 스마트 스카이브릿지블 효과적으로 제어하기 위해서 퍼지논리제어기를 개발하였으며 퍼지논리제어기를 최적화하기 위하여 다목적 유전자알고리즘을 사용하였다. 최적화결과 10층 건물의 지진응답과 20층 건물의 지진응답 사이에는 상충관계 (trade-off)가 있는 것을 알 수 있었고 다목적 유전자알고리즘을 통해서 두 건물의 지진응답 제어에 대한 퍼지논리제어거의 파레토 해집합을 구할 수 있었다. 수치해석결과 본 연구에서 제안한 스마트 스카이브릿지를 사용하면 연결된 건물의 지진응답을 효율적으로 저감시킬 수 있는 것을 알 수 있었다.

  • PDF

스카이브릿지를 이용한 RC 주거용 건물의 진동제어 (Vibration Control of RC Residential Building Structure Using Sky-Bridge)

  • 안상경;오정근
    • 한국콘크리트학회:학술대회논문집
    • /
    • 한국콘크리트학회 2006년도 춘계학술발표회 논문집(I)
    • /
    • pp.450-453
    • /
    • 2006
  • Coupling adjacent building with supplemental damping devices is a developing method of reduced structural response due to wind and seismic excitations. The philosophy is to allow structures, vibrating at different frequencies, to exert control forces upon one another to reduce the overall responses of the system. This paper studies the effect of installing vibration control devices of two high rise building structures(49 stories and 42 stories) connected by sky-bridge. According to the analysis results the use of sky-bridge can be effective in increasing damping ratio of the system.

  • PDF

국내외 PV PCS 기술현황 (Recent PV PCS Technology)

  • 최주엽;유권종;정영석;소정훈;최익
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 한국신재생에너지학회 2005년도 춘계학술대회
    • /
    • pp.117-122
    • /
    • 2005
  • This paper proposes an inverter for the grid-connected photovoltaic system based on the transformer-less inverter. This system consists of a high frequency converter bridge, high frequency transformer, diode bridge rectifiers, a DC filter, a low frequency inverter bridge, and an AC filter. The high frequency converter bridge switching at 20kHz is used to generate bipolar PWM pulse, and the high frequency transformer raise its voltage twice, which is subsequently rectified by diode bridge rectifiers to result in a full-wave rectified sine wave. Finally, it is unfolded by a low frequency inverter bridge to result in a 60Hz sine wave power output. Even though the high frequency link system needs more power semiconductors, a reduced size, light weight, and saved parts cost make this system more comparative than the other systems due to elimination of 60Hz transformer.

  • PDF

ACIS 솔리드 모델러를 이용한 STEP기반의 강교량정보 운용체계 (STEP-based Information Management of Steel Bridge Using ACIS Soild Modeler)

  • 이상호;정연석;김소운
    • 한국전산구조공학회:학술대회논문집
    • /
    • 한국전산구조공학회 2004년도 가을 학술발표회 논문집
    • /
    • pp.371-376
    • /
    • 2004
  • This study presents a way to generate and manage engineering information by applying steel bridge information model with 3D shape to existing application program. ACIS solid modeling kernel is used to visualize 3D geometric shape of steel bridge on the AutoCAD program. The shape information of 3D solid model can be connected to structural design information of steel bridge by an application module based on information model. The application module for manipulating steel bridge information can be easily developed by ObjectARX programming library supporting functional expansion of AutoCAD program. End-users can use the application module without any additional environmental setup on the AutoCAD. Thus this study facilitates information management of steel bridge by using ACIS solid modeler and ISO/STEP methodology.

  • PDF

Integral Bridge System with Geosynthetic-Reinforced Backfill

  • Tatsuoka, Fumio
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2007년 가을학술발표회
    • /
    • pp.39-52
    • /
    • 2007
  • A new type bridge combining an integral bridge and a pair of geosynthetic-reinforced soil (GRS) retaining walls having full-height rigid (FHR) facings, called the GRS integral bridge, is proposed. The geosynthetic reinforcement layers are connected to the FHR facings (i.e., RC parapets) that are integrated with a girder without using any girder-support. GRS integral bridges are basically much more cost-effective in construction and long-term maintenance while having a much higher seismic stability than conventional-type bridges having a girder via movable and fixed supports on a pair of cantilever abutments. GRS integral bridges are better than bridges using GRS retaining walls as abutments and also than conventional integral bridges with unreinforced backfill. To validate the above, a series of static cyclic lateral loading tests of the facing and a series of shaking table tests were performed on smallscaled models of different bridge types.

  • PDF

I형 거더교의 동력분산형 하중에 대한 동적해석 (Dynamic Analysis of I-Type Girder Bridge with HEMU Train Load)

  • 이태규;김혜욱
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2010년도 춘계학술대회 논문집
    • /
    • pp.1279-1286
    • /
    • 2010
  • This paper deals with the influence on the dynamic response of I-type girder railway bridge with high-speed electric multiple unit(HEMU) train load. This bridge system which has six I-girder and several cross beams, is modeled with plate and frame elements. And the upper slab is assumed to be fully connected with girders using rigid rinks. Span lengths, types of vehicle and running speeds are selected as parameters for analyses. For more exact analysis, it was adopted that 3-dimensional section of bridge models was produced by the assumed design wheel loads of HEMU vehicle at 200~350 km/hr speeds. Dynamic vertical deflections, dynamic amplification factors and vertical accelerations of bridges having 30 and 35 m span length were investigated and compared with the limit values specified in various national railway bridge specifications.

  • PDF

분리형 스페리칼 교량받침의 특징 및 교체실험 (Characteristics and Replacement of Separated Spherical Bridge Bearings)

  • 박성우;유승규;최은수
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2008년도 춘계학술대회 논문집
    • /
    • pp.1729-1734
    • /
    • 2008
  • This study developed a new separated shperical bridge bearing that can be used for replacement of existing bridge bearings without crushing bearing-concrete. The separated spherical bearing have the upper and lower sole plate connected by bolts to the upper plate under bridge-girders and the lower plate on bearing-concrete. The targets of the separated spherical bearing are the maximum 3 mm of up-lifting height during replacement and the maximum required time of 30 minutes. Four separated spherical bearings are manufactured and replaced the existing bearings of a railway bridge in service and the replacing tests was performed. The number of the tests is two and the target of maximum 3 mm and 30 minutes was satisfied.

  • PDF